Dissertations / Theses on the topic 'Project phases'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Project phases.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Karlsson, Karl, and Andreas Lundevall. "Project management : working methods during early project phases." Thesis, University West, Department of Technology, 2002. http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-800.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Bacha, Kirill. "DevOps compliant guidelines for project inception-elaboration phases." Thesis, Linnéuniversitetet, Institutionen för datavetenskap och medieteknik (DM), 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-84853.

Full text
Abstract:
DevOps is an ill-defined but trending approach to software development. Many companies are seduced by its promises of reduced costs and risks. DevOps life-cycle is often represented as a continuous everything, but very little is said about how to get the ball rolling. This report examines how DevOps definitions are represented in the initiation of Agile projects. By interviewing developers and mapping their project initiation activities in a DevOps context, a set of guidelines was formed. Continuous Integration and Deployment were found most prominent DevOps attributes from a developer’s perspective. The operational responsibility is skewed toward maintenance, with low interest in further adjustment.
APA, Harvard, Vancouver, ISO, and other styles
3

Pretorius, Suzaan. "The Effect of Project Types and Project Life Cycle Phases on Leadership Style." Thesis, University of Pretoria, 2019. http://hdl.handle.net/2263/72418.

Full text
Abstract:
With the current trend towards empowered teams, hierarchical company structures are increasingly being replaced by team-based ones. As a result, a shift in the classic understanding of leadership is needed and research on leadership in project management is increasing. Two major concepts have developed in recent years: shared and vertical leadership styles. This thesis reports on the development of a new Model of leadership styles that considers the effect of project types and the project life cycle phases on leadership style (vertical versus shared leadership), and how an appropriate balance between the two styles influences the likelihood of project management success. A web-based questionnaire yielded 313 complete responses and the data was analysed using hypothesis testing. Based on this empirical work and relevant literature, a novel Model is proposed. The Model explains how project types and life cycle phases influence the appropriateness of different leadership styles, and it guides the practitioner to selecting appropriate leadership styles for specific situations. Recommendations for furthering the model are discussed.
Thesis (PhD)--University of Pretoria, 2019.
NRF
Graduate School of Technology Management (GSTM)
PhD (Project Management)
Unrestricted
APA, Harvard, Vancouver, ISO, and other styles
4

Halámka, Michal. "Aplikační podpora projektového managementu investiční výstavby elektráren." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2016. http://www.nusl.cz/ntk/nusl-241553.

Full text
Abstract:
The master’s thesis deals with project management issues with a focus on the specifics of the construction of new and modernisation of old fossil-fuel and nuclear power plants belonging to ČEZ, a.s. It summarizes the project management methodology and standards and integrates them into a unified information system, thus creating a sound platform that supports all company projects in all stages of their individual life cycles. This thesis analyses the current status of the application support and proposes extensions to the information system, which significantly increase its value.
APA, Harvard, Vancouver, ISO, and other styles
5

Berndt, Shin Diana. "Information Management between Project Phases : The Value Creation Process of Recognizing Digital Waste between Construction and Operational Phases." Thesis, KTH, Ledning och organisering i byggande och förvaltning, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-297948.

Full text
Abstract:
Digitalization as a driving force in the AEC industry is no longer a new subject when talking about accelerating innovation and solving environmental challenges. Traditional approaches can limit some of these outcomes and typically imply that many issues that could have been predicted with early involvement of stakeholders, are recognized in much later stages of the project at great expense. In a long run outlook, the operational phase of a building is notably the most demanding if accounting the lifecycle perspective of a building. Still, why is O&M lagging in adopting integrated models? This thesis approaches this subject from the assumption that Information Management plays a strategic role to oversee the different demands, urgencies and use from both sides.  The first theoretical framework used was Lean Management’s main premise that value is created through the identification of waste in a continuous improvement process. The second theoretical framework presented was to analyze the findings with the intention to simulate an optimal context for information flow and understand where the biggest bottlenecks are. The findings show that the perceived value on the information added is low from actors actually feeding the model, a bit higher from project managers but an essential part of information managers responsibility. Main issues related to digitalization were directly linked to the lack of communication between teams, lack of standards across different teams as well as difficulty in finding effective and accurate information. Practical issues with high information models related by the industry also demonstrate a necessity of more roles focused on information management. A model based on the five principles of Lean Management is in equivalence to Information Management is presented and then inserted as enablers for a continuous improvement cycle. Based on the findings, further research can evaluate in more detail the view from operational teams towards information management roles.
Digitalisering som en drivande kraft i AEC-industrin är inte längre ett nytt ämne när man talar om att påskynda innovation och lösa miljöutmaningar. Traditionella tillvägagångssätt kan begränsa vissa delar av resultatet och många frågeställningar som kunde ha besvarats genom ett tidigt engagemang av intressenter, blir lösta i mycket senare skeden av projektet, till stora kostnader. På lång sikt är driftsfasen i ett byggprojekt den mest krävande när man tittar på livscykeln av en byggnad. Så varför ingår inte O&M i integrerade modeller? Denna uppsats tar sig an detta ämne utifrån antagandet att informationshantering spelar en strategisk roll för att övervaka de olika kraven, hur brådskande det kan vara och användningen från båda sidor. Den första teoretiska utgångspunkten som användes var Lean Managements huvudsakliga premiss att värde skapas genom identifiering av avfall i en kontinuerlig förbättringsprocess. Den andra teoretiska utgångspunkten som användes var för att analysera resultaten med avsikten att simulera ett optimalt sammanhang för informationsflöde och förstå var de största flaskhalsarna låg. Resultaten visar att det upplevda värdet på den tillagda informationen är lågt från aktörer som faktiskt matar modellen, lite högre för projektledare men en viktig del av informationschefernas ansvar. Problemen relaterade till digitalisering var direkt kopplade till bristen på kommunikation mellan team, brist på standarder mellan olika team samt svårigheter att hitta effektiv och korrekt information. Praktiska problem med informationsmodeller relaterade till branschen visar också att det behövs fler roller som fokuserar på informationshantering. En modell baserad på Lean Management fem olika principer är i likhet med Information Management-praxis och presenteras och infogas sedan som möjliggörare för en kontinuerlig förbättringscykel. Baserat på resultaten kan vidare forskning utvärdera mer detaljerat synen från operativa team mot informationshanteringsroller.
APA, Harvard, Vancouver, ISO, and other styles
6

Serhan, Ahmad, and Asen Draganov. "Project managers’ communication skills and stakeholder engagement in sustainable construction projects." Thesis, Malmö högskola, Fakulteten för kultur och samhälle (KS), 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-22559.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Biedenbach, Thomas. "Capabilities for frequent innovation : Managing the early project phases in the pharmaceutical R&D process." Doctoral thesis, Umeå universitet, Handelshögskolan vid Umeå universitet, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-48634.

Full text
Abstract:
Despite their recognized significance for project success and innovation, the management of the early project phases is still an under-researched area in project management. For organizations to secure a continuous stream of innovation, the utilization of capabilities is crucial for managing the early phases of R&D projects. The purpose of this dissertation is to advance the understanding of the management of the early project phases in hypercompetitive environments. The thesis addresses the research question of how organizations manage the early project phases of R&D in hypercompetitive environments for frequent innovation by taking a dynamic capabilities perspective. The first conceptual study reviews the literature covering organizational change in hypercompetitive environments with a focus on projects as the vehicle to create the necessary flexibility. The study found that organizational aspects and capabilities have to go hand in hand as enabler and facilitator for a successful emergent change process. The second qualitative study investigates how organizations organize the early project phases of R&D in the pharmaceutical industry for an outcome of frequent innovation. The findings show that an optimization of combinative capabilities that balances dynamic, project and multi-project capabilities can be used as a powerful leverage to boost the outcome of frequent innovation. The third study investigates the philosophical stances and related methodologies used within the last 15 years of project management research at the example of IRNOP conferences. The findings show that ontological subjectivism and epistemological interpretivism are dominating. Moreover, case studies and qualitative methods were the most common methods, whereas mixed method studies were lacking despite their value for developing an increasingly complex research field. The final mixed method study explores how absorptive, innovative and adaptive capabilities within the early phases of pharmaceutical R&D affect project and portfolio performance. Based on the results of quantitative study, the set of capabilities has an overall effect on the set of performance outcomes and thus confirms the results of the qualitative study that a distinct capability mix is needed in the pharmaceutical R&D process. To conclude, the dissertation has comprehensively explored the management of the early project phases through four studies and by applying a multitude of methodologies.
APA, Harvard, Vancouver, ISO, and other styles
8

Matulová, Nadežda. "Aplikace principů projektového managementu a jeho význam při implementaci informačního systému SAP." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2011. http://www.nusl.cz/ntk/nusl-223246.

Full text
Abstract:
The diploma thesis focuses on the project of SAP system implementation in the company. It clarifies the basic problems and methods of project management and further describes the application of this knowledge in practice. The outcome is feasibility study, which takes into account the factors and risks of the project.
APA, Harvard, Vancouver, ISO, and other styles
9

Bower, Douglas, and not supplied. "New Directions in Project Performance and Progress Evaluation." RMIT University. Property, Construction and Project Management, 2007. http://adt.lib.rmit.edu.au/adt/public/adt-VIT20080130.135140.

Full text
Abstract:
Dr. Bower confirmed that earned value management (EVM) is not widely adopted, and that many project managers see the methodology as being overly complex and difficult to implement. He identified several serious challenges associated with conventional EVM.and addressed the first issue by creating a new theoretical concept called Assured Value Analysis (AVA). This add-in process provides two new measures, permitting improvements to EVM that take into account the added certainty provided through procurement. Assured Value (AV) represents the budget for a future signed contract, and Expected Cost (EC) represents the agreed cost of that contract. Those measures permit the calculation of a Total Cost Variance that includes not only cost deviations to date, but also future ones to which the project team is already committed. AVA also allows conventional EVM formulae to take into account the Assured Value and Expected Cost of future signed agreements. A simple notional project is used to demonstrate the implementation of AVA. He resolved the remaining challenges and issues through realising that the isolation of project phases would provide a simplified but more dependable methodology, one that also provides features not found in conventional EVM. Significant milestones are normally planned to occur at the end of a project phase. By assessing project performance only at the end of each completed phase, performance calculations are significantly simplified.. His new technique, Phase Earned Value Analysis (PEVA) simplifies the calculation of PV, EV and AC, and also provides benefits that are not possible with EVM. Since the planned and actual phase completion dates are known, an intuitively simple but accurate time-based schedule variance and schedule performance index (i.e. SVP and SPIP) can be measured. PEVA also permits the forecasting of future phase end cost figures and phase completion dates using the phase CPI and SPI ratios. Since PEVA employs data points having specific x axis and y-axis values, those can be readily plotted and trend lines identified with standard spreadsheet functions. This is a powerful feature, as it allows key project stakeholders to visualise emerging project performance trends as each phase is completed. Finally, he successfully combined the AVA and PEVA concepts, resulting in a new EVM methodology - Phase Assured Value Analysis (PAVA) - which takes into account the assurance provided by procurement, simplifies the calculation of earned value through phases, and provides powerful forecasting and charting features. He validated this new combined approach in multiple respects. The new AVA and PEVA formulae were rigorously established and confirmed through standard algebraic procedures. The formulae were tested in sample project situations, to clearly demonstrate their functions. He argues that the PAVA approach conforms to the 32 criteria established in the United States for full EVM compliance. He presented AVA and PEVA to critical audiences at major project management conferences in North America and the UK, as well as several gaining expert criticism from organisations and practitioners. Finally, he used archived cost and schedule records to retrospectively test the combined PAVA methodology on a significant office facilities and technology program.
APA, Harvard, Vancouver, ISO, and other styles
10

Viktorin, Martin. "Programová podpora definování projektu s využitím LFM (Logical Frame Method)." Master's thesis, Vysoké učení technické v Brně. Fakulta informačních technologií, 2008. http://www.nusl.cz/ntk/nusl-235896.

Full text
Abstract:
The purpose of this work is to design and implement software support for Project Definition of LFM (Logical Frame Method). The first part is about project management and about necessity to use it for solving projects. There is description of phases of project and detailed description of logical frame method. In the second part there is system requirements analysis, description of the application via UML and implementation of application which was created in development environment Microsoft Visual Studio 2005 in C# language. There is a short summary, possible extensions and comparing with existing applications in the end of the work.
APA, Harvard, Vancouver, ISO, and other styles
11

Entero, Jeanivie, and Johanna Georgsson. "Påverkansfaktorer vid ett IT-projekt : En fallstudie om hur viktiga påverkansfaktorer bör hanteras och dess påverkan i olika faser i ett IT-projekt." Thesis, Tekniska Högskolan, Jönköping University, JTH, Logistik och verksamhetsledning, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-49940.

Full text
Abstract:
Syfte – Ett IT-projekt påverkas av faktorer som i olika faser på olika sätt leder till positiva eller negativa konsekvenser. Dessa faktorer bör identifieras, analyseras och hanteras för att skapa ett lyckat IT-projekt. Därmed är studiens syfte: Undersöka viktiga aspekter som påverkar ett IT-projekt. Metod – En fallstudie med intervjuer på ett utvalt fallföretag har genomförts. Intervjuerna har analyserats med hjälp av det teoretiska ramverket för att därefter besvara studiens två frågeställningar och uppnå syftet med studien. Resultat – Resultatet från fallstudien visar på 16 faktorer som påverkar ett IT-projekt: strategi, ledarskap, stöd, team, management, plan, extern, kultur, förändring, process, kommunikation, teknik, utbildning, användare och egenmakt. Faktorerna ledarskap, stöd, kompetens, kultur och kommunikation är betydelsefulla i alla projektets faser medan de övriga faktorerna visar sig har mer eller mindre påverkan beroende på vilken fas projektet befinner sig i. Faktorernas betydelse på projektet och faserna varierar även beroende på projektmedlemmarnas roll. Resultatet från fallstudien redogör för de tre viktigaste faktorerna som bidrar till om ett projekt blir lyckat eller ej vilka är: kommunikation, ledarskap och egenmakt. Implikationer – Studien ger en generell bild över hur påverkansfaktorer i ett IT-projekt bör hanteras. De viktigaste faktorerna i olika faser belyses, därmed kan studiens resultat finnas som en vägledning för verksamheter som arbetar med IT-projekt. Studien kan finnas som stöd för verksamheter genom att identifiera de faktorer som avgör om projektet blir lyckat eller ej. Begränsningar – Denna studie har genomförts på ett fallföretag. Om fler fallföretag blivit studerade hade reliabiliteten blivit större.
Purpose – An IT project is affected by factors in different phases that in different ways lead to positive or negative consequences. These factors should be identified, analyzed and managed to create a successful IT project. The purpose of the study is thus to: Investigate important aspects that affect an IT project. Method – A case study with interviews at a selected case company has been conducted. The interviews were analyzed using the theoretical framework in order to answer the study's two questions and achieve the purpose of the study. Findings – The result from the case study shows 16 factors that affect an IT project: strategy, leadership, support, team, management, plan, external, culture, change, process, communication, technology, education, users and empowerment. The factors of leadership, support, competence, culture and communication are important in all phases of the project, while the other factors appear to have more or less influence depending on the phase of the project. The results from the case study describe the three most important factors that contribute to whether or not a project is successful: communication, leadership and empowerment. Implications – The study provides a general picture of how impacting factors in an IT project should be managed. The most important factors in different phases are highlighted, thus the study's results can serve as a guide for businesses working on IT projects. The study can be used to support businesses by identifying the factors that determine whether the project is successful or not. Limitations – This study was conducted at one company. If more case companies had been studied, reliability would have been greater.
APA, Harvard, Vancouver, ISO, and other styles
12

Burström, Thommie. "Organizing boundaries in early phases of product development : The case of an interorganizational vehicle platform project setting." Doctoral thesis, Umeå universitet, Handelshögskolan vid Umeå universitet, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-34352.

Full text
Abstract:
This dissertation concerns the development of a new interorganizational vehicle platform in the truck industry. The studied project setting was large, and can be referred to as a mega project. I ask the question How are boundaries organized in an interorganizational vehicle platform project setting, and how can we understand the tensions which arise when such organizing is performed? I assume that tensions arise in relation to questions concerning novelty, interdependencies, and differences.  Tensions should therefore not be seen as something bad, tensions are rather a prerequisite for achieving change.   The overall aim is to create insights in how boundaries in an interorganizational platform project setting are organized between: projects and governing actors, projects and permanent organizations, projects and external organizations, projects and projects, and finally inside projects (between different functions).  A secondary aim is to understand the roles which actors, activities and objects play, and the tensions which are experienced, when boundaries are being challenged and organized.   The study was performed during the concept phase, and a practice approach was used in order to capture the inner life of projects. A project setting with three projects was studied for three months, where I performed 68 interviews and observed 32 meetings. I have used a mix of narrative and alternate templates strategies and induced themes which constitute the base for the analysis.   I assume that boundaries are socially constructed and I argue that traditional normative findings in project management studies should be complemented with findings from organizational theory, and therefore use a multidisciplinary theoretical base. I have combined theories relating to; boundary construction, projects, boundary actors, activities, objects, and coordination/integration.   My analysis consists of two parts, in the first part I analyze value-, mandate-, and structural tensions and finds that actors in the setting; organize a commonality balancing area where decisions are affected by a mandates filter and need to be understood in relation to a coopetitive tensions model. In the second part of the analysis I have found that actors in the setting balance tensions and organize boundaries by performing four major Quality improvement loops based on a fragmented value base where boundary activities should be seen as having three dimensions; administrative, sharing, and political.   The creation of the shared platform is simultaneously affected by strategic, operational, and functional efforts.  This fact in combination with the size and uniqueness of the project setting, leads to the insight that technological innovation must be accompanied by organizational innovation. Therefore I have suggested that organizing of boundaries in interorganizational vehicle project settings should be understood as being performed through Concurrent Boundary Enactment.
APA, Harvard, Vancouver, ISO, and other styles
13

Švára, Karel. "Ekonomické a finanční zhodnocení developerského projektu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227044.

Full text
Abstract:
The work deals with the evaluation of economic effectiveness and financial feasibility of the real development project. The theoretical part is devoted to the characteristic of term of investment, describes its types and strategies, types of investment project and thein financing options. Then there are defined phases of an investment process and there are described the methods of an economic and financial evaluation of investment projects. In the practical part there is made the characteristic of project and its evaluation. It is structured into two parts. In the first part there is reviewed the real situation of financing and in the second part there is evaluated a variant with a measure for financing of the project. The project is evaluated at the end.
APA, Harvard, Vancouver, ISO, and other styles
14

Worsch, Filip. "Fúze společností z hlediska projektu migrace dat." Master's thesis, Vysoká škola ekonomická v Praze, 2013. http://www.nusl.cz/ntk/nusl-165109.

Full text
Abstract:
This work deals with the data migration during the process of mergers and acquisitions. The first, theoretical part, defines the general terms concerning mergers and acquisitions, further mentions motives that may lead to it, and the basic stages of the implementation process of mergers and acquisitions. This section also presents brief information on selected methodologies of project management, of which principles are used in the next part, dealing with data migration projects. The aim of this work is to develop a methodology for project management of data migration in mergers and acquisitions process, which may serve as a guide for merging companies and data migration teams. In the methodology there are specified activities and defined procedures to be followed in the various stages of the project life cycle. To each activity the way and necessary prerequisites for carrying out are specified. The methodology also describes common problems with which the data migration project in carrying out the action may be faced and which could threaten the success of the project or its part. For each potential problem a possible way to eliminate it is added, or solutions.
APA, Harvard, Vancouver, ISO, and other styles
15

Pluhař, Ondřej. "Zhodnocení projektu a návrh metodiky projektového řízení." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2012. http://www.nusl.cz/ntk/nusl-223392.

Full text
Abstract:
The diploma thesis focuses on project management – managing of software development activities. It explains a basic terms of given issue and it also deals with advantages and disadvantages of some known practices and methods which are often followed when developing software. The practical part includes an analysis and evaluation of concrete project. This project is then the base for designing an optimization of software development methodology. Designed optimization will be able to help manage similar projects in future.
APA, Harvard, Vancouver, ISO, and other styles
16

Burgers, Jan Henri. "Managing corporate venturing multilevel studies on project autonomy, integration, knowledge relatedness, and phases in the new business development process /." Rotterdam : Rotterdam : Erasmus Research Institute of Management (ERIM), Erasmus University Rotterdam ; Erasmus University [Host], 2008. http://hdl.handle.net/1765/13484.

Full text
APA, Harvard, Vancouver, ISO, and other styles
17

Vozáková, Petra. "Optimalizace nákladů investičního záměru." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-225984.

Full text
Abstract:
This diploma’s thesis deals with a cost optimization of the concrete investment plan, which is a public procurement called Hospital in Hodonín reconstruction. In the theoretical part of the thesis there is information about construction (investment) project, about its organization and legislation focused on contract for work. The practical part contains cost optimization of concrete project. In the end the final evaluation of the procurement for competitive tendering and the confrontation with other contenders’ procurements are made.
APA, Harvard, Vancouver, ISO, and other styles
18

Boström, Linn Caroline. "The Representativity of Energy Models : A case study analysing causes for discrepancies affecting major system components and project phases when simulating energy demand." Thesis, KTH, Energiteknik, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-281240.

Full text
Abstract:
In order to clarify factors affecting energy simulations and their relation to real-world processes and results, this thesis sought to analyse how representative energy simulations and calculations are in relation to the in-use energy utilization of a building. This was done by firstly conducting a literature study which illustrate the major system components as well as project phases’ discrepancy factors. Thereafter an explorative case study was performed where the 2014 energy model was re-modelled, the building’s in-use energy utilization and discrepancies were audited, followed by a mapping of the mentioned discrepancies to identified factors. Major findings within the study were that the simulated total energy use was representative of the audited energy use intensities, however the division of subsystem energy use was not. Discrepancies causing this gap between model and reality affected all major energy components as well as phases. The representativity was affected by in-built factors, lack of integration of system design revisions and a lack of knowledge regarding e.g. tenant behaviour when simulating the building. Furthermore, faults and issues which arose during system installation and operation were identified. Lack of data from the in-use system further widened the gap between model and reality due to the assumptions and simplifications needed for the in-use system evaluation. Regarding the representativity, as there is no definition for the term, it is impossible to conclude exactly how representative the model was. The final result is that it can be said that the original model was partly representative, while a comprehensive re-simulation implementing all intentional discrepancies, including both input changes as well as energy system revisions, rendered the most representative result. Further, there were five process improvements described in order to improve representativity throughout the project process; 1) Model the system as extensively as possible, do not oversimplify units, 2) Note “invisible” input data, 3) Use iterative modelling to ensure representativity by implementing the final system design and simulating, 4) Ensure a greater utilization of the designed system, such as installing all specified meters and logging data properly, as well as 5) Define key numbers related to meters and units and present these under a specific heading in the energy report in order to decrease discrepancies, increase measurement data and ease analysis of the in-use system.
Då byggnaders funktion som skydd samt komfort tas för givet, har fokus förflyttats till hållbarheten hos byggd miljö de senaste decennierna. Ett viktigt begrepp gällande detta är den energikonsumption som är kopplad till användningen av byggnader. Trots ansträngningar för att minska denna energianvändning, har den samt de relaterade CO2-utsläppen nått en statistisk toppnotering de senaste åren. I Sverige är en av de nämnda ansträngningarna att implementera energikrav som måste uppfyllas för att få bygglov. Vidare, har incitament som certifieringar framgångsrikt introducerats på marknaden, där energikraven är striktare än de lagstiftade. Denna framtida energianvändning förutsägs oftast med hjälp av energisimuleringar av byggnaden. Representativiteten för en sådan modell undersöktes geom en fallstudie av ett flerfamiljshus kallat Paradiset i Stockholm, som certifierades som Miljöbyggnad Silver år 2014. Det ursprungliga modellen som användes då jämfördes med de tekniska systemdokumenten, och sedan även med resultaten av en energigenomgång av fastigheten i bruk 2020. Detta inkludrade att identifiera avvikelser och deras bidragande faktorer mellan var och en av iterationerna av byggprojektet, samt att relatera dessa till de tre relevanta faserna inom projekteringsprocessen. Den kartlagda energianvändningen verifierades även med hjälp av fem branschmetoder för att utvärdera ifall dessa kan hantera och minimera effekten av avvikelserna mellan modell och verklighet. Eftersom det är omöjligt att uttrycka representativitet numeriskt, användes denna kartläggning samt uppradning av avvikelse och orsakande faktorer för att belysa hur väl simuleringen speglar förrukningen då systemet är i drift. Resultaten visar att trots den närliggande totala specifika energianvändningen mellan modell och verklighet, speglades inte undersystemens energianvändning lika väl. Skillnaderna som påverkade detta inträffade inte enbart mellan modell och installerat system, utan är även inbyggda i modellen genom översimplifieringar av energisystemet. Vidare har reviderad systemdesign som ej modellerats ytterligare separerat modell och verklighet då en ny iteration av modellen ej simulerats, Analyser visar att byggnadens energisystem inte användes till sin fulla potential. Vidare var vissa avvikelser möjliga att förhindra genom förbättrade processer för projektering, medan andra var kategoriserade som oundvikliga och kunde ej representeras i en simulering. Användningen av verifieringsmetoder hanterade inte alla avvikelser; dock presterade den komplexa omsimuleringen, som implementerade alla systemavvikelser som kunde modelleras, det resultat som närmade sig den utvärderade energianvändingen mest. De presenterade processförbättringarna beskrev att utformade system bör modelleras så omfattande som möjligt för att undvika översimplifiering av komplexa system och deras interaktioner. Vidare är det viktigt att notera "osynlig" indata så som scheman i energirapporten för att understryka vikten av sådana antaganden. För att representera energisystemet fullt ut är det även viktigt att iterativt modellera systemet då nya beslut tas, så att alla revisioner är implementerade i den slutgiltiga modellen. Den faktiska användningen och skötseln av systemet i byggnaden är även viktig för representativiteten då detta dels påverkar hur väl det kan utvärderas, men också för att maximalt utnyttja potentialen för energireduktion inom energisystemet. Den slutgiltiga föreslagna förbättringen för denna process är att definiera nyckeltal för installerade enheter samt mätare för att säkerställa installationen av dessa och förenkla framtida energianalyser.
APA, Harvard, Vancouver, ISO, and other styles
19

Rashidi, Ehsan. "Förstudier av kommersiella fastigheter : En analys av arbetssätt ur ett projektledarperspektiv." Thesis, Mälardalen University, School of Sustainable Development of Society and Technology, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-7654.

Full text
Abstract:

This thesis is written at WSP management and investigates the practice of pre-project planning and feasibility studies at Swedish construction companies, through the study of the ongoing feasibility study of the mall Sturegallerian in Stockholm, and through interviews with experienced project managers in the construction industry. There is currently a big span in the way Swedish construction companies plan the pre-project phase and the aim of this thesis is to present a more generic and standardized way that helps minimize project risks and maximize efficiency and profit.

 

The result is a generic model which can be used in pre-project planning. The model describes the phases in the preproject planning process and the activities that span these phases. Is also describes the categories of professions that need to participate in the preproject planning group and which activities that each profession executes.

 

The other result is a list of factors that need to be considered for a well performed pre-project phase, as found during the interviews. Among others the thesis stresses the importance of involving the client as a key participant in the process. The importance of testing the profitability of the idea is also being discussed. The interviews also indicated that the pre-project phase is not linear but rather transactional and that the original alternatives presented to the client lead to new client desires and requirements.

APA, Harvard, Vancouver, ISO, and other styles
20

Čuba, Vojtěch. "Finanční zajištění veřejného projektu v průběhu jeho realizace." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-239945.

Full text
Abstract:
The subject of this thesis is to depict the financial provision of a public project during its implementation that includes the draft of its financial provision and the appraisal of the financial feasibility of the investment project. The theoretical part is focused on clarifying the basic concepts that explain the issues of public projects, the public sector and public procurement. The end of the theoretical part describes the various ways to finance public projects. The second part of the thesis is practical. In this part I focused on the creation of the ways to finance the project “Realization of energy savings” that are possible, including the reconstruction of the roof of the building of the Police of the Czech Republic in Brno, at street Cejl No. 474 and No. 159 and the proposal of the optimal financing options.
APA, Harvard, Vancouver, ISO, and other styles
21

Karaguney, Fuat. "The Problem Of Eligibility Of Uncertified Gecekondu Possessors In Urban Transformation Implementations In Turkey The Case Of Ankara Dikmen Valley 4th And 5th Phases Urban Transformation And Development Project." Master's thesis, METU, 2009. http://etd.lib.metu.edu.tr/upload/12610444/index.pdf.

Full text
Abstract:
With the emergence of urban transformation concept in 1980s, the concept of eligibility has also started to be discussed as a new term in Turkey. However, the absence of a sustainable urban transformation law which defines the criteria of eligibility of stakeholders has undoubtedly brought about violations and disagreements between stakeholders. Especially the uncertified gecekondu possessors who are not determined as eligible stakeholders have been subjected to forced and arbitrary evictions. This study aims to clarify the problem of eligibility of uncertified gecekondu possessors in urban transformation and attempts to determine the criteria for the eligibility of this particular group. It argues that since the claims of uncertified gecekondu possessors like right to adequate housing, labor and possession have moral characters which do not depend upon legal acts, they can not be criteria of eligibility. The legal property ownership must be the criteria of eligibility in urban transformation practices in the law. On the other hand, this study urges that no matter living in a legal or illegal housing, the vulnerable families who lack of basic economic security and living in the project area must be determined as eligible stakeholders. In the first part of this master study, the problem of eligibility was discussed from theoretical perspective. In the second part, this problem was discussed in the case of Dikmen Valley 4th and 5th phases Urban Transformation Project. The knowledge obtained from the case can be useful for the local governments to develop sustainable policies on this particular problem.
APA, Harvard, Vancouver, ISO, and other styles
22

Imelli, Pietro. "Project initialisation phase in target research projects for development of medical devices /." Zürich : ETH, 2007. http://e-collection.ethbib.ethz.ch/show?type=diss&nr=17380.

Full text
APA, Harvard, Vancouver, ISO, and other styles
23

Osman, Martin. "Studie proveditelnosti projektu." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2018. http://www.nusl.cz/ntk/nusl-377431.

Full text
Abstract:
This masters thesis solves the problem of project management in pre-project phase with emphasis on Feasibility study for developement of RTLS platform in a chosen company. First part of this thesis consists of theoretical informations used for the proposing part. Second part consists of pre-project analysies, on which the project approach strategy is chosen. Third part is dedicated to the Feasibility study itself. It is done with the help of chosen international project management standards.
APA, Harvard, Vancouver, ISO, and other styles
24

Škarka, Jan. "Bytová výstavba jako developerský projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227628.

Full text
Abstract:
This thesis is concerned with developer project Rezidence Austerlitz in Slavkov u Brna realized by KALÁB company. It describes managing this project from buying the grounds to selling the real estate to clients. At the same time the thesis deals with the project's financing, time schedule and assesses market and construction risks. Part of the work is also analyzing the estate market which adverts to evolution of housing construction across the whole Czech Republic in the past ten years. Progress of real estate construction in Jihomoravský kraj is described in detail, including the progress of estate valuation.
APA, Harvard, Vancouver, ISO, and other styles
25

Balíčková, Alžběta. "Řízení výzkumných a vývojových projektů v PS modulu informačního systému SAP." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2015. http://www.nusl.cz/ntk/nusl-224806.

Full text
Abstract:
This master thesis focuses on the analysis and design of accounting, tax and legal methods of research and development projects. In the first part of this thesis are mention a theoretical background of research and development projects. Another part deals with the management of research and development projects. The following part is a financial and strategic analysis and analysis of the current status of research and development projects in the community. The design part is determined by the accounting, tax and legal methodology for managing research and development projects and is designed to control process research and development project under the previous methodology and using SAP. In conclusion, the benefits of this methodology defined for the selected company.
APA, Harvard, Vancouver, ISO, and other styles
26

Yllén, Johansson Mattias. "Agile project management in the construction industry : An inquiry of the oppurtunities in construction projects." Thesis, KTH, Fastigheter och byggande, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-101094.

Full text
Abstract:
Project management is today a current and highly discussed area. How projects within the construction industry are managed has not changed significantly during the last decades. The construction market, the number of different actors and the way that projects are procured today has however changed. This has led to a gap between the managerial view on how construction projects should be conducted today and how they actually are executed. This is reason enough to question this conservative industry and look into what possibilities there might be in the future. The Agile project management approach evolved from the software industry where it has grown and developed through empirical progress. It is suited for large complex projects where it is difficult to specify the product in advance. It is today used in different industries but mostly in the software business where the customer detects their needs through means of repeated tests and improvements to a prototype. This thesis has researched what opportunities there might be in implementing the Agile project management approach in the design phase of construction projects. The major advantages found with implementing the Agile approach is an increase in the client’s involvement. The Agile approach almost forces the client to increase their participation in the project compared to the situation today. It can also decrease uncertainty and improve risk management. By the use of time management and specific meetings it will also be beneficial for keeping track of the project’s progression and status.
APA, Harvard, Vancouver, ISO, and other styles
27

Karásek, Jiří. "Komercializace bytových domů." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227848.

Full text
Abstract:
This thesis deals with the issue of commercialization of residential buildings. The theoretical part introduces the idea of the business cycle and its relation to economic crises. The theoretical part of this thesis also deals with the area of development and related financing and marketing development projects, which is applied subsequently to the practical part for the particular developer's residential project. In addition to the application of this theoretical knowledge is the analysis of a questionnaire survey among residential developers, which is the basis for analyzing the possibility of effective commercialization of residential development projects in the post-crisis period at different stages of the business cycle.
APA, Harvard, Vancouver, ISO, and other styles
28

Vašíček, Petr. "Inovace v řešení developerského projektu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227070.

Full text
Abstract:
The thesis is focused on alternative solutions development project. The thesis defines a construction contract, the construction phase of financing. It also describes the types of developers, contractual relationships between the parties to development projects and methods of construction. In the practical part of this work is focused on solving a particular variant of a development project.
APA, Harvard, Vancouver, ISO, and other styles
29

Yllén, Johansson Mattias. "Agile project management in the construction industry : An inquiry of the opportunities in construction projects." Thesis, KTH, Fastigheter och byggande, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-96670.

Full text
Abstract:
Project management is today a current and highly discussed area. How projects within the construction industry are managed has not changed significantly during the last decades. The construction market, the amount of different actors and the way that projects are procured today has however changed. This has led to a gap between the managerial view on how construction projects should be conducted today and how they actually are executed. This is reason enough to question this conservative industry and look into what possibilities there might be in the future.   The Agile project management approach is evolved from the software industry where it has grown and developed through empirical progress. It is suited for large complex projects where it is difficult to specify the product in advance. It is today used in different industries but mostly in the software business where the customer detects their needs through means of repeated tests and improvements to a prototype.   This thesis has researched what opportunities there might be in implementing the Agile project management approach in the design phase of construction projects.   The major advantages found with implementing the Agile approach is an increase in the client’s involvement. The Agile approach almost forces the client to increase their participation in the project compared to the situation today. It can also decrease the uncertainty and improve risk management. By the use of time management and specific meetings it will also be beneficial for keeping track of the project’s progression and status.
Projektledning är idag ett högaktuellt ämne diskuteras intensivt. Hur projekt inom byggbranschen styrs och leds har inte förändrats nämnvärt under de senaste decennierna. Byggmarknaden, mängden av olika aktörer och hur att projekten upphandlas dag har dock förändrats. Detta har lett till ett spricka mellan ledarskapssynen på hur byggprojekt skall utföras idag och hur de faktiskt genomförs. Detta är skäl nog att ifrågasätta denna konservativa bransch och titta närmre på vilka möjligheter det kan finnas i framtiden.   Den Agila projektledningsmetoden har utvecklats inom mjukvarubranschen där den har vuxit och förbättrats genom empiriska framsteg. Den är lämpad för stora komplexa projekt där det är svårt att ange och definiera produkten i förväg. Den används idag i olika branscher, men främst i mjukvaruindustrin där kunden upptäcker sina behov med hjälp av upprepade tester och förbättringar av en prototyp.    Denna avhandling har undersökt vilka möjligheter det kan finnas i att använda Agila projektledningsmetoder under projekteringsfasen i byggprojekt.   De största fördelarna som finns med att använda den Agila metoden är en ökning av kundens engagemang och involvering i projekten. Den Agila metoden tvingar nästan kunden att öka deras deltagande i projektet jämfört med hur situationen ser ut idag. Det kan också leda till minskad osäkerhet och förbättrad riskhantering. Genom användning av ”time management” och särskilda möten kommer de Agila metoderna också att vara till nytta för att hålla reda på projektets framåtskridande och status.
APA, Harvard, Vancouver, ISO, and other styles
30

Guerra, Andrea Luigi. "Multi-users computer tools in early design phases : assessing their effect on design teams performances during co-located design-thinking activities." Thesis, Compiègne, 2016. http://www.theses.fr/2016COMP2296/document.

Full text
Abstract:
Les phases préliminaires du processus de conception sont celles qui influencent le plus le résultat. Elles sont caractérisées par l’incertitude : le processus ne peut être précisément défini à l’avance. L’approche Design Thinking est particulièrement adaptée pour gérer cette spécificité. L’introduction de supports numérique pendant ces phases de conception préliminaire a été identifiée comme une piste de recherche à fort potentiel. L’analyse de ces phases amont a permis de définir des postulats à partir desquels construire ces nouveaux supports numériques. Ces dispositifs sont constitués de deux surfaces tactiles, multi-utilisateurs ; une orientée horizontalement pour favoriser le foisonnement, l’autre orientée verticalement pour favoriser la focalisation. Par conséquence, ces plateformes ont été identifiées avec l’acronyme HOVER (HORizontale VERticale). La méthodologie de recherche comporte deux phases. Lors de la première phase, des expérimentations ont permis de comparer les dispositifs numériques avec les dispositifs actuels. Cette phase avait pour objectif de déterminer si les dispositifs numériques étaient acceptables dans la situation d’usage préconisée. Lors de la deuxième phase, les dispositifs numériques ont été testés dans des situations de travail réelles, afin de déterminer s’ils améliorent ces situations de travail. Ces expérimentations, ont été faites sur une spécifique plateforme HOVER, dénommés plateforme TATIN-PIC (Table Tactile Interactive –Plateforme Intelligente de Conception), construite à l’Université de Technologie de Compiègne. Les quatre expérimentations de la première phase ont révélées un niveau d’acceptabilité satisfaisant. En outre, cette phase permis d’identifier plusieurs pistes d’amélioration notamment au niveau des interactions homme-machines. La prise en compte des données collectées lors de cette phase a conduit à la conception d’une nouvelle version des dispositifs numériques. Cette nouvelle version, dénommée plateforme Digital Project Space (DPS), a été utilisée pour tester le dispositif dans des situations d’utilisation réelles. Les résultats de ces tests préliminaires montrent que les utilisateurs sont satisfaits des améliorations apportées par la plateforme DPS, et que ses performances, sont au pire, comparable aux meilleures prestations des supports papier actuellement disponibles. Des tests complémentaires sont néanmoins nécessaires pour avoir des résultats généralisables. Les perspectives sont de continuer la dissémination des dispositifs DPS dans la sphère productive afin d’obtenir des données quantitatives sur l’efficacité et l’efficience. L’objectif étant d’identifier des modèles prescriptifs de l’impact des dispositifs sur le processus de conception préliminaire
The early preliminary phases of the design process are the most impactful on the final outcomes. However, they are ill defined, the path to follow is not clear. Design-thinking approaches are a good solution to tackle the incertitude of these phases. The introduction of computer tools during these phases has been identified as an interesting research path to explore. Through the analysis of these early preliminary design phases, a list of high-level assumptions has been made. These high-level assumptions delimited the perimeter of action for the design of a new kind of computer supported design platforms. These platforms are composed of two multi-touch, multi-users surfaces; one is horizontal to favor divergent thinking, while the other is vertical to favor convergent thinking. By this fact, I identified them with then name “HOVER” (HORizontal - VERtical) platforms. The preconized research methodology has two steps. The first step consists in the experimental comparison of the new tool with existing ones. The aim of this evaluation is to determine if HOVER platforms are applicable to the situation for which they have been designed. The second step consists in ethnographic observations of real case studies to establish if HOVER platforms have successfully improved the existing situation. This study has been conducted on a specific HOVER platform, the TATIN-PIC platform (French acronym for Table Tactile Interactive – Plateforme Intelligente de Conception) built at the Université de Technologie de Compiègne. The first step, composed of four quasi-experimental observations, showed a satisfying level of applicability. Besides, it provided multiple indications for the improvement of the HOVER platforms regarding Human Machine interactions. For example, it has confirmed the need for an interconnected vertical and horizontal surface, the need for a natural manipulation of intermediary objects, the need for a smooth circulation among design methods and, as well, the need for new design methods to be implemented. Thanks to these indications, a second version of a HOVER platform has been made. This improved platform, called Digital Project Space (DPS) platform, has been used for success evaluation in a real context. From these preliminary tests emerged that users are satisfied by the support of the DPS platform. Performances are in the worst-case scenario, as good as actual tools. Further and more accurate real case studies are needed to generalize these findings. This outlines the future perspectives, such as the definition of prescriptive models of the impact of such device on the early preliminary design phases
Le fasi preliminari del processo di progettazione sono caratterizzate dall’incertezza, sia in termini di conoscenza che di azioni da compiere. Al contempo, pero, sono le fasi cruciali per il risultato globale del processo di progettazione. L’approccio Design Thinking è particolarmente adatto per le caratteristiche di queste fasi. L’introduzione di strumenti digitali durante il processo di progettazione preliminare è stata identificata come una pista di ricerca interessante da esplorare. L’analisi di queste fasi ha permesso di emettere una lista di postulati su cui progettare nuovi strumenti digitali. Questa classe di strumenti ha le sembianze di una piattaforma composta da due superfici tattili multi-utilizzatore; una è orizzontale per favorire il pensiero divergente, mentre l’altra è verticale per favorire il processo convergente. A causa di ciò, abbiamo deciso di identificare queste piattaforme con l’acronimo HOVER (HORizontal and VERtical). Il forte divario in termini di curva d’apprendimento tra i dispositivi esistenti (principalmente basati su carta) e le piattaforme HOVER, ha richiesto la definizione di una metodologia di ricerca adeguata. Questa metodologia ha inoltre il compito di garantire un rigore metodologico nell’approccio di ricerca. Due fasi di questa metodologia sono state eseguite. Nella prima fase, il nuovo dispositivo è comparato sperimentalmente con i dispositivi esistenti al fine di determinare se è applicabile alla situazione per cui è stato concepito. Nella seconda fase, il dispositivo è valutato in una situazione reale al fine di determinare se ha apportato, con successo, un miglioramento alla situazione esistente. Questi studi sono stati condotti su una specifica HOVER platform chiamata TATIN-PIC (acronimo francese per Table Tactile Interactive – Plateforme Intelligente de Conception), progettata e construita all’Université de Technologie de Compiègne. La prima fase, che ha visto quattro esperimenti, ha mostrato un livello di applicabilità soddisfacente, ha inoltre fornito molteplici piste di miglioramento in termini d’interazione uomo macchina. Grazie a questi feedback una seconda versione del dispositivo è stata creata. Tale versione, chiamata piattaforma Digital Project Space (DPS) è stata utilizzata per testare il successo del dispositivo in situazioni di reale utilizzo. Da questi test preliminari è emerso che gli utilizzatori sono rimasti soddisfatti dell’apporto fornito dal dispositivo, e che le performance sono nel caso peggiore equivalenti alla situazione attuale. Ulteriori e approfondite osservazioni di uso in situazioni reale sono necessarie per avere dei riscontri generalizzabili. Questo traccia gli scenari per il futuro; continuando la disseminazione nell’ambito industriale del dispositivo, sarà possibile ottenere dei riscontri quantitativi in termini diefficienza ed efficacia, grazie ai quali, estrapolare dei modelli prescrittivi dell’impatto del dispositivo sul processo di progettazione preliminare
APA, Harvard, Vancouver, ISO, and other styles
31

Sobtsenko, Olga, and Jelena Tararyko. "Control, Review and Monitoring of a Project Portfolio : The Study of Projects in the Implementation Phase." Thesis, Jönköping University, JIBS, Business Administration, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-7987.

Full text
Abstract:

Introduction: A trend for organisations to change from single to multiple project management has been observed over the last couple of decades. Organizations shifted their focus from single project management towards the simultaneous management of the whole set of projects as one entity – project portfolio. New multi-project settings require a new management approach and practices to successfully manage a portfolio. A common practice in organizations is to evaluate projects after they had been carried out. At that point not much can be done and it is impossible to improve performance and prevent failure. Hence, problems that occur in projects’ implementation phase remain unsolved and even unidentified. Constant control, review and monitoring of projects’ performance in the implementation phase could lead to the problematic portfolio areas being spotted and timely management decisions being made in order to improve the overall portfolio performance.

Problem: How do organisations manage projects within a portfolio that perform poorly in the implementation phase?

Purpose: The purpose of this thesis is: to describe to what extent and in what ways organizations control, review and monitor project performances in the implementation phase; to identify if organisations use any methods, tools or techniques in order to spot projects that perform poorly according to their expectations; and to discover what happens to the poorly performing projects in the implementation phase after they were identified.

Method: An electronic qualitative questionnaire had been constructed and sent out to the 46 sampled Swedish companies currently running project portfolios. 115 most suitable respondents had been chosen to answer the survey.

Frame of Reference: Theoretical framework is built on the literature within project portfolio management field, mostly concerning control, review and monitoring of projects of projects’ performance within their implementation phase; practices used to manage poorly performing projects as well as the value of organizational learning.

Conclusion: The research results show that even though majority of the studied organizations are aware and striving towards efficient project portfolio control, review and monitoring, a lot of space for improvement still remains. Results reveal that organizations are trying to keep track of projects’ performance within a portfolio, however, very few poorly performing are identified. Moreover, the management practices for underperforming projects are still very limited if not non-existent.

APA, Harvard, Vancouver, ISO, and other styles
32

Bibat, Mark Noel, and Paul Guillot. "How is Creativity Affected by Directiveness During the Project’s Implementation Phase?" Thesis, Linköpings universitet, Företagsekonomi, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-119136.

Full text
Abstract:
Nowadays, creativity is crucial to implement for the success of companies. Meanwhile, directivity seems to have a very negative reputation in the first sight. The objective of this paper is to identify and present a situation of creativity during the implementation phase of a project where directivity is used. This study consists of two phases. The first one is the ambition to create a primary model based on the present theories which are namely creativity, implementation phase and directivity. The second phase then aspires to draw the potential connections with the help of a qualitative study led on five different projects managers. This should help refine the primary model which will also make it easier to understand such complex notion.
APA, Harvard, Vancouver, ISO, and other styles
33

Habibbeigi, Pooria. "A Project Management Approach to M&A Deals and their Post-Integration Projects : A Case Study." Thesis, Umeå University, Umeå School of Business, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-31699.

Full text
Abstract:

Mergers and acquisitions (M&A) projects have long been considered as a strategy for organizational growth and gain of market share. Top management teams of companies take M&As into consideration since it is faster and less costly compare to internal growth and development programs. M&A project has variety of benefits such as growth in market share, increase in shareholder wealth, access to new markets, technological advantages and so on and so forth. Another benefit of such projects is the expected synergies which happen in financial, production, value chain and technological aspects of the existing company. However, according to many authors there is a high rate of failure in M&A industry. One of the main reasons of failure identified as the poor performance of post-M&A integration projects. Based on literature, a project perspective to these highly complex projects will reduce the risk of failure and will result in successful performance of new companies. However, there is a research gap in this filed.

 

After identifying the research gap and formulating the problem statement, research was designed in order to study the applicability of a project management (PM) approach toward M&A and their integration projects. Through performing a case study on a Swedish company who has undergone a number of M&A projects, interviews were conducted with top management team involved in such projects in order to collect empirical data. Based on qualitative data analysis methods, the primary data was integrated into pattern and themes and then analyzed.

 

Based on the findings of the research, it was identified that in acquisition projects of small and medium size companies the strategic fit is more significant than organizational fit since the new company will dissolve completely and the rest of the integration is in control of the company. Furthermore, after identifying M&A projects as temporary organizations, three aspects: project organization, human resource and governance were verified based on literature. In the context of this study, human resource and governance is considered key elements in terms of acquisition projects. Finally, a framework was proposed in order to implement project management approach by fulfilling three dimension of PM which are project organization, project life-cycle and project governance.

APA, Harvard, Vancouver, ISO, and other styles
34

Rozvadská, Marcela. "Stavebně technologický projekt polyfunkčního domu Art Passage v Trenčíně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227056.

Full text
Abstract:
This thesis deals with the structural and technological project of multifunctional building Art Passage in Trencin. Solve division building construction and civil engineering objects, draw up the draft machine assembly time and financial plan. They will further focus on the rough construction of the main building structure, where processing technology studies during construction schedule, the project site equipment, budget and other documents that are necessary for the proper implementation of construction.
APA, Harvard, Vancouver, ISO, and other styles
35

Kadir, Mohammad Razali bin Abdul. "Conceptual phase best practices." Thesis, Loughborough University, 1996. https://dspace.lboro.ac.uk/2134/7241.

Full text
Abstract:
Construction projects comprise holistic and organic processes of the conceptual, detailed engineering, construction and start-up phases. The conceptual phase is the most critical phase in a project's life-cycle where the main strategic decisions are made. The success of other phases depends upon the decisions made during the conceptual phase. Although the conceptual phase presents the greatest opportunity for productivity improvement during the construction phase, it has been given relatively little attention. The main aim of this research was to establish the conceptual phase tasks and associated best practices for major projects that ensure good site productivity through decisions made in the conceptual phase. The aim was realised through the following five objectives: define tasks performed in the conceptual phase; rank the impact of conceptual phase tasks on site productivity; determine the impact of conceptual phase tasks on productivity in terms the main site resources of time, labour, plant, material and finance; establish the sequence with which tasks are performed in the conceptual phase; and establish Best Practices associated with each of the conceptual phase tasks. The research findings were based upon literature, an industry-wide postal questionnaire survey and case studies. The survey comprised a substantial twenty-page questionnaire containing 184 questions. The questionnaire was posted to 144 companies including clients, consultants, contractors and financial institutions throughout the European Union. A return of 37 per cent was achieved. The industry-wide survey was then followed by detailed case studies of six projects: a power plant; a chemical plant; a sewerage treatment plant; an offshore-structure; a motor way; and, a substantial building project. These case studies underpinned the survey and specific differences and similarities were highlighted among the six projects and the processes adopted during the conceptual stages. The industry-wide survey and complementary case studies formed the basis of recommendations for conceptual phase tasks and associated best practices achieving enhanced site productivity. It was concluded that the conceptual phase of construction projects comprised ten tasks: Consents and Permits; Project Definition; Financial Strategy; Project Planning; Contract Strategy; Project Management Organisation; Construction Philosophy; Procurement Strategy; Design of Temporary Works; and, Design of Permanent Structures. Eighty-one best practices relating to the conceptual phase were accepted by the respondents. These best practices, when adopted in the conceptual phase, should held to enhance site productivity.
APA, Harvard, Vancouver, ISO, and other styles
36

Millán, Leyva Jaime Adrián, and Vladimir Matović. "Project Management Practices at the Front-End of Management Consulting Projects : An exploratory study of the perspectives of Swedish management consultants." Thesis, Umeå universitet, Handelshögskolan vid Umeå universitet (USBE), 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-51566.

Full text
Abstract:
The present investigation looks at management consulting engagements through the project management lens, and explores what practitioners do in the initial stages of their projects. In the understanding that the front-end of the project is a very critical and important stage, this text begins by examining the literature on management consulting and on the definitional phase of projects, and demonstrates that the situations encountered in both domains are quite similar. For this reason, this study explores the project management practices that Swedish management consultants employ in the initial phases of the consulting projects. Particularly, it focuses on the practices that reconcile possible gaps in perspectives and expectations that often exist between client and consultant when this relationship is being formed.  The study had an inductive character and is cross-sectional in terms of time-horizon, focusing on the previous experiences of management consultants. In collecting the data, a survey strategy was usedwith semi-structured interviews involving nine Swedish management consultants from eight different consultancies. The process of analysis implied the use of template analysis, which provided researchers with enough flexibility to code, categorize, and interpret necessary findings. The results show that consultants favor practices that revolve around communication and interaction with the client, including interviews, workshops, and meetings, among others. In addition, they stress the importance of the use of documentation in order to reach an agreement on what the project is about. Moreover, these practices were often clearly connected to the issues that they, as project managers, must resolve at the front-end of projects. Interestingly, the results indicate that these challenges, identified by the management consultants, mostly match the ones identified in the project management literature. There is indeed a connection between project management practices and management consulting, from which both fields can benefit.
APA, Harvard, Vancouver, ISO, and other styles
37

Chupin, Jean-Pierre. "Le projet analogue, les phases analogiques du projet d'architecture en situation pédagogique." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 1998. http://www.collectionscanada.ca/obj/s4/f2/dsk2/ftp02/NQ35580.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
38

Dvořák, Filip. "Řízení projektu výstavby stavebního celku z pohledu dodavatele." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225708.

Full text
Abstract:
The thesis is dedicated to and at the same time explains the basic concepts concerning the management of the construction project from contractor's point of view. The aim of this work is guided by the principles, methods and procedures of the management during the construction project and their application to practical project of construction ,,Sportovní hala“ in Nové Veselí.
APA, Harvard, Vancouver, ISO, and other styles
39

Schoonwinkel, Sune. "A risk and cost management model for changes during the construction phase of a civil engineering project." Thesis, Stellenbosch : Stellenbosch University, 2012. http://hdl.handle.net/10019.1/20312.

Full text
Abstract:
Thesis (MScEng)--Stellenbosch University, 2012
ENGLISH ABSTRACT: The construction project environment is dynamic and prone to change. Project change can be defined as any event that alters a project’s original scope, execution time or the cost of the works. Improper management of the projects’ changes could therefore adversely impact on the actual cost and duration of the project which may lead to project cost overruns and even claims and legal disputes. During the construction phase of a project, change affects every aspect of productivity – the planned schedules and deadlines, work methodology, resource procurement, as well as the budget and thus it could prevent the achievement of the project objectives. A project manager, therefore, wants to limit the number of change to a project. However, during a construction project there may be quite a number of changes. Managing a construction project is difficult, in that all the relevant information is rarely available at the initial stage of a project to enable one to plan and design the project accurately and make the best possible decisions. As information becomes available during the construction phase of the project, it can lead to various changes. Design errors or variations, unforeseen site conditions and vagueness in the original scope are but some of the reasons for change. No matter the size of the change, each alteration to the works has a cost, time and risk implication. Due to tight time constraints on most projects, every change requires quick, robust decision making, so as not to delay the project, which therefore results in changes not being comprehensively evaluated. Decisions are often made on intuition or experience, without an assessment of the risks involved or the influence on the cost of the project and without applying well-known project management techniques. The aim of this research was to determine what a change management process for a civil engineering project should look like, specifically the cost and risk management of changes. It investigated the current state of change management of construction projects in practice, by doing a case study and various interviews with project managers. Based on the findings of the research and the industry requirements, a model was developed for managing the costs and risks of changes. The Model was validated by means of an expert evaluation review. The change management model developed as part of this thesis can be used to analyse the cost, time and quality impact of the change, and to do a detailed risk assessment. The Model also reviews the proposed change in order to determine whether the change is necessary. It is a generic tool that can be used by engineers and their project team to enhance the management of changes that happens during the construction phase of a project for any civil construction project.
AFRIKAANSE OPSOMMING: Die konstruksie omgewing is dinamies en geneig tot verandering. Projek verandering kan gedefinieer word as enige gebeurtenis wat die projek se aanvanklike omvang verander of lei to verlenging van die tydsduur of vermeerdering van die koste van die projek. Wanbestuur van projek veranderinge kan ‘n nadelige impak op die projek kostes en tydsduur hê wat kan lei tot oorskryding van die begroting en selfs eise en regsdispute. Verandering kan elke aspek van produktiwiteit tydens die konstruksie fase van ‘n projek affekteer. Dit affekteer die beplande skedules, spertye, werk metodologie, hulpbron bestuur, asook die begroting. Dus kan dit verhoed dat die projek doelwitte bereik word. ‘n Projek bestuurder wil daarom die hoeveelheid en omvang van veranderinge beperk. ‘n Konstruksie projek kan egter heelwat veranderinge ondergaan. Om ‘n konstruksie projek te bestuur is moeilik aangesien al die relevante informasie selde beskikbaar is tydens die begin fases van ‘n projek wat nodig is om die beplanning en ontwerp van die projek so akuraat moontlik te doen en die regte besluite te neem. Soos informasie beskikbaar raak tydens die konstruksie fase van die projek, lei dit dikwels to verskeie veranderinge. Ontwerp foute of variasies, onvoorsiene terrein toestande en onduidelikheid oor die projek omvang is van die redes vir veranderinge. Ongeag die grootte van die verandering het elke wysiging tot die projek ‘n koste, tyd en riskiko implikasie. As gevolge van tydsbeperkinge vereis elke verandering vinnige en kragtige besluitneming om sodoende nie die projek te vertraag nie. Dit lei daartoe dat veranderinge nie omvattend geëvalueer word nie. Besluite word dikwels geneem op intuïsie of ervaring, sonder 'n beoordeling van die risiko's wat betrokke is of die bepaling van die invloed op die koste van die projek, en sonder die toepassing van erkende projek bestuur tegnieke. Die doel van hierdie navorsing was om vas te stel hoe 'n verandering bestuur proses moet lyk vir ‘n siviele ingenieurswese projek, spesifiek die koste en risiko bestuur van die verandering. Die huidige stand van verandering bestuur van konstruksie projekte in die praktyk is ondersoek deur middel van 'n gevallestudie en verskeie onderhoude met die projek bestuurders. 'n Model is ontwikkel vir die bestuur van die koste en risiko's van veranderinge gebaseer op die bevindinge van die navorsing en ook die vereistes van die bedryf. Die model is getoets met behulp van evaluering deur professionele ingenieurs. Die verandering bestuur model wat ontwikkel is as deel van hierdie proefskrif kan gebruik word om die koste, tyd en kwaliteit impak van ‘n verandering te analiseer, asook om 'n omvattende risiko assessering te doen. Die model hersien ook die voorgestelde verandering om te bepaal of die verandering nodig is. Dit is 'n generiese hulpmiddel wat deur ingenieurs en hul projek span gebruik kan word vir die bestuur van die veranderinge wat tydens die konstruksie fase van siviele projekte plaasvind.
APA, Harvard, Vancouver, ISO, and other styles
40

Voros, Craig Matthew. "Myaamia Calendar Project Phase II: Lunar Calendar Calibration." Miami University / OhioLINK, 2009. http://rave.ohiolink.edu/etdc/view?acc_num=miami1240406619.

Full text
APA, Harvard, Vancouver, ISO, and other styles
41

Colarusso, Pina. "Selected projects in gas-phase spectroscopy." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 1997. http://www.collectionscanada.ca/obj/s4/f2/dsk3/ftp04/nq22196.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
42

Nováková, Jolana. "Plánování stavební zakázky zhotovitelem." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227033.

Full text
Abstract:
This diploma thesis deals with the planning of construction contracts from the perspective of a contractor. In the theoretical section, the basic concepts of project management are explained. Further, the methods and principles used in the management of the construction project of building a complex are described. The practical part contains a particular case where the methods are used to schedule a time during the course of construction and planning of the resources needed for implementation.
APA, Harvard, Vancouver, ISO, and other styles
43

Toman, Marek. "Novostavba administrativního objektu v Karviné, stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371978.

Full text
Abstract:
The diploma thesis deals with preparation, organization and construction technology of an administrative building in Karviná. It is about new building with four above ground floor. From a design point of view, the structure is designed as a precast concrete frame. The diploma thesis contains technical report, coordinating situation with design of transport ways, time financial plan, study of the implementation of the main technological phases, concept of construction site equipment, design of machinery set, time plan with worker bilancion, material delivery plan for rough building, technical report for masonry work, inspection and test plan for masonry work, item budget with the statement of measurements and noice study for earthworks.
APA, Harvard, Vancouver, ISO, and other styles
44

Fuller, Paul A. "Improving lessons learnt outcomes in multi-phase project environments." Thesis, Loughborough University, 2011. https://dspace.lboro.ac.uk/2134/8161.

Full text
Abstract:
The capture and beneficial application of learning from past experiences in projects has been an area of interest and debate for many years. The implementation of lessons learnt is commonly acknowledged as difficult. Existing studies point to the deficiencies in current practice but few propose practical approaches to improve the situation. A key barrier to learning in projects is the time-critical nature of most projects which makes the creation of time and space to learn and then apply the resultant learning problematic. Other inhibitors include the variety and temporality of project teams, the geographical spread of many projects and client pressures to reduce costs. The aim of this research was to improve project learning processes in multi-phase project environments through the identification and application of relevant organizational learning and knowledge management theories. The research was based on a single company longitudinal case study in an infrastructure support services organization. An event-based approach to project lessons was developed which focuses on benefits realisation and measurement. The processes employed overcome some of the key barriers to the effective capture of lessons learnt and their subsequent implementation i.e. shortage of time, different learning styles of individuals, lack of effective capture mechanisms, poor articulation of benefits realisation, lack of management sponsorship. A model was also developed which acts as a multi-faceted lens which aids the understanding of the dynamics of project-based learning. The model was tested through a series of workshops. In order to assist the roll-out of the new approach across the case study organisation and outline implementation guide that has been developed. The approach can also be promoted externally to improve project management practice across the wider construction industry. In addition, the study also revealed that event-based enactment of complex/abstract theories can be used as a tool to create improved praxis by overcoming the need to explain the theories to the actors involved. The main contribution to research is the development of a new approach which extends existing theory in the areas of learning, knowledge management and boundary objects in multi-phase project contexts. It achieves this through the synergistic use of the theories employed which support the development of reflective practitioners with the skills to engender a 'learning how to learn' culture within project-based environments. Further testing of ongoing benefits monitoring and establishing causality is needed. Overall, the methodology developed is highly adaptable and can be used by others in different organizational contexts to improve organizational learning, business performance, client satisfaction and wider stakeholder outcomes.
APA, Harvard, Vancouver, ISO, and other styles
45

Nováková, Johana. "Návrh změny podnikového procesu." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-316858.

Full text
Abstract:
This thesis deals with problems of process management in a field of savings identification with the goal of an analysis of a chosen process and creation of a proposal for current status improvement from a point of effectivity. It describes process management, process modeling and improvement and project management. Further it presents a current status of the process, project logic frame, net analyzis and risk identification. Finally it shows a map of future proces with an identification of weak points and suggestions for improvement for an organization to improve state of the field of savings identification.
APA, Harvard, Vancouver, ISO, and other styles
46

Ciaravino, Brian Douglas. "Best practice influence on project changes during the construction phase." Thesis, Monterey, California. Naval Postgraduate School, 1998. http://hdl.handle.net/10945/8029.

Full text
Abstract:
CIVINS
This thesis analyzes the influence of team building, constructability, and project change management best practices on the reduction of project changes during the construction phase. Construction Industry Institute Owner, Naval Facilities Command, and Construction Industry Institute Contractor data are separately evaluated to determine if a statistically significance relationship between best practice use and a reduction in the project change rate during construction exists. Conclusions and recommendations for the reduction of the project change rate during construction are offered
APA, Harvard, Vancouver, ISO, and other styles
47

Ablett-Spence, Ingrid Maria. "The initial phase of cancer care : an action research project." Thesis, Durham University, 2004. http://etheses.dur.ac.uk/3178/.

Full text
Abstract:
Title The initial phase of cancer care- an action research projectRationale for the study Anecdotal evidence suggested that patients receiving treatment within a Cancer Unit were not receiving equitable care. Some patients reported being told their diagnosis in an empathetic manner, whilstothers reported consultants being brutal and/or uninterested. In addition, it appeared that patients were given variable levels of support and information during their initial phase of cancer care. Aims of the study The purpose of the study was to explore whether the information and support offered to cancer patients in the initial phase of care was sufficient and appropriate to their needs. It was further hoped that the findings of the study could be utilised to change services in a patient centred way. Methodology A qualitative study divided into three stages. Firstly, eighteen non-participant observations of doctor/patient consultations were carried out at the time when patients were told they had a diagnosis of cancer and given information relating to their proposed treatment. The purpose of this was to ascertain what actually happened in practice. The data resulting from this stage of the study enabled an understanding of the problem in context and facilitated the development of an interview schedule, which formed the basis of the second stage of fieldwork. Stage two consisted of thirty-three semi structured, tape recorded patient interviews. These were carried out 3- 4 months following diagnosis. The third stage of the study consisted of interviews and focus groups with consultants, clinical nurse specialists and senior managers, the purpose of which was to explore their views regarding the results of the patient interviews and perceptions of theimplementation of change in clinical practice. The approach taken to structure the data collection was based on grounded theory (Glaser and Strauss, 1967). Findings Many of the issues raised in the patient interviews were consistentwith the literature i.e. patients experience a wide variety of emotions when told they have cancer. The vast majority of patients hear little after the word "cancer", it is therefore important to repeat information and ensure patients have access to ongoing support. Patients also value being told the truth, continuity of information and doctors showing that they care. They appear more satisfied with their care where an effective multidisciplinary team exists. However, patients inthe Cancer Unit where the study was conducted did not receive equitable care, particularly in relation to the amount and type of information and support offered to them in the initial phase of cancer care. The third stage of the study explored consultants', clinical nurse specialists' and senior managers' views relating to the findings from stages one and two of the study. The health care professionals did not exhibit surprise at any of the findings but were keen to explore them further. Views relating to the implementation of change within cancer care were also explored in this stage of the study and their comments were largely consistent with the literature on change management. Innovations in practice A number of changes have been made to clinical practice, including, improved multidisciplinary team working, developing multidisciplinary documentation and developing site specific cancer pathways which identify the patients journey from the point of referral through to follow up or palliation. These pathways help patients know what to expect at each stage of their disease journey and ensure patients receive equitable care, because the pathways act as guidelines for professionals outlining good practice at each stage of the journey. All of the developments initiated to date are aimed at improving the patient experience and staff satisfaction relating to the service they provide.
APA, Harvard, Vancouver, ISO, and other styles
48

LOPE, ALVAREZ DIEGO. "INTEGRATED CONCURRENT ENGINEERING AND APPLICABILITY TO CONSTRUCTION PROJECTS DURING DESIGN PHASE." Thesis, Blekinge Tekniska Högskola, Institutionen för industriell ekonomi, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:bth-19436.

Full text
Abstract:
The construction sector has been struggling with low productivity issues during the last decades, mainly due to relatively low Research & Development investments compared to other industries, old-fashioned practices, and a fragmented market structure with Clients, Designers and Contractors.    The construction sector urges a digitalization revolution in order to overcome the aforementioned old-fashioned practices, but this digital revolution should go along with adequate methodologies that allow the digitalization to achieve its full potential. The work presented in this thesis aims to improve the efficiency of the construction sector by having a look on more collaborative approaches between Clients, Designers and Contractors in Construction Projects. The collaborative approach researched in this thesis is the Integrated Concurrent Engineering methodology, which covers aspects of Project Management, Organization, Communication and Leadership, exploiting the digitalization capabilities that nowadays’ Technology offers. This thesis develops a theoretical framework for Integrated Concurrent Engineering in Construction Projects, with the aim to enhance their efficiency. The theoretical framework is based in literature research as well as experiences from project managers in the construction sector. The result of this study includes guidelines and recommendations on how to effectively implement the principles of Integrated Concurrent Engineering. The guidelines are applicable for Clients, Designers and Contractors, and can be seen as a tool for the Project Management Team to improve construction project’s efficiency, especially in the design phase.
APA, Harvard, Vancouver, ISO, and other styles
49

Dejmalová, Hana. "Bytový komplex LIVE UP v Brně - příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265703.

Full text
Abstract:
The subject of the master´s thesis are selected parts construction technology project apartment house LIVE UP in Brno – Bohunice. It is a new building with one underground floor and six overground floors. Construction of the house is monolithic and upper floors are bearing masonry walls. The work includes technical reports, study the implementation of major construction phases, organization of the construction, technological regulation of flat single-roof, itemized budget with the statement of measurements, time schedule, inventory of machines.
APA, Harvard, Vancouver, ISO, and other styles
50

Johansson, Elias, and Kenan Kamenjas. "Management of industrialization projects." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-31796.

Full text
Abstract:
Short time-to-market is a key success factor in the todays’ dynamic business environment and many companies are trying to improve their product development processes. A challenge is to develop products according to the time plan and at the same time keeping the cost low and the quality high. This study focuses on the project management within the product development process in an automotive industry. The background of this study started as a request from the research and development department at the automotive company, which led to the following questions; 1) what are the most crucial factors for project success? 2) How can these factors contribute to a more successful outcome? 3) How can project management decrease product development lead time by sharing knowledge? The research approach is a case study and the data collection consist of interviews and questioners at two companies connected to project management in product development projects. Spider charts are created from the collected data containing eleven dimensions to show similarities and differences between the project managers working within the research and development department as well as between the two companies. The main conclusions are that there is a need to allow a certain level of flexibility when managing projects, in order to more easily handle late changes. Being involved in a project from the concept phase could facilitate the product development activities later on, due to a deeper understanding regarding previous decisions. Further, knowledge sharing methods, such as databases, has to be designed to be suitable for a specific organization and user friendly which enables the users to more easily search for specific types of knowledge. Lastly, a low level on the detailed focus is shown to be another success factor, however, in some cases there is still a need of this detailed focus to solve specific problems but the details may never become a higher focus than the holistic view.

Studien är gjord hos Volvo Car Corporation och Vattenfall Research and Development AB har använts som benchmarkingföretag.

APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography