Journal articles on the topic 'Prescriptive maintenance'

To see the other types of publications on this topic, follow the link: Prescriptive maintenance.

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Prescriptive maintenance.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Geier, Manuel. "Prescriptive Maintenance mit zentralem Datenportal." BWK ENERGIE. 74, no. 9-10 (2022): 26–27. http://dx.doi.org/10.37544/1618-193x-2022-9-10-26.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Wollen Unternehmen den optimalen Instandhaltungsmix finden, benötigen sie zunächst saubere Maschinendaten. Diese müssen richtig erfasst, konsolidiert und danach bewertet werden, um aus der Analyse Einsichten zu gewinnen, mit denen unerwartete Stillstände vermieden werden und die Instandhaltung gleichzeitig konstant optimiert werden kann. Unternehmen der Energiebranche gelingt das mit einem zentralen Datenportal.
2

Errandonea, Itxaro, Unai Alvarado, Sergio Beltrán, and Saioa Arrizabalaga. "A Maturity Model Proposal for Industrial Maintenance and Its Application to the Railway Sector." Applied Sciences 12, no. 16 (August 17, 2022): 8229. http://dx.doi.org/10.3390/app12168229.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Maintenance is one of the major concerns of the industrial sector. Acquiring better levels of maintenance maturity is one of the objectives to be achieved. Therefore, prescriptive maintenance is one of the areas of recent research. Current works in literature are focused on specifics of maintenance strategies (from preventive to prescriptive), usually related to a fixed asset. No previous work has been identified regarding the methodology and guidelines to be followed to be able to evolve within the different strategies from a generic perspective. To address the lack of a methodology that shows a more evolutionary path between maintenance strategies, this paper presents Maintenance Maturity Model M3: a maturity model that identifies three areas of action, four levels of maturity, and the activities to be carried out in each of them to make progress in the maturity level of maintenance strategies. The implementation of prescriptive maintenance should be done in a gradual way, starting at the lowest levels. M3 approaches the problem from a broader perspective, analyzing the 18 different domains and the different levels of prior maturity to be considered for prescriptive maintenance. A study has also been carried out on the different maintenance actions and the applicability of the proposed M3 maturity model to the railway infrastructure maintenance is discussed. In addition, this paper also highlights future research lines and open issues.
3

Yamashita, Akiko, Mitsuyuki Kawakami, Yoshimasa Inagaki, and Takao Ohkubo. "A Prescriptive Exercise Program for Health Maintenance." International Journal of Occupational Safety and Ergonomics 7, no. 2 (January 2001): 195–209. http://dx.doi.org/10.1080/10803548.2001.11076486.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Kothona, Despoina, Ioannis P. Panapakidis, and Georgios C. Christoforidis. "Development of prescriptive maintenance methodology for maintenance cost minimization of photovoltaic systems." Solar Energy 271 (March 2024): 112402. http://dx.doi.org/10.1016/j.solener.2024.112402.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Kawakami, M., A. Yamashita, T. Ohkubo, and Y. Sanbayashi. "A Reasonable Prescriptive Exercise Program for Health Care Maintenance." Proceedings of the Human Factors and Ergonomics Society Annual Meeting 44, no. 33 (July 2000): 6–178. http://dx.doi.org/10.1177/154193120004403327.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Koops, Lily Geraldine. "Optimized Maintenance Decision-Making – A Simulation-supported Prescriptive Analytics Approach based on Probabilistic Cost-Benefit Analysis." PHM Society European Conference 5, no. 1 (July 22, 2020): 14. http://dx.doi.org/10.36001/phme.2020.v5i1.1269.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Prescriptive Maintenance strategies are emerging as potential next level of reliability and maintenance best practice. Likely outcomes of maintenance alternatives and their effects on e.g. cost and safety are comparatively evaluated by exploiting various sources of data, knowledge and models. By this means, optimized courses of actions are recommended to quickly resolve problems and to automate Maintenance, Repair and Overhaul (MRO) decisions. In this work, the key question is pursued as to how their dependability and potential business advantage can be assessed and improved in the presence of uncertainty and variability of various decision-influencing factors such as degradation and maintenance model parameters and cost sources. For this purpose, a step-by-step procedure to optimal solution prescription and potential / risk assessment is developed based on a probabilistic approach to cost-benefit analysis and on the definition of relevant metrics. By the help of a Wiener process degradation model capable of implementing random effects of imperfect repairs and a Monte Carlo simulation, its value is illustrated by a use case example – repair / replacement decision support in the aeronautical context. The probabilistic approach not only allows to determine, which decision option promises the higher profit and is thus preferred, but also with which risk and potential cost disadvantage it is associated. Furthermore, it uncovers, where higher-quality data or information, can gainfully reduce result uncertainty and hence be assigned a monetary value. It is argued that the presented approach could give industry practitioners directions for identifying and optimizing business cases for Prescriptive Maintenance, by pointing at which sources of data or information are particularly valuable and hence justify dedicated investments for acquiring it. The relevance of the results is discussed specifically with reference to emerging digitized and automated repair processes as well as more generally in the context of future data-trading schemes.
7

Fox, Harriet, Ajit C. Pillai, Daniel Friedrich, Maurizio Collu, Tariq Dawood, and Lars Johanning. "A Review of Predictive and Prescriptive Offshore Wind Farm Operation and Maintenance." Energies 15, no. 2 (January 11, 2022): 504. http://dx.doi.org/10.3390/en15020504.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Offshore wind farms are a rapidly developing source of clean, low-carbon energy and as they continue to grow in scale and capacity, so does the requirement for their efficient and optimised operation and maintenance. Historically, approaches to maintenance have been purely reactive. However, there is a movement in offshore wind, and wider industry in general, towards more proactive, condition-based maintenance approaches which rely on operational data-driven decision making. This paper reviews the current efforts in proactive maintenance strategies, both predictive and prescriptive, of which the latter is an evolution of the former. Both use operational data to determine whether a turbine component will fail in order to provide sufficient warning to carry out necessary maintenance. Prescriptive strategies also provide optimised maintenance actions, incorporating predictions into a wider maintenance plan to address predicted failure modes. Beginning with a summary of common techniques used across both strategies, this review moves on to discuss their respective applications in offshore wind operation and maintenance. This review concludes with suggested areas for future work, underlining the need for models which can be simply incorporated by site operators and integrate live data whilst handling uncertainties. A need for further focus on medium-term planning strategies is also highlighted along with consideration of the question of how to quantify the impact of a proactive maintenance strategy.
8

Belov, Sergei, Sergei Nikolaev, and Ighor Uzhinsky. "Hybrid Data-Driven and Physics-Based Modeling for Gas Turbine Prescriptive Analytics." International Journal of Turbomachinery, Propulsion and Power 5, no. 4 (November 9, 2020): 29. http://dx.doi.org/10.3390/ijtpp5040029.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This paper presents a methodology for predictive and prescriptive analytics of a gas turbine. The methodology is based on a combination of physics-based and data-driven modeling using machine learning techniques. Combining these approaches results in a set of reliable, fast, and continuously updating models for prescriptive analytics. The methodology is demonstrated with a case study of a jet-engine power plant preventive maintenance and diagnosis of its flame tube. The developed approach allows not just to analyze and predict some problems in the combustion chamber, but also to identify a particular flame tube to be repaired or replaced and plan maintenance actions in advance.
9

Ansari, Fazel, Robert Glawar, and Tanja Nemeth. "PriMa: a prescriptive maintenance model for cyber-physical production systems." International Journal of Computer Integrated Manufacturing 32, no. 4-5 (February 20, 2019): 482–503. http://dx.doi.org/10.1080/0951192x.2019.1571236.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Liu, Bin, Jing Lin, Liangwei Zhang, and Uday Kumar. "A Dynamic Prescriptive Maintenance Model Considering System Aging and Degradation." IEEE Access 7 (2019): 94931–43. http://dx.doi.org/10.1109/access.2019.2928587.

Full text
APA, Harvard, Vancouver, ISO, and other styles
11

Shohet, Igal M., and Ad Straub. "PERFORMANCE-BASED-MAINTENANCE: A COMPARATIVE STUDY BETWEEN THE NETHERLANDS AND ISRAEL." International Journal of Strategic Property Management 17, no. 2 (June 27, 2013): 199–209. http://dx.doi.org/10.3846/1648715x.2013.807482.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Traditional maintenance contracts using the unit price system and prescriptive specifications are simple in their structure and implementation. Implementation of prescriptive-based specification reduces though the flexibility of the procurement and limits the possibilities of the contractor to improve the in-sight operation. Furthermore, the management of the contract faces difficulties such as poor performance of the buildings and ineffective contract management. Performance-Based-Maintenance (PBM) attains an alternative means for outsourcing of maintenance. The objective of the study was to comparatively assess the state-of-the-art of PBM between the Netherlands and Israel, with the focus on performance of public facilities and cost of the service. Pilot studies, carried out in the Netherlands and Israel, reveal that PBM attains high potential of cost-savings (20%) and improved performance. The paper concludes with provision of a future bidding system for PBM contracts.
12

Frawley, Jack. "What Should Schools do About Aboriginal Language Maintenance?" Aboriginal Child at School 20, no. 1 (March 1992): 3–14. http://dx.doi.org/10.1017/s0310582200007690.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
In addressing this question, I will briefly outline the existing types of language maintenance program models, and what schools can do about Aboriginal language maintenance in the Aboriginal community school context. I have suggested a number of guiding principles for Aboriginal schools which are not intended to be prescriptive, but rather to establish a basis for dialogue and discussion from which language maintenance programs could be developed.
13

Petroutsatou, K., and I. Ladopoulos. "Integrated Prescriptive Maintenance System (PREMSYS) for Construction Equipment Based on Productivity." IOP Conference Series: Materials Science and Engineering 1218, no. 1 (January 1, 2022): 012006. http://dx.doi.org/10.1088/1757-899x/1218/1/012006.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Abstract It is now imperative to create smart systems that prevent mechanical damage through timely preventive maintenance, particularly in construction projects with strict time schedules and budgets. Construction equipment is the largest capital investment for construction companies. Proper maintenance is of major importance for efficiency, productivity, minimization of equipment costs, and environmental management. The aim of this study is to propose an integrated smart system that will monitor the condition based on productivity of the equipment and will provide diagnostic data, helping to optimize the production process, achieve timely maintenance and increasing the expected “economic” life of the equipment. At the same time, it will positively provide the concept for sustainable or green construction with the minimization and elimination of harmful effects on the environment and on the human. The system will include sensors, placed on specific construction equipment components, and will collect measurements for their use and condition, through real-time data export. These data will then be sent using wireless networks to a main server. Extraction of performance measurements and machine learning (ML) data processing will determine when the equipment needs predictive maintenance and repair. Proper, timely and prescriptive maintenance of construction equipment will reduce their environmental footprint and any human harmful emissions, while saving energy during their operating phase and optimizing production processes through monitoring “dead” time.
14

Matyas, Kurt, Tanja Nemeth, Klaudia Kovacs, and Robert Glawar. "A procedural approach for realizing prescriptive maintenance planning in manufacturing industries." CIRP Annals 66, no. 1 (2017): 461–64. http://dx.doi.org/10.1016/j.cirp.2017.04.007.

Full text
APA, Harvard, Vancouver, ISO, and other styles
15

Kolar, Davor, Dragutin Lisjak, Martin Curman, and Michał Pająk. "Condition Monitoring of Rotary Machinery Using Industrial IOT Framework." Tehnički glasnik 16, no. 3 (June 23, 2022): 343–52. http://dx.doi.org/10.31803/tg-20220517173151.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Modern maintenance strategies, such as predictive and prescriptive maintenance, which derived from the concept of Industry and Maintenance 4.0, involve the application of the Industrial Internet of Things (IIoT) to connect maintenance objects enabling data collection and analysis that can help make better decisions on maintenance activities. Data collection is the initial step and the foundation of any modern Predictive or Prescriptive maintenance strategy because it collects data that can then be analysed to provide useful information about the state of maintenance objects. Condition monitoring of rotary equipment is one of the most popular maintenance methods because it can distinguish machine state between multiple fault types. The topic of this paper is the presentation of an automated system for data collection, processing and interpretation of rotary equipment state that is based on IIoT framework consisting of an IIoT accelerometer, edge and fog devices, web API and database. Additionally, ISO 10816-1 guidance has been followed to develop module for evaluation of vibration severity. The collected data is also visualized in a dashboard in a near-real time and shown to maintenance engineering, which is crucial for pattern monitoring. The developed system was launched in laboratory conditions using rotating equipment failure simulator to test the logic of data collection and processing. A proposed system has shown that it is capable of automated periodic data collection and processing from remote places which is achieved using Node RED programming environment and MQTT communication protocol that enables reliable, lightweight, and secure data transmission.
16

Grijalvo Martín, Mercedes, Antonia Pacios Álvarez, Joaquín Ordieres-Meré, Javier Villalba-Díez, and Gustavo Morales-Alonso. "New Business Models from Prescriptive Maintenance Strategies Aligned with Sustainable Development Goals." Sustainability 13, no. 1 (December 28, 2020): 216. http://dx.doi.org/10.3390/su13010216.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The industry has entered on the Fourth Industrial Revolution, the so-called Industry 4.0, with global markets and strong competition, some traditional manufacturing firms are implementing new maintenance innovations and policies, based on digitalisation and data driven approach, but also based on servitisation. The implementation of these new equipment maintenance business models, could require new organisational approach at different levels. Different sorts of integration are arranged, in vertical with a flat structure of intelligent, flexible and autonomous units working integrated, in horizontal with a strong external and internal supply chain integration, and in transverse, with an integrated approach that link internal and external stakeholders. A new prescriptive maintenance business model for equipment exploiting digitalisation opportunities, including stakeholder relationship is proposed. Different perspectives such as organisational, innovation and sustainability have been adopted to discuss the implications of the proposal. The social value potentially gained as well as the alignment with the SDGs are discussed as well.
17

Gordon, Christopher Ampofo Kwadwo, Baris Burnak, Melis Onel, and Efstratios N. Pistikopoulos. "Data-Driven Prescriptive Maintenance: Failure Prediction Using Ensemble Support Vector Classification for Optimal Process and Maintenance Scheduling." Industrial & Engineering Chemistry Research 59, no. 44 (October 26, 2020): 19607–22. http://dx.doi.org/10.1021/acs.iecr.0c03241.

Full text
APA, Harvard, Vancouver, ISO, and other styles
18

Tolstow, K. T., A. Beiky, and I. El-Thalji. "Maintenance philosophy for an unmanned platform: A case study for an Offshore wind substation." IOP Conference Series: Materials Science and Engineering 1201, no. 1 (November 1, 2021): 012085. http://dx.doi.org/10.1088/1757-899x/1201/1/012085.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Abstract Unmanned installations introduce new challenges for the operations and maintenance. In many offshore windfarms there is a need for offshore substations and these substations can be designed as unmanned installations. Thus, the purpose of this paper is to review and discuss the available maintenance philosophies for unmanned substation platforms and as a result, propose a suitable maintenance philosophy for this type of installations with regards to key performance indicators such as high availability, low maintenance man-hours and minimal fixed maintenance campaigns. It is concluded that maintenance philosophy for unmanned substation shall consider the DIP (Design out and Intelligent preventive maintenance) concept, where the potential benefits of risk-based maintenance, design-out, predictive, and prescriptive maintenance are unlocked. To illustrate the utilization of proposed philosophy, a case study related to cooling system of a substation is presented
19

Nordal, Helge, and Idriss El-Thalji. "Lifetime Benefit Analysis of Intelligent Maintenance: Simulation Modeling Approach and Industrial Case Study." Applied Sciences 11, no. 8 (April 13, 2021): 3487. http://dx.doi.org/10.3390/app11083487.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The introduction of Industry 4.0 is expected to revolutionize current maintenance practices by reaching new levels of predictive (detection, diagnosis, and prognosis processes) and prescriptive maintenance analytics. In general, the new maintenance paradigms (predictive and prescriptive) are often difficult to justify because of their multiple inherent trade-offs and hidden systems causalities. The prediction models, in the literature, can be considered as a “black box” that is missing the links between input data, analysis, and final predictions, which makes the industrial adaptability to such models almost impossible. It is also missing enable modeling deterioration based on loading, or considering technical specifications related to detection, diagnosis, and prognosis, which are all decisive for intelligent maintenance purposes. The purpose and scientific contribution of this paper is to present a novel simulation model that enables estimating the lifetime benefits of an industrial asset when an intelligent maintenance management system is utilized as mixed maintenance strategies and the predictive maintenance (PdM) is leveraged into opportunistic intervals. The multi-method simulation modeling approach combining agent-based modeling with system dynamics is applied with a purposefully selected case study to conceptualize and validate the simulation model. Three maintenance strategies (preventive, corrective, and intelligent) and five different scenarios (case study data, manipulated case study data, offshore and onshore reliability data handbook (OREDA) database, physics-based data, and hybrid) are modeled and simulated for a time period of 20 years (175,200 h). Intelligent maintenance is defined as PdM leveraged in opportunistic maintenance intervals. The results clearly demonstrate the possible lifetime benefits of implementing an intelligent maintenance system into the case study as it enhanced the operational availability by 0.268% and reduced corrective maintenance workload by 459 h or 11%. The multi-method simulation model leverages and shows the effect of the physics-based data (deterioration curves), loading profiles, and detection and prediction levels. It is concluded that implementing intelligent maintenance without an effective predictive horizon of the associated PdM and effective frequency of opportunistic maintenance intervals, does not guarantee the gain of its lifetime benefits. Moreover, the case study maintenance data shall be collected in a complete (no missing data) and more accurate manner (use hours instead of date only) and used to continuously upgrade the failure rates and maintenance times.
20

Moros, D., N. Berrabah, K. D. Searle, and I. G. Ashton. "Maintenance & failure data analysis of an offshore wind farm." Journal of Physics: Conference Series 2767, no. 6 (June 1, 2024): 062006. http://dx.doi.org/10.1088/1742-6596/2767/6/062006.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Abstract Offshore Wind (OW) continues to grow globally at a rapid pace, with growth estimates of 630GW by 2050. To facilitate this rapid growth, costs must continue to be reduced. Reducing operations and maintenance (O&M) costs, which are estimated at 30% of the lifetime costs of wind farms, offers opportunity. This could be achieved by moving current maintenance strategies to a prescriptive strategy. Prescriptive strategies use the turbine monitoring data to determine component remaining useful lifetimes or predict failure windows and then provide an optimised maintenance plan. The first stage of a framework, that can be applied to operational assets, for improving maintenance schedules with failure predictions is presented. Analysis of the SCADA system and the maintenance logs, at an operational offshore wind farm (OWF), with the purpose of identifying turbine failure rates, availabilities and losses and costs from maintenance and failures has been performed. The analysis has revealed two types of maintenance actions, one is cost of maintenance driven and the other cost of downtime driven. It is proposed that, given different characteristics, they should be approached differently in the context of failure predictions. It is also revealed that electrical components are critical to the failure rate and energy losses due to maintenance at the OWF. Electrical components represent approximately 28% of all failures and nearly 40% of revenue loss due downtimes from failure for the period analysed. The power converters drive most electrical failures and are of key commercial interest to the farm. As a result, the power converters should be the target for future prognostic model development. The analysis also shows that with perfect prediction and maintenance scheduling, this OWF could generate an extra 0.26% revenue and a generic 1GW OWF could generate an extra 0.6% extra energy and approximately £1.4m in revenue. This analysis did not reveal the benefit of taking fewer maintenance actions, which should be assessed in future work. Producing a combined prognostic maintenance scheduling method will generate extra wind farm revenues, reduce the number of maintenance actions taken and facilitate the work of maintenance teams.
21

Gonzaga, Luiz Gonzaga da Costa Neto. "analysis of the possibility of reducing spare parts in the maintenance context 4.0." Independent Journal of Management & Production 13, no. 1 (March 1, 2022): 350–63. http://dx.doi.org/10.14807/ijmp.v13i1.1550.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Equipment inspection arose from the need to maintain industrial facilities in satisfactory physical condition, providing the minimum level of safety and reliability in operation and maintenance. Machines and equipment cannot stop operating without planning and managing the supply chain, maintaining large quantities of spare parts stocks. The objective of this work is to analyze the possibility of predictive and / or prescriptive monitoring to contribute to the preventive maintenance of the real condition of the equipment, that is, only in real need, avoiding preventive maintenance for pre-established intervals, consequently reducing the stock of spare parts. To this end, a Systematic Literature Review (RSL) was carried out using the keywords Maintenance 4.0 and Supply Chain Management and Industrial Logistics, identifying the main authors and most relevant journals.
22

Biebl, Fabian, Robert Glawar, Anahid Jalali, Fazel Ansari, Bernhard Haslhofer, Peter de Boer, and Wilfried Sihn. "A conceptual model to enable prescriptive maintenance for etching equipment in semiconductor manufacturing." Procedia CIRP 88 (2020): 64–69. http://dx.doi.org/10.1016/j.procir.2020.05.012.

Full text
APA, Harvard, Vancouver, ISO, and other styles
23

Jeon, Chi-Ho, Chang-Su Shim, Yang-Hee Lee, and Jennifer Schooling. "Prescriptive maintenance of prestressed concrete bridges considering digital twin and key performance indicator." Engineering Structures 302 (March 2024): 117383. http://dx.doi.org/10.1016/j.engstruct.2023.117383.

Full text
APA, Harvard, Vancouver, ISO, and other styles
24

Rahman, Azwanizam b. Che Abdul, Mohd Rahmat Tahir, M. Hamdan Kamarul Bahraini, Mohd Helmi Halim, and Muzamir Isa. "Digital Tools Approach Based On ‘Gerun’ And Online Partial Discharge Monitoring Project To Resolve Alternator’s Failure." Journal of Physics: Conference Series 2312, no. 1 (August 1, 2022): 012041. http://dx.doi.org/10.1088/1742-6596/2312/1/012041.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Abstract There is no online monitoring system and digital tools to monitor generator gas turbine healthiness led to generator failure caused un-planned outages resulted power import and penalty chargers. Maintenance program for generator is based on time-based method. Since 2016 to 2020, Asset Team spent millions of ringgit Malaysia for generator rectification and incurred power import cost due to the failure. To overcome the tripping issues, Generator Health Monitoring System was initiated as a research/pilot project as tools to monitor healthiness of Gas Turbine Generator. This project was categorized as digital transformation initiative (Revolution 4.0) as to enable online monitoring & performing diagnostic & prescriptive. The initiative consisted of 2 main pillars which are Generator Rotor Unhealthiness Notification (GERUN) and Online Partial Discharge Monitoring System (PD ONLINE). The aim of this paper is to share the experience in monitoring, economical way, diagnosis, condition evaluation, and possibility of predicting the performance of the generator. The methodology of the Generator Healthiness is to monitor the real time performance of the generator during running condition through rotor thermal losses, ratio of excitation current over the real output power and stator partial discharge pattern. This real time monitoring can improve the maintenance strategy and planning. As a result, plant’s OEE can be increased, reduce the MTBF and more importantly the repair cost. The parameters have been introduced to prevent the generator sudden failure event and bridge the gap condition monitoring especially on the generator part. Arriving to the objective, this project was categorized as digital transformation initiative (Revolution 4.0) as to enable online monitoring & performing diagnostic & prescriptive. The initiative consisted of 2 main pillars which are Generator Rotor Unhealthiness Notification (GERUN) and Online Partial Discharge monitoring system (PD ONLINE) project. Diagnose & prescriptive and provide asset owners with insights on alternator’s health, subsequently prevent unforeseen failure in real time and prescribe operational mitigations to prolong alternator’s life. Recommends targeted test and maintenance (3rd level maintenance predictive) addressing the exact health issue of the alternator value creation & cost saving by eliminating tripping, scope reduction for major inspection, non-dependable on FSR, internal troubleshooting and etc. The system has been implemented across gas processing and utilities Petronas Gas Berhad for 14 units of gas turbine generator. In view of the success implementation, this digital tool will be duplicate to others Petronas Operating Unit.
25

Molęda, Marek, Bożena Małysiak-Mrozek, Weiping Ding, Vaidy Sunderam, and Dariusz Mrozek. "From Corrective to Predictive Maintenance—A Review of Maintenance Approaches for the Power Industry." Sensors 23, no. 13 (June 27, 2023): 5970. http://dx.doi.org/10.3390/s23135970.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Appropriate maintenance of industrial equipment keeps production systems in good health and ensures the stability of production processes. In specific production sectors, such as the electrical power industry, equipment failures are rare but may lead to high costs and substantial economic losses not only for the power plant but for consumers and the larger society. Therefore, the power production industry relies on a variety of approaches to maintenance tasks, ranging from traditional solutions and engineering know-how to smart, AI-based analytics to avoid potential downtimes. This review shows the evolution of maintenance approaches to support maintenance planning, equipment monitoring and supervision. We present older techniques traditionally used in maintenance tasks and those that rely on IT analytics to automate tasks and perform the inference process for failure detection. We analyze prognostics and health-management techniques in detail, including their requirements, advantages and limitations. The review focuses on the power-generation sector. However, some of the issues addressed are common to other industries. The article also presents concepts and solutions that utilize emerging technologies related to Industry 4.0, touching on prescriptive analysis, Big Data and the Internet of Things. The primary motivation and purpose of the article are to present the existing practices and classic methods used by engineers, as well as modern approaches drawing from Artificial Intelligence and the concept of Industry 4.0. The summary of existing practices and the state of the art in the area of predictive maintenance provides two benefits. On the one hand, it leads to improving processes by matching existing tools and methods. On the other hand, it shows researchers potential directions for further analysis and new developments.
26

Papaioannou, Alexios, Asimina Dimara, Charalampos S. Kouzinopoulos, Stelios Krinidis, Christos-Nikolaos Anagnostopoulos, Dimosthenis Ioannidis, and Dimitrios Tzovaras. "LP-OPTIMA: A Framework for Prescriptive Maintenance and Optimization of IoT Resources for Low-Power Embedded Systems." Sensors 24, no. 7 (March 26, 2024): 2125. http://dx.doi.org/10.3390/s24072125.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Low-power embedded systems have been widely used in a variety of applications, allowing devices to efficiently collect and exchange data while minimizing energy consumption. However, the lack of extensive maintenance procedures designed specifically for low-power systems, coupled with constraints on anticipating faults and monitoring capacities, presents notable difficulties and intricacies in identifying failures and customized reaction mechanisms. The proposed approach seeks to address the gaps in current resource management frameworks and maintenance protocols for low-power embedded systems. Furthermore, this paper offers a trilateral framework that provides periodic prescriptions to stakeholders, a periodic control mechanism for automated actions and messages to prevent breakdowns, and a backup AI malfunction detection module to prevent the system from accessing any stress points. To evaluate the AI malfunction detection module approach, three novel autonomous embedded systems based on different ARM Cortex cores have been specifically designed and developed. Real-life results obtained from the testing of the proposed AI malfunction detection module in the developed embedded systems demonstrated outstanding performance, with metrics consistently exceeding 98%. This affirms the efficacy and reliability of the developed approach in enhancing the fault tolerance and maintenance capabilities of low-power embedded systems.
27

Finch, Byron J., and James P. Gilbert. "Developing maintenance craft labor efficiency through an integrated planning and control system: A prescriptive model." Journal of Operations Management 6, no. 3-4 (May 1986): 449–59. http://dx.doi.org/10.1016/0272-6963(86)90016-1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
28

Gibey, Gaultier, Elodie Pahon, Noureddine Zerhouni, and Daniel Hissel. "Diagnostic and prognostic for prescriptive maintenance and control of PEMFC systems in an industrial framework." Journal of Power Sources 613 (September 2024): 234864. http://dx.doi.org/10.1016/j.jpowsour.2024.234864.

Full text
APA, Harvard, Vancouver, ISO, and other styles
29

DENG, HAOXUAN, Bernadin Namoano, BOHAO ZHENG, Samir Khan, and John Ahmet Erkoyuncu. "From Prediction to Prescription: Large Language Model Agent for Context-Aware Maintenance Decision Support." PHM Society European Conference 8, no. 1 (June 27, 2024): 10. http://dx.doi.org/10.36001/phme.2024.v8i1.4114.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Predictive analytics with machine learning approaches has widely penetrated and shown great success in system health management over the decade. However, how to convert the prediction to an actionable plan for maintenance is still far from mature. This study investigates how to narrow the gapbetween predictive outcomes and prescriptive descriptions for system maintenance using an agentic approach based on the large language model (LLM). Additionally, with the retrieval-augmented generation (RAG) technique and tool usage capability, the LLM can be context-aware when making decisions in maintenance strategy proposals considering predictions from machine learning. In this way, the proposed method can push forward the boundary of current machine-learning methods from a predictor to an advisor for decision-making workload offload. For verification, a case study on linear actuator fault diagnosis is conducted with the GPT-4 model. The result demonstrates that the proposed method can perform fault detection without extra training or fine-tuning with comparable performance to baseline methods and deliver more informatic diagnosis analysis and suggestions. This research can shed light on the application of large language models in the construction of versatile and flexible artificial intelligence agents for maintenance tasks.
30

Ighravwe, Desmond Eseoghene. "Assessment of Sustainable Maintenance Strategy for Manufacturing Industry." Sustainability 14, no. 21 (October 25, 2022): 13850. http://dx.doi.org/10.3390/su142113850.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This study creates a framework to aid in the sustainability of maintenance strategies. The framework was created using expertise from the industry and academia. Using this knowledge, three multi-criteria tools were chosen for the maintenance strategies evaluation. The tools include grey relational analysis (GRA) techniques, additive ratio assessment (ARAS), and step-wise weight assessment ratio analysis (SWARA). In a production system, they were used to assess four planned maintenance strategies. The strategies are periodic maintenance (S1), meter-based maintenance (S2), predictive maintenance (S3) and prescriptive maintenance (S4). The ARAS approach was used to obtain the strategy rating for the various requirements. This study used the SWARA method to determine the requirements’ importance using an intuitionistic fuzzy triangular number. The ARAS results were combined using the GRA method. This study observed that the criteria utilised to choose a maintenance strategy for equipment depend on the information collected from six specialists in a manufacturing organisation. For instance, it was discovered that S3 was the maintenance approach that best suited the system’s technical needs. At the same time, S2 was found to be less effective. The economic needs analysis showed that S1 is the maintenance strategy that is most appropriate for the system, while S3 is the least appropriate. S1 is the most appropriate maintenance method for the system, given the social requirements, whereas S2 is the least effective. According to the results of the environmental requirements, S2 is the best maintenance plan for the system, while S4 is the worst. According to the GRA approach, the system’s best and least appropriate maintenance strategies are S2 and S4, respectively.
31

Sathyapalan, Dipu T., Jini James, Sangita Sudhir, Vrinda Nampoothiri, Praveena N. Bhaskaran, Nandita Shashindran, Jisha Thomas, et al. "Antimicrobial Stewardship and Its Impact on the Changing Epidemiology of Polymyxin Use in a South Indian Healthcare Setting." Antibiotics 10, no. 5 (April 21, 2021): 470. http://dx.doi.org/10.3390/antibiotics10050470.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Polymyxins being last resort drugs to treat infections triggered by multidrug-resistant pathogens necessitates the implementation of antimicrobial stewardship program (ASP) initiatives to support its rational prescription across healthcare settings. Our study aims to describe the change in the epidemiology of polymyxins and patient outcomes following the implementation of ASP at our institution. The antimicrobial stewardship program initiated in February 2016 at our 1300 bed tertiary care center involved post-prescriptive audits tracking polymyxin consumption and evaluating prescription appropriateness in terms of the right indication, right frequency, right drug, right duration of therapy and administration of the right loading dose (LD) and maintenance dose (MD). Among the 2442 polymyxin prescriptions tracked over the entire study period ranging from February 2016 to January 2020, the number of prescriptions dropped from 772 prescriptions in the pre-implementation period to an average of 417 per year during the post-implementation period, recording a 45% reduction. The quarterly patient survival rates had a significant positive correlation with the quarterly prescription appropriateness rates (r = 0.4774, p = 0.02), right loading dose (r = 0.5228, p = 0.015) and right duration (r = 0.4361, p = 0.04). Our study on the epidemiology of polymyxin use demonstrated favorable effects on the appropriateness of prescriptions and mortality benefits after successful implementation of antimicrobial stewardship in a real-world setting.
32

Santiago, Rogerio Adriano da Fonseca, Natasha Benjamim Barbosa, Henrique Gomes Mergulhão, Tassio Farias de Carvalho, Alex Alisson Bandeira Santos, Ricardo Cerqueira Medrado, Jose Bione de Melo Filho, Oberdan Rocha Pinheiro, and Erick Giovani Sperandio Nascimento. "Data-Driven Models Applied to Predictive and Prescriptive Maintenance of Wind Turbine: A Systematic Review of Approaches Based on Failure Detection, Diagnosis, and Prognosis." Energies 17, no. 5 (February 21, 2024): 1010. http://dx.doi.org/10.3390/en17051010.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Wind energy has achieved a leading position among renewable energies. The global installed capacity in 2022 was 906 GW of power, with a growth of 8.4% compared to the same period in the previous year. The forecast is that the barrier of 1,000,000 MW of installed wind capacity in the world will be exceeded in July 2023, according to data from the World Association of Wind Energy. In order to support the expected growth in the wind sector, maintenance strategies for wind turbines must provide the reliability and availability necessary to achieve these goals. The usual maintenance procedures may present difficulties in keeping up with the expansion of this energy source. The objective of this work was to carry out a systematic review of the literature focused on research on the predictive and prescriptive maintenance of wind turbines based on the implementation of data-oriented models with the use of artificial intelligence tools. Deep machine learning models involving the detection, diagnosis, and prognosis of failures in this equipment were addressed.
33

Tektaş, Berna, Hasan Hüseyin Turan, Nihat Kasap, Ferhan Çebi, and Dursun Delen. "A Fuzzy Prescriptive Analytics Approach to Power Generation Capacity Planning." Energies 15, no. 9 (April 26, 2022): 3176. http://dx.doi.org/10.3390/en15093176.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This study examines the long-term energy capacity investment problem of a power generation company (GenCo), considering the drought threat posed by climate change in hydropower resources in Turkey. The mid-term planning decisions such as maintenance and refurbishment scheduling of power plants are also considered in the studied investment planning problem. In the modeled electricity market, it is assumed that GenCos conduct business in uncertain market conditions with both bilateral contracts (BIC) and day-ahead market (DAM) transactions. The problem is modeled as a fuzzy mixed-integer linear programming model with a fuzzy objective and fuzzy constraints to handle the imprecisions regarding both the electricity market (e.g., prices) and environmental factors (e.g., hydroelectric output due to drought). Bellman and Zadeh’s max-min criteria are used to transform the fuzzy capacity investment model into a model with a crisp objective and constraints. The applicability of methodology is illustrated by a case study on the Turkish electric market in which GenCo tries to find the optimal power generation investment portfolio that contains five various generation technologies alternatives, namely, hydropower, wind, conventional and advanced combined-cycle natural gas, and steam (lignite) turbines. The results show that wind turbines with low marginal costs and steam turbines with high energy conversion efficiency are preferable, compared with hydroelectric power plant investments when the fuzziness in hydroelectric output exists (i.e., the expectation of increasing drought conditions as a result of climate change). Furthermore, the results indicate that the gas turbine investments were found to be the least preferable due to high gas prices in all scenarios.
34

Padovano, Antonio, Francesco Longo, Letizia Nicoletti, Lucia Gazzaneo, Alessandro Chiurco, and Simone Talarico. "A prescriptive maintenance system for intelligent production planning and control in a smart cyber-physical production line." Procedia CIRP 104 (2021): 1819–24. http://dx.doi.org/10.1016/j.procir.2021.11.307.

Full text
APA, Harvard, Vancouver, ISO, and other styles
35

Nemeth, Tanja, Fazel Ansari, Wilfried Sihn, Bernhard Haslhofer, and Alexander Schindler. "PriMa-X: A reference model for realizing prescriptive maintenance and assessing its maturity enhanced by machine learning." Procedia CIRP 72 (2018): 1039–44. http://dx.doi.org/10.1016/j.procir.2018.03.280.

Full text
APA, Harvard, Vancouver, ISO, and other styles
36

Glawar, Robert, Fazel Ansari, Csaba Kardos, Kurt Matyas, and Wilfried Sihn. "Conceptual Design of an Integrated Autonomous Production Control Model in association with a Prescriptive Maintenance Model (PriMa)." Procedia CIRP 80 (2019): 482–87. http://dx.doi.org/10.1016/j.procir.2019.01.047.

Full text
APA, Harvard, Vancouver, ISO, and other styles
37

Wan, Chao Yan, Ying Liu, and Xiao Feng Li. "The Determination and Simulation for the Dead Zone of Opening/Closing Mechanism in the Bottom Door of the Railway Freight Cars." Advanced Materials Research 199-200 (February 2011): 372–76. http://dx.doi.org/10.4028/www.scientific.net/amr.199-200.372.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
A new method on determining the dead zone of the bottom door mechanism is proposed in the premise of considering the friction. This method can ensure the bottom doors of the railway cars with the self-unloading coal hoppers to realize the prescriptive mechanical action accurately, timely, and coordinately. The effectiveness of the theoretical analysis results is verified by the computer simulation. This research provides the necessary theoretical reference not only for the application and maintenance of the existing bottom door mechanism, but also for the design, analysis and forecast of the new mechanism. It also lays the base for the motion reliability analysis of the mechanism.
38

Bulut, Merve, and Evrencan Özcan. "Planning of prescriptive maintenance types for generator with fuzzy logic-based genetic algorithm in a hydroelectric power plant." Expert Systems with Applications 240 (April 2024): 122480. http://dx.doi.org/10.1016/j.eswa.2023.122480.

Full text
APA, Harvard, Vancouver, ISO, and other styles
39

Rodríguez, Mauricio, Adolfo Crespo, and Vicente González-Prida. "Enhancing Prescriptive Capabilities in Electrical Substations: A Systemic Impact Factor Approach for Failure Impact Analysis." Energies 17, no. 4 (February 6, 2024): 770. http://dx.doi.org/10.3390/en17040770.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This research looks into a systemic impact factor (SIF) as a complement to enhance the prescriptive capabilities of electric substations with the objective of improving the reliability and robustness of components. As electrical networks become increasingly complex, prescriptive analytical tools are needed to ensure sustained power delivery. The purpose is to develop a framework for evaluating failure effects, including both direct and indirect effects on substation performance. The study makes use of a multi-criteria method that incorporates safety, environment protection, reliability, and network robustness among other factors like SAIDI and SAIFI to determine the actual impact of failures to make better decisions. The methodology is illustrated using a criticality model, and a case study, focusing on operational contexts of the failure. The SIF proposal provides a better understanding of different aspects and their contribution, when a failure event occurs under a given operational context. This factor improves maintenance management by identifying critical equipment and projecting the effects of failure through a specific operation network. A case study in an electrical substation estimates the SIF for each element used in daily operations to improve support services and increase substation dependability. Therefore, SIF is an essential factor to consider in electrical substations for their maintainability and reliability evaluation.
40

Elele, Ugochukwu, Azam Nekahi, Arshad Arshad, and Issouf Fofana. "Towards Online Ageing Detection in Transformer Oil: A Review." Sensors 22, no. 20 (October 18, 2022): 7923. http://dx.doi.org/10.3390/s22207923.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Transformers play an essential role in power networks, ensuring that generated power gets to consumers at the safest voltage level. However, they are prone to insulation failure from ageing, which has fatal and economic consequences if left undetected or unattended. Traditional detection methods are based on scheduled maintenance practices that often involve taking samples from in situ transformers and analysing them in laboratories using several techniques. This conventional method exposes the engineer performing the test to hazards, requires specialised training, and does not guarantee reliable results because samples can be contaminated during collection and transportation. This paper reviews the transformer oil types and some traditional ageing detection methods, including breakdown voltage (BDV), spectroscopy, dissolved gas analysis, total acid number, interfacial tension, and corresponding regulating standards. In addition, a review of sensors, technologies to improve the reliability of online ageing detection, and related online transformer ageing systems is covered in this work. A non-destructive online ageing detection method for in situ transformer oil is a better alternative to the traditional offline detection method. Moreover, when combined with the Internet of Things (IoT) and artificial intelligence, a prescriptive maintenance solution emerges, offering more advantages and robustness than offline preventive maintenance approaches.
41

Wang, Hong Song, Wei Wang, Rui Wang, Wen Bin Wang, Lei Li, and Qian Tian. "Carbonation of Surface Protected Concrete with Silicone Material." Applied Mechanics and Materials 584-586 (July 2014): 883–86. http://dx.doi.org/10.4028/www.scientific.net/amm.584-586.883.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Concrete structures are exposed to carbonation that may cause rapid decay, shortening their service life and raising maintenance and repair costs. Carbonation lowers the alkalinity of the concrete depassivating the steel reinforcement. The prescriptive methodology is not a guarantee to obtain the desired service lives of 50 or 100 years. Surface treatment is commonly used to improve the resistance of concrete to carbonation. Using the silicone materials to an immersion treatment can effectively block the invasion of harmful substances,the carbonation of concretes with surface protection with silicone materials was evaluated. The results showed silicone can lower carbonation depth than the non-protected concretes. The carbonation depth will not increase significantly in the latter part of the concrete service.
42

Kondratenko, Vitalii, and Valeriia Demynchuk. "FEATURES OF ADMINISTRATIVE LEGAL STATUS OF ORGANS OF JUSTICE ІN UKRAINE." Scientific Notes Series Law 1, no. 9 (2020): 74–77. http://dx.doi.org/10.36550/2522-9230-2020-1-9-74-77.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
In the article a concept and exposed maintenance of administrative legal status of the system of organs of justice and directly Ministry of Justice of Ukraine are formed as complex of tasks, administrative duties and rights in the field of executive prescriptive activity on the grant of administrative services by structural subdivisions of the marked ministry and grounds of administrative responsibility in the field of it with the aim of providing of rights, freedoms and legal interests of physical and legal persons. To the elements of status of organs of justice a task, legal duties and rights, is attributed from their implementation, and administrative responsibility. Reasonably, that legal rights for Ministry of Justice of Ukraine are divided into certain kinds on questions a collaboration with a population, internal organizational activity, works with informative resources and measures of administrative compulsion. Separate attention displaces on the inalienable element of maintenance of administrative legal status of organs of justice as administrative responsibility of physical and legal persons, that is used in an analysable sphere.
43

Lorente, Quentin, Eric Villeneuve, Christophe Merlo, Guy André Boy, and François Thermy. "Development of a digital twin for collaborative decision‐making, based on a multi‐agent system: application to prescriptive maintenance." INCOSE International Symposium 32, S1 (February 2022): 109–17. http://dx.doi.org/10.1002/iis2.12875.

Full text
APA, Harvard, Vancouver, ISO, and other styles
44

Elbasheer, Mohaiad, Francesco Longo, Giovanni Mirabelli, Antonio Padovano, Vittorio Solina, and Simone Talarico. "Integrated Prescriptive Maintenance and Production Planning: a Machine Learning Approach for the Development of an Autonomous Decision Support Agent." IFAC-PapersOnLine 55, no. 10 (2022): 2605–10. http://dx.doi.org/10.1016/j.ifacol.2022.10.102.

Full text
APA, Harvard, Vancouver, ISO, and other styles
45

Atikah, Ika, and Nur Rohim Yunus. "Urgency of Akad as The Protection of Rahn Consumer." JURNAL HUKUM ISLAM 19, no. 1 (June 17, 2021): 1–20. http://dx.doi.org/10.28918/jhi.v19i1.3570.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This paper analyzes consumer protection in Rahn's transactions from the perspective of sharia economic law. This normative legal research uses a statutory and conceptual approach. The analysis technique uses prescriptive analysis. The results show that, customer protection in rahn transactions can occur if the pillars and conditions are valid for the contract by applying the principles of expediency, justice and equality (al-musawah), where the parties have a close relationship to fulfill their rights and obligations. According to the DSN MUI Fatwa No. 25/DSN-MUI/III/2002 rahn contracts must meet the following conditions: Murtahin (recipient of goods) has the right to hold Marhun (goods) until all debts of Rahin (who delivered goods) are repaid. Marhun and his benefits remain the property of Rahin. Marhun may not be used by Murtahin except with Rahin's permission, without reducing the value of Marhun and its utilization. The maintenance and storage of Marhun is Rahin's obligation, but it can be done by Murtahin, while the cost and maintenance of storage remains Rahin's obligation. Maintenance and storage costs should not be determined based on the loan amount. When it is due, Murtahin must warn Rahin to pay off the debt immediately. However, if Rahin is unable to pay off the debt, then Marhun may be sold through auction in accordance with sharia economic law. The proceeds from the sale of Marhun were used to pay off outstanding debts, maintenance and storage costs. The excess of the sale proceeds belongs to Rahin and the shortage becomes Rahin's obligation.
46

Lozano‐Valcarcel, Juan Mauricio, Juan Daniel Cassiani, Thomas Kraenkel, Christoph Gehlen, and Sylvia Kessler. "Reliability and cost analysis of selected repair methods of the new TR Instandhaltung." ce/papers 6, no. 6 (December 2023): 1395–403. http://dx.doi.org/10.1002/cepa.2788.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
AbstractIn Germany, the new Technical Specification for Maintenance (TR Instandhaltung) forms the basis for planning, management, and implementation of maintenance measures on reinforced concrete structures. In the case of chloride‐induced corrosion, different concrete repair methods are specified therein for defined depth‐dependent chloride concentrations in relation to the concrete cover, following thus a prescriptive approach. In contrast, a full‐probabilistic, performance‐based approach sets limits to the so‐called “reliability index” (β). These limits are related to a maximum accepted probability of occurrence of an unwanted event, which in the case of chloride exposure, is the corrosion of the reinforcement. Since the value of β depends inherently on the depth‐dependent chloride concentration and the concrete cover, the limits set on them by the TR must be related to an implicit value of β. Therefore, in this contribution, these limits were analysed and evaluated. Additionally, the resulting costs of each method were estimated and analysed in terms of β at the time of the repair. Both the limits and the resulting costs provide helpful information in the context of a performance‐based approach for the through‐life management of reinforced concrete structures.
47

Meissner, Robert, Antonia Rahn, and Kai Wicke. "Developing prescriptive maintenance strategies in the aviation industry based on a discrete-event simulation framework for post-prognostics decision making." Reliability Engineering & System Safety 214 (October 2021): 107812. http://dx.doi.org/10.1016/j.ress.2021.107812.

Full text
APA, Harvard, Vancouver, ISO, and other styles
48

Nadarajah, Selvaprabu, and Andre A. Cire. "Network-Based Approximate Linear Programming for Discrete Optimization." Operations Research 68, no. 6 (November 2020): 1767–86. http://dx.doi.org/10.1287/opre.2019.1953.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Several prescriptive tasks in business and engineering as well as prediction in machine learning entail the solution of challenging discrete optimization problems. We recast the typical optimization formulation of these problems as high-dimensional dynamic programs and approach their approximation via linear programming. We develop tractable approximate linear programs with supporting theory by bringing together tools from state-space aggregations, networks, and perfect graphs (i.e., graph completions). We embed these models in a simple branch-and-bound scheme to solve applications in marketing analytics and the maintenance of energy or city-owned assets. We find that the resulting technique substantially outperforms a state-of-the-art commercial solver as well as aggregation-heuristics in terms of both solution quality and time. Our results motivate further consideration of networks and graph theory in approximate linear programming for solving deterministic and stochastic discrete optimization problems.
49

Victor, Christina, Linda Grenade, and Duncan Boldy. "Measuring loneliness in later life: a comparison of differing measures." Reviews in Clinical Gerontology 15, no. 1 (February 2005): 63–70. http://dx.doi.org/10.1017/s0959259805001723.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The social environment is one of the key factors determining the quality of life of older people. Research has consistently demonstrated a strong and positive relationship between social engagement in all forms but especially participation within kin and wider social networks, and a high quality of life. However, this recognition of the importance of this relationship is not new. In the early 1960s, the ‘activity theorists’ of aging posited that the key to a good old age was the maintenance of high levels of activity, including social participation and the maintenance of kin- and friendship-based relationships. This resonates with the ideas of Rowe and Kahn who suggest that a high level of social engagement is a key factor in achieving the individually and socially desired goal of ‘successful aging’. Furthermore, they argue that, with advanced age, the social context, in combination with the physical environment, exerts a more potent influence upon the experience of later life than either intrinsic genetic or biological factors. Whilst the prescriptive strictures of activity theory and successful aging remain the subject of debate, there seems little doubt that the social environment continues to exert both a powerful influence upon, and provides a context within which people experience old age, both individually and collectively.
50

Sage, Drew, Michael Bieganski, and Andrew Grant. "Lean offshore platform design." APPEA Journal 57, no. 2 (2017): 635. http://dx.doi.org/10.1071/aj16077.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Current industry practices of prescriptive design and duplication of previous work on offshore oil and gas facilities have often caused relatively simple design requirements to be executed as large, maintenance-heavy, expensive platforms. The question of whether equipment is technically justified is rarely asked, and the potential benefits of minimised systems are rarely realised. By adopting lean design thinking, where all equipment must be technically justified as essential to operation before being included on the platform, the benefits are twofold. First, personal safety is improved because less equipment is required to be maintained offshore, meaning fewer offshore man-hours. Second, significant cost savings can be achieved because less offshore equipment means smaller platforms. This paper outlines the design, operating, manning and maintenance philosophies that form the basis for lean design thinking, and the effect this thinking has on both offshore man-hours and facility costs. Two case studies have been undertaken to evaluate the quantifiable differences between conventional platform design and lean platform design. Aker Solutions’ Lean Semi has been compared with a conventional semisubmersible platform to show that substructure weight savings of up to 30% are achievable; in addition, Aker Solutions’ Hybrid Compression Facility has been compared with a conventional compression platform to show that topsides weight savings of more than 50% are achievable.

To the bibliography