Academic literature on the topic 'Production scheduling'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Production scheduling.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Production scheduling"

1

Fithri, Prima, and Fitri Ramawinta. "Penjadwalan Mesin dengan Menggunakan Algoritma Pembangkitan Jadwal Aktif dan Algoritma Penjadwalan Non-Delay untuk Produk Hydrotiller dan Hammermil pada CV. Cherry Sarana Agro." Jurnal Optimasi Sistem Industri 12, no. 2 (April 25, 2016): 377. http://dx.doi.org/10.25077/josi.v12.n2.p377-399.2013.

Full text
Abstract:
Fulfillment of all demands of consumers who come to the product is one thing that always wanted to be achieved by a company. These requests are not independent of the company's ability to manufacture certain products. CV Cherry Sarana Agro manufactures a wide range of agricultural equipment, one of which is the product hydrotiller and hammermil. Demand for both products are always in large numbers for each period, however, the company could not meet the entire demand. One of the main factors that led this small company's production capacity for these two products is not optimal scheduling of machines made by companies, causing many to be a queue on a particular machine so that the total process operating time becomes very large. Scheduling method is used to optimize the scheduling of machines working on the report of this practice is actively scheduling method and the method of non-delay scheduling. The data needed to perform scheduling with both of these methods is the data used machines, data processing operations and data processing time of operation. With these three data, can be compared to the actual scheduling done by the company with the scheduling is done using active scheduling method and the method of non-delay scheduling. The most optimal scheduling is obtained after comparing the three methods used are scheduling using the non-delay scheduling. This method was chosen because the resulting make span is much smaller than the two other methods. This method is well applied in the company because in addition to reducing the total processing time, can also increase production capacity, so that all requests can be met.Keywords: Active schedulling method, non-delay schedulling method, makespan, hydrotiller, hammermil
APA, Harvard, Vancouver, ISO, and other styles
2

Li, Yingying. "Research on game scheduling of galvanizing pipe production." Functional materials 24, no. 3 (September 29, 2017): 005–495. http://dx.doi.org/10.15407/fm24.03.490.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Kromodihardjo, Sudiyono, and Ergo Swasono Kromodihardjo. "Modeling of Well Service and Workover to Optimize Scheduling of Oil Well Maintenance." Applied Mechanics and Materials 836 (June 2016): 311–16. http://dx.doi.org/10.4028/www.scientific.net/amm.836.311.

Full text
Abstract:
Well maintenance (well service and workover) is an operation needed by oil company to guarantee the optimum productionof its oil well.Well maintenance is performed using large equipment called hydraulic workover unit (HWU-Rig) which is available in limited number. Scheduling sequence of the HWU-Rig to do well service must meet the goal of the maintenance that is to minimize the loss of oil well production due to well breakdown. Thus minimizing breakdown time of well with high rate production is a priority. However, scheduling secuence of the HWU-Rig to perform its task for few days ahead become complicated due to the numerous alternatives of secuence to choose. Each alternatives of sequence yields a certain production loss. Arbitrarily scheduling sequence may not yield the goal og minimizing the loss of well production. This research was done by analyzing workover scheduling system and data from Kondur Petroleum such as well location, well production rate, and service time needed to be performed on wells. Algorithm to create schedulling sequence was developed in the research. The algorithm was then implemented in discrete simulation software, and yield the result of absolute global optimal solution, near optimal solution and local optimal solution of the HWU scheduling problem.
APA, Harvard, Vancouver, ISO, and other styles
4

Mauergauz, Yuri. "Scheduling for production teams." International Journal of Industrial Engineering Computations 6, no. 3 (2015): 339–50. http://dx.doi.org/10.5267/j.ijiec.2015.3.001.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Zaremba, Marek B. "Scheduling of production processes." Control Engineering Practice 4, no. 1 (January 1996): 141–42. http://dx.doi.org/10.1016/s0967-0661(96)90035-0.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Kolisch, Rainer, Marcus Brandenburg, and Claus Krüger. "Numetrix/3 Production Scheduling." OR Spektrum 22, no. 3 (August 2000): 307–12. http://dx.doi.org/10.1007/pl00013336.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Schmidt, Günter. "Modelling production scheduling systems." International Journal of Production Economics 46-47 (December 1996): 109–18. http://dx.doi.org/10.1016/0925-5273(95)00019-4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Nussbaum, Miguel, and Eduardo A. Parra. "A Production Scheduling System." ORSA Journal on Computing 5, no. 2 (May 1993): 168–81. http://dx.doi.org/10.1287/ijoc.5.2.168.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Taunton, J. C., and C. M. Ready. "Intelligent dynamic production scheduling." Food Research International 27, no. 2 (January 1994): 111–16. http://dx.doi.org/10.1016/0963-9969(94)90151-1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Foote, B. L., A. Ravindran, and S. Lashine. "Production planning & scheduling." Computers & Industrial Engineering 15, no. 1-4 (January 1988): 129–38. http://dx.doi.org/10.1016/0360-8352(88)90075-7.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Dissertations / Theses on the topic "Production scheduling"

1

Stephenson, Paul A. "New dominance orders for scheduling problems /." *McMaster only, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Huang, Chueng-Chiu S. "Stochastic scheduling." Diss., Georgia Institute of Technology, 1991. http://hdl.handle.net/1853/24834.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Moghaddam, Atefeh. "Production scheduling : unavailabitlity of resources." Troyes, 2012. http://www.theses.fr/2012TROY0025.

Full text
Abstract:
Dans le marché d’aujourd’hui, l’un des facteurs de survie les plus importants pour une entreprise est la garantie de la satisfaction des clients. Parfois, une entreprise ne peut pas satisfaire les exigences de ses clients à cause de contraintes telles que la capacité limitée ou les dates de fin strictes. Elle est donc obligée d’ignorer certaines commandes et de les rejeter ou encore de sous-traiter ces commandes. Dans les deux cas, la société est soumise à des frais. Dans cette thèse, nous étudions les différents types de ligne de production dans lesquels le rejet des commandes est possible. D’abord, nous avons étudié le problème d’ordonnancement bi-objectif sur une seule machine. Nous avons proposé une méthode exacte et plusieurs méta-heuristiques et heuristique efficaces pour trouver une bonne estimation de solutions non-dominées. Ainsi, nous avons étudié les différents concepts de dominance afin de limiter notre recherche dans la région la plus prometteuse du front de Pareto. Par la suite, nous avons étudié un problème d’ordonnancement réentrant à deux machines. Dans ce cas, le rejet des tâches a lieu en fonction de leurs dates de fin strictes. Nous avons considéré deux décisions simultanées : l’acceptation des tâches et leur ordonnancement. Un modèle de programmation linéaire mixte en nombres entiers et différents algorithmes génétiques multi-objectifs, ainsi que l’intégration des concepts de dominance divers, ont été proposés. Enfin, un problème plus général d’ordonnancement flow-shop de permutation réentrant avec dates de fin strictes et le rejet autorisé a été abordé
In today’s competitive market, one of the most important survival factors for a company is the achievement of customers’ satisfaction. Sometimes, a company can not fulfill its customers’ requirements due to the constraints such as limited capacity or tight due dates so it is obliged to ignore some orders and reject them or find another supplier to out-source those orders. In both cases, the company is charged a fee. In this thesis we investigate different types of production line in which rejection of the jobs is possible. At the beginning, we studied a variant of the problem as bi-objective single-machine scheduling problem with rejection. We proposed an exact method and some efficient metaheuristics and a heuristic to find a good estimation of non-dominated solution set. We found that in industrial case, most of the time the decision maker preferred the non-dominated solutions placed in the middle part of Pareto front. So we investigated different dominance concepts apart from Pareto in order to limit our research into the most promising region of Pareto front. Then we studied a two-machine re-entrant scheduling problem with rejection. In this case, the rejection of jobs occurred due to their strict due dates. So we examined simultaneous job acceptance and scheduling decisions. A mixed integer linear programming model and different multi-objective genetic-based algorithms were proposed by integrating various dominance concepts. Finally, a more general problem of re-entrant permutation flow-shop scheduling problem with strict due dates and rejection was tackled
APA, Harvard, Vancouver, ISO, and other styles
4

Wong, Yat-sing. "Production scheduling for virtual cellular manufacturing systems /." Hong Kong : University of Hong Kong, 1999. http://sunzi.lib.hku.hk/hkuto/record.jsp?B20720841.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Yang, Bibo. "Models and algorithms for operations scheduling problems with resource flexibility and schedule disruptions." [Gainesville, Fla.] : University of Florida, 2004. http://purl.fcla.edu/fcla/etd/UFE0006344.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Cross, Fionnuala Mary. "A model for loading and sequencing a flexible manufacturing cell." Thesis, Georgia Institute of Technology, 1986. http://hdl.handle.net/1853/25656.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Wang, Jiaxin. "Modelling and solving for production scheduling." Doctoral thesis, Universite Libre de Bruxelles, 1996. http://hdl.handle.net/2013/ULB-DIPOT:oai:dipot.ulb.ac.be:2013/212411.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Lin, Neng-pai. "Master production scheduling in uncertain environments /." Connect to resource, 1989. http://rave.ohiolink.edu/etdc/view.cgi?acc%5Fnum=osu1262714277.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

JARDIM, LEANDRO SCHOEMER. "UNDERSTANDING COMPETENCE IN PRODUCTION SCHEDULING ROUTINES." PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO, 2017. http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=34032@1.

Full text
Abstract:
PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO
COORDENAÇÃO DE APERFEIÇOAMENTO DO PESSOAL DE ENSINO SUPERIOR
PROGRAMA DE SUPORTE À PÓS-GRADUAÇÃO DE INSTS. DE ENSINO
Nas organizações industriais contemporâneas, a competição global e o avanço das tecnologias de informação tornam os produtos e processos cada vez mais semelhantes. O desempenho operacional passa, então, a ser um dos principais mecanismos de diferenciação. Nesse cenário, a área de planejamento e programação da produção ganha um inédito papel estratégico. O presente estudo se propôs a investigar esse novo papel com um olhar centrado nas rotinas organizacionais e nas pessoas que exercem a função. Mais especificamente, a partir de uma abordagem qualitativa e interpretativa, o trabalho utilizou o método fenomenográfico para compreender como os programadores concebem a competência nas suas rotinas organizacionais. A análise das entrevistas identificou três diferentes concepções. A primeira está associada à tarefa de alocação eficiente de recursos e materiais. A segunda vê a programação como um processo de mediação entre as diferentes áreas da empresa. E a terceira atribui ao programador de produção a reponsabilidade de fazer a gestão estratégica da operação. Além disso, foram identificadas seis dimensões do fenômeno que explicam e diferenciam as concepções, são elas: Raciocínio lógico, Conhecimento técnico (do processo produtivo), Conhecimento sistêmico (de outras áreas), Estratégia de negociação, Aspecto manifesto da rotina e Envolvimento com a estratégia corporativa. Os achados sugerem, por fim, que a dimensão estratégica da programação é verificável, em diferentes graus, nas suas rotinas. Além disso, ao revelar a concepção competência como sendo a mediação entre as diferentes áreas da empresa, o estudo traz as estratégias de negociação para o centro do debate sobre a realização competente das rotinas de programação da produção.
In contemporary industrial organizations, global competition and the advancement of information technologies make products and processes increasingly similar. Operational performance then becomes one of the main differentiation mechanisms. In this scenario, the area of production planning and scheduling gains an unprecedented strategic role. The present study aimed to investigate this new role with a focus on the organizational routines and the people who perform them. More specifically, from a qualitative and interpretative approach, this study used phenomenography method to understand how schedulers conceive competence in their organizational routines. The analysis of the interviews identified three different conceptions. The first is associated with the task of efficient allocation of resources and materials. The second sees scheduling as a process of mediation between the different areas of the company. And the third assigns to the production planner the responsibility to do the strategic management of the enterprise operations. In addition, six dimensions of the phenomenon that explain and differentiate the conceptions are identified: Logical reasoning, Technical knowledge (of the productive process), Systemic knowledge (of other areas), Negotiation strategy, Manifested aspect of the routine and Involvement with corporate strategy. The findings suggest that the strategic dimension of scheduling is verifiable, to different degrees, in production planning routines. In addition, by revealing the concept of competence as being the mediation between the different areas of the company, the study brings negotiation strategies to the center of the debate on the competent realization of production planning routines.
APA, Harvard, Vancouver, ISO, and other styles
10

Lin, Neng-Pai. "Master production scheduling in uncertain environments." The Ohio State University, 1989. http://rave.ohiolink.edu/etdc/view?acc_num=osu1262714277.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Books on the topic "Production scheduling"

1

Lopez, Pierre, and Franois Roubellat, eds. Production Scheduling. London, UK: ISTE, 2008. http://dx.doi.org/10.1002/9780470611050.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Pierre, Lopez, and Roubellat Francois, eds. Production scheduling. Hoboken, NJ: John Wiley & Sons, 2008.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Sarin, Subhash Chander. Stochastic scheduling. Cambridge: Cambridge University Press, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Sarin, Subhash Chander. Stochastic scheduling. Cambridge: Cambridge University Press, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Jarboui, Bassem, Patrick Siarry, and Jacques Teghem, eds. Metaheuristics for Production Scheduling. Hoboken, NJ USA: John Wiley & Sons, Inc., 2013. http://dx.doi.org/10.1002/9781118731598.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Herrmann, Jeffrey W., ed. Handbook of Production Scheduling. Boston, MA: Springer US, 2006. http://dx.doi.org/10.1007/0-387-33117-4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Herbert, Jane. Production scheduling: Module 40. 2nd ed. Rossendale: Footwear OPEN TECH Unit, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

W, Bronn John, and Humphreys Gary C, eds. Project and production scheduling. Chicago, Ill: Probus Pub. Co., 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Merit, Don. Print production scheduling primer. Pittsburgh: GATFPress, 2001.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Jurgen, Dorn, and Froeschl Karl, eds. Scheduling of production processes. New York: Ellis Horwood, 1993.

Find full text
APA, Harvard, Vancouver, ISO, and other styles

Book chapters on the topic "Production scheduling"

1

King, John R. "Production Scheduling." In Computer-Aided Production Management, 267–80. Berlin, Heidelberg: Springer Berlin Heidelberg, 1988. http://dx.doi.org/10.1007/978-3-642-73318-5_17.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Stecca, Giuseppe. "Scheduling." In CIRP Encyclopedia of Production Engineering, 1–4. Berlin, Heidelberg: Springer Berlin Heidelberg, 2014. http://dx.doi.org/10.1007/978-3-642-35950-7_6571-4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Stecca, Giuseppe. "Scheduling." In CIRP Encyclopedia of Production Engineering, 1–4. Berlin, Heidelberg: Springer Berlin Heidelberg, 2017. http://dx.doi.org/10.1007/978-3-642-35950-7_6571-5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Stecca, Giuseppe. "Scheduling." In CIRP Encyclopedia of Production Engineering, 1513–16. Berlin, Heidelberg: Springer Berlin Heidelberg, 2019. http://dx.doi.org/10.1007/978-3-662-53120-4_6571.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Stecca, Giuseppe. "Scheduling." In CIRP Encyclopedia of Production Engineering, 1092–95. Berlin, Heidelberg: Springer Berlin Heidelberg, 2014. http://dx.doi.org/10.1007/978-3-642-20617-7_6571.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Blazewicz, Jacek, Klaus H. Ecker, Erwin Pesch, Günter Schmidt, Malgorzata Sterna, and Jan Weglarz. "Computer Integrated Production Scheduling." In Handbook on Scheduling, 713–60. Cham: Springer International Publishing, 2019. http://dx.doi.org/10.1007/978-3-319-99849-7_18.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Toomey, John W. "Master Production Scheduling." In Materials Management / Logistics Series, 107–21. Boston, MA: Springer US, 2000. http://dx.doi.org/10.1007/978-1-4615-4363-3_8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Ulfsby, Stig. "Dynamic production scheduling." In Computer Integrated Manufacturing, 153–69. London: Springer London, 1990. http://dx.doi.org/10.1007/978-1-4471-1786-5_13.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Ray, Tapabrata, and Ruhul Sarker. "Optimum Oil Production Planning using an Evolutionary Approach." In Evolutionary Scheduling, 273–92. Berlin, Heidelberg: Springer Berlin Heidelberg, 2007. http://dx.doi.org/10.1007/978-3-540-48584-1_10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Gillett, Cary, and Jay Sheehan. "Planning and Scheduling." In The Production Manager's Toolkit, 49–64. 2nd ed. New York: Routledge, 2023. http://dx.doi.org/10.4324/9780367808174-8.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Production scheduling"

1

Kovalyov, Mikhail Y., Xavier Delorme, and Alexandre Dolgui. "Workforce planning for cyclic production of multiple parts." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p47-50.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Kovalyov, Mikhail Y., Xavier Delorme, and Alexandre Dolgui. "Workforce planning for cyclic production of multiple parts." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-p47-50.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Li, Q. Y., L. Wang, and J. J. Xu. "Production data analytics for production scheduling." In 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). IEEE, 2015. http://dx.doi.org/10.1109/ieem.2015.7385838.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Dongni Li and Yan Wang. "Production scheduling in intercell cooperative production mode." In 2012 24th Chinese Control and Decision Conference (CCDC). IEEE, 2012. http://dx.doi.org/10.1109/ccdc.2012.6244076.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Kamara Esteban, Oihane, and Yoseba K. Penya. "Energy-aware foundry production scheduling." In IECON 2012 - 38th Annual Conference of IEEE Industrial Electronics. IEEE, 2012. http://dx.doi.org/10.1109/iecon.2012.6389447.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Fujimura, Shigeru, and Wei Weng. "Spiral-evolutional production scheduling system." In 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). IEEE, 2015. http://dx.doi.org/10.1109/ieem.2015.7385886.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Zhang, Xuerui, Xue Hai, Yasuhiro Shimizu, and Shigeru Fujimura. "Self-construction Production Scheduling System." In 2006 IEEE International Conference on Automation Science and Engineering. IEEE, 2006. http://dx.doi.org/10.1109/coase.2006.326935.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Grobler, Jacomine, Andries P. Engelbrecht, Johan W. Joubert, and Schalk Kok. "A starting-time-based approach to production scheduling with Particle Swarm Optimization." In 2007 IEEE Symposium on Computational Intelligence in Scheduling. IEEE, 2007. http://dx.doi.org/10.1109/scis.2007.367679.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Daniyal, Fahad, and Andrea Cavallaro. "Multi-camera Scheduling for Video Production." In 2011 Conference for Visual Media Production (CVMP). IEEE, 2011. http://dx.doi.org/10.1109/cvmp.2011.8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Liu, Yefeng, Yuan Zhao, Kangju Li, and Shengping Yu. "Optimization and Application of Flexible Production Line Production Scheduling." In 2020 39th Chinese Control Conference (CCC). IEEE, 2020. http://dx.doi.org/10.23919/ccc50068.2020.9188497.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Production scheduling"

1

Taber, Henry G. Tomato Irrigation Scheduling for Optimum Production. Ames: Iowa State University, Digital Repository, 2008. http://dx.doi.org/10.31274/farmprogressreports-180814-488.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Davis, Wayne J., and Albert T. Jones. On-line concurrent simulation in production scheduling. Gaithersburg, MD: National Institute of Standards and Technology, 1989. http://dx.doi.org/10.6028/nist.ir.88-3837.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Davis, Wayne J., and Albert T. Jones. Real-time simulation and production scheduling systems. Gaithersburg, MD: National Institute of Standards and Technology, 1989. http://dx.doi.org/10.6028/nist.ir.89-4070.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Davis, Wayne J., and Albert T. Jones. Artificial intelligence techniques in real-time production scheduling. Gaithersburg, MD: National Institute of Standards and Technology, 1989. http://dx.doi.org/10.6028/nist.ir.88-3891.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Smith, Parker. Production Scheduling at Ardent Mills in Alton, IL. Ames (Iowa): Iowa State University, January 2019. http://dx.doi.org/10.31274/cc-20240624-1159.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

TODD PACIFIC SHIPYARDS CORP SEATTLE WA. Flexible Production Scheduling System (The National Shipbuilding Research Program). Fort Belvoir, VA: Defense Technical Information Center, April 1986. http://dx.doi.org/10.21236/ada445649.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Jarvis, James P., and Melissa R. Bowers. Hierarchical Production Planning and Scheduling in the Apparel Industry. Fort Belvoir, VA: Defense Technical Information Center, June 1995. http://dx.doi.org/10.21236/ada298601.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Davis, Wayne, and Albert Jones. Mathematical decomposition and simulation in real-time production scheduling. Gaithersburg, MD: error:, January 1987. http://dx.doi.org/10.6028/nbs.ir.87-3639.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Sadeh, Norman M., Thomas J. Laliberty, Robert V. Bryant, and Stephen F. Smith. Development of an Integrated Process Planning/Production Scheduling Shell for Agile Manufacturing. Fort Belvoir, VA: Defense Technical Information Center, November 1995. http://dx.doi.org/10.21236/ada310806.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Parwani, Viren. Improving Manufacturing Supply Chains by Integrating Lean Six Sigma and Production Scheduling. Ames (Iowa): Iowa State University, January 2020. http://dx.doi.org/10.31274/cc-20240624-887.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography