Books on the topic 'Propellant management'

To see the other types of publications on this topic, follow the link: Propellant management.

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 43 books for your research on the topic 'Propellant management.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse books on a wide variety of disciplines and organise your bibliography correctly.

1

Kemme, Michael R. Reducing air pollutant emissions from solvent multi-base propellant production. [Champaign, IL]: US Army Corps of Engineers, Construction Engineering Research Laboratory, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Miks, Kathryn F. Reduced smoke propellant binder residue as a fuel source. [Champaign, IL]: US Army Corps of Engineers, Construction Engineering Research Laboratories, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Office, General Accounting. Space shuttle: Declining budget and tight schedule could jeopardize space station support : report to the Chairman, Subcommittee on Oversight of Government Management and the District of Columbia, Committee on Governmental Affairs, U.S. Senate. Washington, D.C: The Office, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Office, General Accounting. Space shuttle: NASA must reduce costs further to operate within future projected funds : report to Congressional requesters. Washington, D.C: The Office, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Office, General Accounting. Space shuttle: Need to sustain launch risk assessment process improvements : report to the Honorable James A. Hayes, House of Representatives. Washington, D.C: The Office, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Office, General Accounting. Space shuttle: Follow-up evaluation of NASA's solid rocket motor procurement : report to the Chairman, Committee on Government Operations, House of Representatives. Washington, D.C: The Office, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Office, General Accounting. Space shuttle: Status of advanced solid rocket motor program : report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives. Washington, D.C: U.S. General Accounting Office, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Office, General Accounting. Space shuttle: NASA's major changes to flight hardware : fact sheet for the Chairman, Committee on Science, Space, and Technology, House of Representatives. Washington, D.C: The Office, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Office, General Accounting. Space shuttle: Further improvements needed in NASA's modernization efforts : report to congressional requesters. Washington, D.C. (P.O. Box 37050, Washington 20013): U.S. General Accounting Office, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Office, General Accounting. Space shuttle: Follow-up evaluation of NASA's solid rocket motor procurement : report to the Chairman, Committee on Government Operations, House of Representatives. Washington, D.C: The Office, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
11

Office, General Accounting. Space shuttle: Issues associated with the Vandenberg Launch site : briefing report to the Ranking Miniority Member, Subcommittee on Military Construction, Committee on Appropriations, United States Senate. Washington, D.C: The Office, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
12

Office, General Accounting. Space shuttle: Follow-up evaluation of NASA's solid rocket motor procurement : report to the Chairman, Committee on Government Operations, House of Representatives. Washington, D.C: U.S. General Accounting Office, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
13

Office, General Accounting. Space shuttle: NASA faces challenges in its attempt to achieve planned flight rates : report to the Chair, Subcommittee on VA, HUD, and Independent Agencies, Committee on Appropriations, U.S. Senate. Washington, D.C: U.S. General Accounting Office, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
14

Office, General Accounting. Space shuttle: NASA's procurement of solid rocket booster motors : report to the Administrator, National Aeronautics and Space Administration and the Secretary of the Air Force. Washington, D.C: The Office, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
15

Office, General Accounting. Space shuttle: NASA's procurement of solid rocket booster motors : report to the Administrator, National Aeronautics and Space Administration and the Secretary of the Air Force. Washington, D.C: The Office, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
16

Office, General Accounting. Space shuttle: External tank procurement does not comply with Competition in Contracting Act : report to the chairman, Committee on Government Operations, House of Representatives. Washington, D.C: The Office, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
17

Office, General Accounting. Space shuttle: Readiness of the transoceanic abort landing sites : report to the Chairman, Subcommittee on Science, Technology, and Space, Committee on Commerce, Science, and Transportation, U.S. Senate. Washington, D.C: The Office, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
18

Office, General Accounting. Space shuttle: Follow-up evaluation of NASA's solid rocket motor procurement : report to the Chairman, Committee on Government Operations, House of Representatives. Washington, D.C: The Office, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
19

Office, General Accounting. Defense logistics: Unfinished actions limit reliability of the munition requirements determination process : report to the Chairman, Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate. [Washington, D.C.]: The Office, 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
20

Office, General Accounting. Defense logistics: Better fuel pricing practices will improve budget accuracy : report to congressional committees. Washington, D.C. (P.O. Box 37050, Washington 20013): U.S. General Accounting Office, 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
21

Office, General Accounting. Defense logistics: Air Force report on contractor support is narrowly focused : report to Congressional committees. Washington, D.C. (P.O. Box 37050, Washington, D.C. 20013): The Office, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
22

Office, General Accounting. Defense logistics: Actions needed to enhance success of reengineering initiatives : report to congressional committees. Washington, D.C. (P.O. Box 37050, Washington, D.C. 20013): The Office, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
23

Office, General Accounting. Defense logistics: DOD addressing concerns about its fuel depot in Norwalk, California : report to the Chairwoman, Subcommittee on Military Installations and Facilities, Committee on Armed Services, House of Representatives. Washington, D.C: The Office, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
24

F, Fisher Mark, and United States. National Aeronautics and Space Administration., eds. Propellant management in booster and upper stage propulsion systems. [Washington, D.C: National Aeronautics and Space Administration, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
25

F, Fisher Mark, and United States. National Aeronautics and Space Administration., eds. Propellant management in booster and upper stage propulsion systems. [Washington, D.C: National Aeronautics and Space Administration, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
26

Logisitcs Management Report for U.S. Navy Propellant-Actuated Devices (PAD). Storming Media, 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
27

Logistics Management Report for U.S. Navy Propellant-Actuated Devices (PAD). Storming Media, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
28

Logistics Management Report for U.S. Navy Propellant-Actuated Devices (PAD). Storming Media, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
29

W, Sullivan Kenneth, and George C. Marshall Space Flight Center., eds. An evaluation of the total quality management implementation strategy for the advanced solid rocket motor project at NASA's Marshall Space Flight Center. [Marshall Space Flight Center, Ala.]: George C. Marshall Space Flight Center, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
30

Feasibility study for a cryogenic on-orbit liquid depot-storage, acquisition and transfer (COLD-SAT) satellite: Final report for phase A study, contract period, February 1988 - March 1990. [Washington, DC]: National Aeronautics and Space Administration, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
31

D, McIntyre Stanley, and United States. National Aeronautics and Space Administration., eds. The NASA Cryogenic Fluid Management Program. [Washington, DC]: National Aeronautics and Space Administration, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
32

United States. Congress. Senate. Committee on Governmental Affairs. Subcommittee on Oversight of Government Management and the District of Columbia., ed. Space shuttle: Declining budget and tight schedule could jeopardize space station support : report to the Chairman, Subcommittee on Oversight of Government Management and the District of Columbia, Committee on Governmental Affairs, U.S. Senate. Washington, D.C. (P.O. Box 37050, Washington 20013): The Office, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
33

David, Kaplan, Sanders R. Stephen, and Lunar and Planetary Institute, eds. In Situ Resource Utilization (ISRU II) Technical Interchange Meeting: November 18-19, 1997, Lunar and Planetary Institute, Houston, Texas. Houston, Tex: The Institute, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
34

David, Kaplan, Sanders R. Stephen, and Lunar and Planetary Institute, eds. In Situ Resource Utilization (ISRU II) Technical Interchange Meeting: November 18-19, 1997, Lunar and Planetary Institute, Houston, Texas. Houston, Tex: The Institute, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
35

Carl, Bouvier, and United States. National Aeronautics and Space Administration., eds. X-33/RLV: Reusable cryogenic tank VHM using fiber optic distributed sensing technology. [Washington, DC: National Aeronautics and Space Administration, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
36

Carl, Bouvier, and United States. National Aeronautics and Space Administration., eds. X-33/RLV: Reusable cryogenic tank VHM using fiber optic distributed sensing technology. [Washington, DC: National Aeronautics and Space Administration, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
37

Carl, Bouvier, and United States. National Aeronautics and Space Administration., eds. X-33/RLV: Reusable cryogenic tank VHM using fiber optic distributed sensing technology. [Washington, DC: National Aeronautics and Space Administration, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
38

Space shuttle: NASA's plans for repairing or replacing a damaged or destroyed orbiter : report to the Chairman, Subcommittee on Investigations and Oversight, Committee on Science, Space, and Technology, House of Representatives. Washington, D.C: The Office, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
39

Space shuttle: NASA must reduce costs further to operate within future projected funds : report to Congressional requesters. Washington, D.C. (P.O. Box 37050, Washington 20013): The Office, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
40

Space shuttle: NASA's procurement of solid rocket booster motors : report to the Administrator, National Aeronautics and Space Administration and the Secretary of the Air Force. [Washington, DC]: The Office, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
41

Edward, Kramer, and Lewis Research Center, eds. Cryogenic on-orbit liquid depot-storage, acquisition and transfer (COLD-SAT) experiment conceptual design and feasibility study. [Cleveland, Ohio]: National Aeronautics and Space Administration, Lewis Research Center, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
42

Defense logistics: Requirement determinations for aviation spare parts need to be improved : report to the Secretary of Defense. Washington, D.C: The Office, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
43

Defense logistics: New 120-mm tank training round procurement will result in savings : report to the Chairman, Committee on Armed Services, U.S. Senate. Washington, D.C. (P.O. Box 37050, Washington, D.C. 20013): The Office, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography