Dissertations / Theses on the topic 'Play equipment'

To see the other types of publications on this topic, follow the link: Play equipment.

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Play equipment.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Metin, Pinar. "The Effects Of Traditional Playground Equipment Design In Children&amp." Master's thesis, METU, 2003. http://etd.lib.metu.edu.tr/upload/1213727/index.pdf.

Full text
Abstract:
In this research, concept of play and types of outdoor playgrounds were explored in the light of the relevant literature. A field study was conducted in order to determine the attributes of traditional type playground equipment in children&
#8217
s developmental needs. KurtuluS Park of Ankara was determined as the research area whereas, 70 children, aged between 6 to 12, were randomly selected and observed. Data on age, sex, favourite type of playground equipment and play behaviour of the child were collected by means of an observation sheet. A short interview with the child was also conducted after the observation session. Collected data were encoded, analyzed and interpretted by using Pearson&
#8217
s Chi-square Test and Fisher&
#8217
s Exact Chi-square Test with 95% ( &
#945
= 0.05 ) confidence intervals. The results of the field study revealed that today&
#8217
s playgrounds have little value in terms of play. Limitations of fixed playground equipment directly affect children&
#8217
s developmental needs. The findings of the research study indicates that traditional type play structures support physical and social development of the child to a certain extent. However, this kind of equipment do not foster cognitive and emotional development of children.
APA, Harvard, Vancouver, ISO, and other styles
2

Novais, Ana Maria Teixeira Duarte de Sousa. "Play sound system." Master's thesis, Universidade de Lisboa. Faculdade de Arquitetura, 2015. http://hdl.handle.net/10400.5/12449.

Full text
Abstract:
Dissertação apresentada na Universidade de Lisboa - Faculdade de Arquitetura, para obtenção do grau de Mestre em Design de Produto.
A consciência da importância de espaços públicos dedicados a crianças no seu desenvolvimento integral, tem vindo a crescer desde os finais do século XIX. Esta importância aumenta quando nos deparamos com algumas transformações na nossa sociedade como a redução do tamanho das famílias e a diminuição dos espaços domésticos para brincar, entre outras. Paralelamente, há um crescimento do mercado de brinquedos e equipamentos lúdico-pedagógicos de teor científico. Assim, na presente dissertação, pretende-se projectar um sistema de equipamentos urbanos lúdicos para o público infantil que englobe música e os benefícios desta, com o objectivo de associar o conhecimento a uma actividade lúdica, facilitar a aprendizagem e, ao mesmo tempo, promover o exercício físico e o desenvolvimento social. Sendo uma dissertação de teor prático, recorrer-se-á a uma metodologia mista. Primeiramente não intervencionista de observação directa, recolha e organização da literatura e numa segunda fase, intervencionista, a investigação activa, que consiste no projecto do sistema que será confrontada com diversos especialistas. Teve-se como objectivo projectar um sistema que leve à interacção com a música contribuindo para uma melhor relação entre as crianças e o conhecimento facilitando-lhes a aprendizagem. Assim esperamos contribuir para um maior conhecimento nas áreas do design de equipamentos infantis e criar um sistema passível de ser divulgado e comercializado mais tarde.
ABSTRACT: The awareness of the importance of public spaces dedicated to children in their full development has been growing since the late nineteenth century. This importance increases when we face with some changes in our society such as the reducing size of families and domestic space to play, among other. In parallel, there is also a growth of recreational and educational toys and equipment for scientific content market. Thus, in the present work, we intend to design an urban recreational equipment system for children that embraces music and its benefits in order to link knowledge to a recreational activity, facilitate learning and, at the same time, promoting exercise and social development. Being a practical dissertation, it will be applied a mixed methodology. First non-interventional of direct observation, gathering and organizing literature. In a second stage an interventional one through active interventional research, which consists in the designing of the system that will be confronted with different experts. The objective is to lead to the interaction with music contributing to a better relationship between children and knowledge and facilitating their learning. We hope to collaborate for a better knowledge in children equipment design area and create a system that can be marketed later.
APA, Harvard, Vancouver, ISO, and other styles
3

Bowyer, Sonya. "Assessment of effects caused by tennis equipment change under extended real-play use." Thesis, Loughborough University, 2003. https://dspace.lboro.ac.uk/2134/33909.

Full text
Abstract:
There is an increasing awareness of the necessity to evaluate the effects of tennis equipment in combination with players and the corresponding need for new methods of testing to be developed. This research has investigated the effectiveness of a range of objective measurements of player performance and their ability to quantity the effects of equipment modification and player fatigue. The hypothesis of this research was that if different designs of tennis equipment affect a player differently in terms of either accelerated/reduced fatigue or increased/reduced likelihood of injury, then there must be some changes in either the impact dynamics in terms of shock loading and vibration transmission, or through kinematic changes in terms of swing motion and biomechanics. Furthermore, it was hypothesised that using state-of-the-art instrumentation technologies in conjunction with a controlled experimental protocol, it may be possible to measure some of these changes.
APA, Harvard, Vancouver, ISO, and other styles
4

Carlzon, Martin. "Adaption of the Space Plug-and-play Interface Simulation Equipment to provide support for the Space Plug-and-play Avionics architecture." Thesis, KTH, Skolan för informations- och kommunikationsteknik (ICT), 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-50838.

Full text
Abstract:
The Space Plug-and-play Interface Simulation Equipment (SPISE) box was developed by ÅAC to aid in the debugging of satellite modules. This report covers the analysis and conversion of this box to provide initial support for the Space Plug-and-play Avionics (SPA) set of protocols in a single Field Programmable Gate Array (FPGA). A major part of this conversion is the design of SPA-U support for which both a host and slave Universal Serial Bus 1.1 (USB 1.1) stack is needed. The comparison of methods to get this functionality and the final design of the Intellectual Property (IP) cores which are implemented in the Very High Speed Integrated Circuit Hardware Description Language (VHDL) language utilizing the freely available from OpenCores, USBHostSlave controller IP by Steve Fielding. The intended target hardware for this project is the reuse of the existing platform, an Actel A3P1000 FPGA containing one million gates. Described in this report are the necessary choices made to implement support for the SPA protocols within a limited time and budget while maintaining compatibility with the architecture of the SPISE box.
APA, Harvard, Vancouver, ISO, and other styles
5

Chancellor, Barbara, and barbara chancellor@rmit edu au. "The Changing Face of Play in Australian Primary School Playgrounds." RMIT University. Education, 2007. http://adt.lib.rmit.edu.au/adt/public/adt-VIT20080414.120725.

Full text
Abstract:
This thesis examines the play of children in three Melbourne primary school playgrounds, in diverse socio-economic areas. Play categories were developed and data was collected using qualitative methods. The influence of school policy, teacher supervision styles, playspace design and provision of play equipment was explored and compared for each school. The voices of principals, teachers and children, in conjunction with playground observations and questionnaire response were compiled in order to develop a clear picture of each school playground. Findings showed that children in each school participated in a full range of play categories and were prepared to break school rules in order to do so.
APA, Harvard, Vancouver, ISO, and other styles
6

Hagström, Jessica. "Kul, det regnar! : en kvalitativ undersökning om hur förskolegårdar är anpassade för och används i nederbörd." Thesis, Södertörns högskola, Lärarutbildningen, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:sh:diva-5293.

Full text
Abstract:
Bakgrund Idag spenderar barn mycket tid inomhus eller på schemalagda aktiviteter. I och med barns rättighet till ett hälsosamt liv har förskolan i uppgift att se till att barn får vara ute och där också få en positiv upplevelse av utomhusmiljön så att barnen som vuxna får en bra relation till naturen. Teori Studien utgår från teorier som åskådliggör positiva effekter av utomhusvistelse för barn. Lek i utomhusmiljö bidrar i hög grad till att utveckla motoriska och kognitiva färdigheter och väderväxlingar berikar barnens stimulans av olika sinnen. Teorier visar även att vatten är en stor källa till inspiration och experimentslust. Syfte Syftet är att undersöka hur tre förskolor i Stockholm använder sin förskolegård i nederbörd samt att studera hur redskap på gården är utformade för att kunna användas i nederbörd på hösten. Meningen är att studien ska ge inspiration till andra förskolor att se möjligheter i dagar med nederbörd. Metod Arbetet utgår från observationer på förskolor samt kvalitativa interjuver med en pedagog från varje förskola. Resultat Resultatet visar att redskap finns på alla gårdar men att de överlag inte är utformade speciellt för lek i nederbörd. Redskapen används alltid tillsammans med lösa föremål. Lösa föremål för att hälla och transportera används speciellt i lek med vatten, medan naturföremål används i rollekar under nederbörd. Pedagogernas förhållningssätt till utevistelse och barns lek påverkar hur och med vad barn leker. Ibland ordnas aktiviteter för barnen då det regnar eller snöar, men det anses vara lättare på sommarhalvåret då kombinationen väta och kyla på hösten bidrar till att barnen blir kalla och måste gå in. Terrängen ses inte som hinder vid nederbörd och avskilda platser används ofta av barnen för återhämtning. Markens möjlighet till vattenpölar uppskattas mycket av barnen.
Background Today, children spend much time indoors or on scheduled activities. On account of a child’s right to a healthy life the preschool is assigned to make sure that the children are allowed to be outdoors and to receive a positive experience of the outside environment, thus leading to a good relationship with nature as adults. Theoretical perspectives The study is based on theories that illustrate the positive effects children receive from being outdoors. Playing outdoors contributes greatly to a child’s physical development and the changes in weather enrich a child’s senses. Theories also show that water is a great source of inspiration. Purpose The purpose of this study is to examine how three preschools in  Stockholm use their playground and the equipment on it during wet weather in autumn. This study is supposed to inspire other preschools to discover the possibilities that wet weather offer. Methodology The study is based on observations and qualitative interviews with one  pedagogue from each participating preschool. Conclusion The study show that there are playground equipments on all playgrounds but that they generally are not specifically designed to be used during wet weather. The playground equipment is always used in conjunction with toys. The approach to play and to the outdoors by the pedagogue, affects with what the children play. On occasion, the preschools arrange activities during wet weather but it’s considered easier during the summer semester. The terrain is not considered as an obstacle during wet weather and secluded locations are often used by the children for recreation. The possibilities for puddles in the uneven terrain are very appreciated by the children.
APA, Harvard, Vancouver, ISO, and other styles
7

Kandrack, Allison. "Using Therapeutic Play to Help Children Cope with Changing Social roles Within the Family after Death has Occurred." Digital Commons @ East Tennessee State University, 2019. https://dc.etsu.edu/secfr-conf/2019/schedule/4.

Full text
Abstract:
Play can be beneficial and effective for children experiencing the stress, fears, and anxieties associated with illness or death by expressing their feelings into activity (Brown 2018). It can be difficult for children to verbally communicate complex emotions because they usually are unsure of what words to say to express their emotions. Therapeutic play is a great coping mechanism for coping with death because it allows children to express their emotions through play. Professionals working with children would be better equipped to meet children’s needs with a firmer understanding on the ways in which therapeutic play techniques can be incorporated into their practice. The impact therapeutic play makes can also be beneficial for families as it can help the families understand what the children comprehend which can lead to more efficient communication between members of the family. Professionals aim to assist children in reaching optimal outcomes, which in turn has beneficial impacts for the family overall.
APA, Harvard, Vancouver, ISO, and other styles
8

Bouma, Floris Bastian. "The Playground Project : This project is dividid in three main topics, working with the topic and the meaning of play, the form and the design of the ground, everything comes together in the final project." Thesis, KTH, Urbana och regionala studier, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-283576.

Full text
Abstract:
Playing is the dominant activity in children's daily life, but is the playground still the place where children have their first encounter with societal roles, norms and values of today’s society, through the act of playing? The playground functions as the place where children are forced to educate themselves, in learning to develop, to make decisions, to solve problems, and to regulate emotions. They look for risks in order to test and explore their physical limits. In this research, I will be focusing on the existing playground in the street of my childhood home aiming to gain understanding as to whether or not the playground still fits the needs of children. Is there still space to discover the basic guidelines of social behaviour and finding out one's personal limits? Looking at today’s playground, I see an over-designed, completely protected, safe-in-the-grid play area which leaves no space for one’s own interpretation and imagination and is not at all a suitable space for testing out your own limits. The play objects are already placed in a concrete form and can only be used in one specific way, eliminating any space for personal initiative. I am curious about how these playground designs arose, and whether there is any kind of communication with children about their needs and desires in the context of play. Which parties decide where and how playgrounds are built in the urban landscape, and why playgrounds are not connected with their urban surroundings, but instead form separated and isolated entities. This detached space often does not meet the demands of the children, resulting in them abandoning the designated playing area, and finding play areas of their own, including streets and abandoned buildings or wastelands, sometimes close to traffic, where they chose to play instead. Making the playground as safe as possible by placing the different kind of play equipment behind a fence is actually resulting in its opposite safety in that the children are looking for a different kind of place to play freely. Aiming to answer these questions, I studied the work of Aldo van Eyck and Bruno Munari, both architects who worked on playgrounds and used primary shapes in urban architecture. I am also focussing on the work of Mariana Brussoni, who writes about the importance of the element of risk in playing, and how this affects a child’s development and social behaviour. For this research, I am working closely together with the municipality and NIJHA Playground Equipment Factory to get a better understanding of the origins of playgrounds. Adding to this research, I conducted many conversations with children from different cities and neighbourhoods, with the aim to find out what the perfect play area is for children and how that fits in the urban landscape, or more specifically, in my own street.
APA, Harvard, Vancouver, ISO, and other styles
9

Labre, Nathalie Sandra. "An instance of the trade between the United States and Latin America applied to the playground industry." CSUSB ScholarWorks, 2001. https://scholarworks.lib.csusb.edu/etd-project/1960.

Full text
Abstract:
This project presents the marketing strategy that should be developed in order to be successful in the Latin American market. Therefore, it is necessary to analyze the market's opportunities and threats linked to the customers/consumers expectations by using the SWOT (strengths, weaknesses, opportunities and threats) analysis.
APA, Harvard, Vancouver, ISO, and other styles
10

Andersson, Emilia. "Utveckling av vippgunga för barn i åldrarna 1-3 år." Thesis, Högskolan i Skövde, Institutionen för teknik och samhälle, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:his:diva-8272.

Full text
Abstract:
Under våren år 2013 har Emilia Andersson, en designingenjörsstudent på Högskolan i Skövde, utfört ett produktutvecklingsprojekt i samarbete med HAGS Aneby AB. Syftet med projektet var att utveckla en vippgunga vars storlek skulle vara anpassad för barn i åldrarna 1-3 år. Målet var att vippgungan ska kunna säljas över hela världen samt uppfylla den amerikanska standarden och europastandarden för lekredskap. Projektet inleddes med en förstudie och teori-fas, där bland annat litteraturstudie och konkurrentanalys genomfördes och annan information samlades in för att få djupare kunskaper inom ämnet. Därefter började idéer och koncept genereras, som sedan genomgick utvärderingar, så som användartester, vilket ledde till ett slutkoncept. Konceptet utvärderades med hjälp av bland annat hållfasthetsberäkningar och en antropometrisk analys. Den slutgiltiga vippgungan kan trots anpassningen för åldersgruppen, inte bara användas av 1-3-åringar utan också av äldre barn, tack vare att konstruktion och framförallt handtag ger extra lekvärden.
During the spring of 2013, Emilia Andersson, a student in product design engineering at University of Skövde, carried out a product development project in cooperation with HAGS Aneby AB. The aim of the project was to develop a seesaw adapted for children aged 1-3 years. The goal was to develop a seesaw that could be sold worldwide and meet the American standard and European standard for playground equipment. The project began with a pre study and a theory phase, which included literature review and competitor analysis and information were gathered to gain a deeper knowledge of the subject. Later on ideas and concepts were generated, which then through evaluations as user testing lead to a final concept. The concept was evaluated with for example strength calculations and an anthropometric analysis. The final seesaw can, despite adjustment for the age group, not only be use by 1-3-year-olds, but also by older children, this thanks to the design and the handles that provide extra play values.
APA, Harvard, Vancouver, ISO, and other styles
11

Cook, Rickey A. "A crane and heavy equipment maintenance plan for improving safety and efficiencey." Online version, 1999. http://www.uwstout.edu/lib/thesis/1999/1999cook.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

Caldera, Andrew L. "Out of the dragon's museum : motivations for PLA equipment modernization." Thesis, Monterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service, 1998. http://handle.dtic.mil/100.2/ADA349648.

Full text
Abstract:
Thesis (M.A. in National Security Affairs) Naval Postgraduate School, June 1998.
"June 1998." Thesis advisor(s): James J. Wirtz, Mary P. Callahan. Includes bibliographical references (p. 73-78). Also available online.
APA, Harvard, Vancouver, ISO, and other styles
13

Ferreira, Natalie. "Promoting Portuguese exports to Germany: an export promotion plan for the machinery & equipment sector." Master's thesis, NSBE - UNL, 2014. http://hdl.handle.net/10362/11864.

Full text
Abstract:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
This report presents the results of a work project conducted with the aim to develop a sector-specific export promotion plan for the Portuguese machinery and equipment (M&E) sector. The underlying analysis was based on the main export-related difficulties of M&E producers, requirements of German M&E buyers as well as on currently existing export support structures. The developed plan defines specific measures and activities related to distinct support topics that should ensure an appropriate preparation of companies seeking to enter the German market. Although the plan represents a general framework that can be applied to any M&E subsector, this report will focus on the application of this plan to the subsector of metal-working machinery and machine tools.
APA, Harvard, Vancouver, ISO, and other styles
14

Kashi, Mohsen Gholam-Reza. "A performance analysis of the hi-plan structural apparatus." Thesis, Virginia Polytechnic Institute and State University, 1985. http://hdl.handle.net/10919/50031.

Full text
Abstract:
Visual experience is a powerful pedagogic tool. Extensive use of experimental studies prior to design and construction has made conceptualization of complex structures possible. Experiments on reduced-scale structures and specimens are also vital tools for teaching structural mechanics. As such, the Department of Civil Engineering at Virginia Tech has acquired a new apparatus for use as an educational demonstration tool in the area of structural mechanics. This work presents the results of a detailed study on the performance of this device as related to its accuracy and operation. To fulfill such objectives, two structural models (a continuous beam and a portal frame) were extensively tested under several loading and support configurations. The models were analysed using STRUDL as well as a computer program developed by the author. The comparison of the results (deformations) obtained in the two phases of the study have indicated that the apparatus is reasonably accurate to meet the requirements of a structural teaching model and adapting to a variety of structural models.
Master of Science
incomplete_metadata
APA, Harvard, Vancouver, ISO, and other styles
15

Puntel, Luis. "Sampling Plan for Incoming Material Inspection at Sanden." Thesis, University of North Texas, 1995. https://digital.library.unt.edu/ark:/67531/metadc278774/.

Full text
Abstract:
Sanden international, an automobile air conditioning compressor manufacturer, was facing a problem in its incoming material inspection procedures. Although the company had designed and was using its own sampling plan, some managers and supervisors where not confident of its reliability. Sanden recently established a goal for its total number of defects per supplier as one part per million. Achievement of this target required reviews of the existing sampling plan. The purpose of this project was to help Sandra identify the best alternatives for its incoming material inspection procedures. To do that considerations were made about the usefulness of sampling inspections, theoretical aspects of inspection sampling plans were examined, current sampling plans were analyzed and recommendations were made.
APA, Harvard, Vancouver, ISO, and other styles
16

De, Wet Vorster Hendrik. "An analysis of the effectiveness of the asset maintenance plan at Spoornet : case study : class diesel locomotives (traction and rolling stock)." Thesis, Peninsula Technikon, 2001. http://hdl.handle.net/20.500.11838/1019.

Full text
Abstract:
Thesis (MTech (Business Administration))--Peninsula Technikon, 2001
Maintenance of locomotives is the main function of Bellville Locomotive Traction Depot in the Western Cape. Therefore, it is important to have a sound maintenance plan in place, to prevent a negative impact on the availability and reliability of locomotive supply for hauling power to train services. The purpose of the research is to determine the causes of the increased frequency of maintenance through a case study relating to 35-class locomotives. The abnormal increased frequency of wheel change and inter-bogie control repairs on 35-class diesel locomotives is investigated. A research survey was adopted, which included questionnaires and personal interviews based on the literature search. The target group is L&N section, which includes below-deck maintenance, overhaul and change out, repairs to locomotive bogies, frames, wheels, snubbers, inter-bogie control and traction motors. Sixteen people are responsible for all below-deck repairs and service of 52 locomotives. The results of the research will expose the shortcomings of the maintenance plan and propose solutions. This will be achieved by testing the effectiveness of the existing maintenance plan at Spoornet through the identification of the causes for the abnormal increase in wheel changes and inter-bogie control repairs on 35-class diesel locomotives. The outcome from this case study research will be to quantify the benefits arising from the effective application of a maintenance plan.
APA, Harvard, Vancouver, ISO, and other styles
17

Ramukhubathi, Collin. "A business plan for launching a material handling company - HELM solutions." Thesis, Stellenbosch : Stellenbosch University, 2014. http://hdl.handle.net/10019.1/96202.

Full text
Abstract:
Thesis (MBA)--Stellenbosch University, 2014.
ENGLISH ABSTRACT: Mobile lifter (ML) is a product that is used to lift loads or materials ranging from 20–600 kilograms (kg), and to move the loads to anywhere within the factory up to a height of 2.3 metres (m). The ML is ideal for loads heavier than human comfort, dangerous to touch by hands, requiring repetitive moving and not heavy enough for a forklift. As the need for labour rises and manufactures want to increase productivity, the ML becomes the solution. Currently, there is no company that specialises in ML, and that provides good service to the customers. HELM intends filling that gap in the markets. HELM plans to acquire exclusive distribution rights with a European base supplier of MLs. HELM will become the distributor of MLs in Southern Africa. HELM will have its base or office in Cape Town (CT), but also secure subcontractors in three other provinces, namely Gauteng, KwaZulu- Natal (KZN), and the Eastern Cape (EC). HELM will sell products from its supplier partner and it will offer services and a maintenance plan to its clients at a competitive rate. The ML can be used in manufacturing, wholesale, the retail trade and motor trade, and transport and storage. The three sectors account for over 35 percent of South Africa’s gross domestic product. The manufacturing sector is the largest sector with many industries. The most attractive industries are the fast moving consumer goods, automotive, pharmaceutical and chemical manufacturing industries. Although the industry or market is fragmented, Gauteng has the largest target market with over 9000 registered manufacturing enterprise. It is followed by KwaZulu-Natal, then the Western Cape and finally the Eastern Cape. The ML industry is still in its infancy, and HELM Solutions intend to sell 25 units in the first year, 33 in the second and then 36 in the third year. The current distributors of MLs only have one point of service per distributor in South Africa and MLs are non-core products for them. HELM also intends differentiating itself from other distributors by being a solution provider to clients, and not a product distributor. HELM wants to understand the clients’ business, understand their needs, and provide them with solution that will also increase their profit. This should give HELM a competitive advantage and make it difficult for clients to substitute the HELM products and service. Franck Tshilombo is one of the three entrepreneurs who will be directly involved in the business. He will start as the only employee of the business. He has been working with MLs for the past four years. His experience ranges from selling and marketing to ordering, assembling, service and maintenance of MLs. Kevin French brings experience in the financial field of investments. He holds a B Com degree and is a CFA charter holder. He has 25 years combined experience in financial services at large corporates and smaller entrepreneurial start-ups. He owns an investment management business and two paint distribution businesses. His experience includes starting new businesses, takeovers and turnarounds in financial services, and construction and electrical engineering. Collin Ramukhubathi who has a mechanical engineering degree and is an MBA candidate, has 15 years working experience in general management in construction and the mining sector. HELM Solutions require funding for fixed assets and working capital. The fixed asset will be funded by shareholders in the form of assets worth R30 000 and cash of R15 000. The amount of external funding required is R154 000. The desired funding should be in the form of an overdraft loan, as not all the funds will be needed in the beginning. This funding will be used towards the monthly expenses for the period of three months and towards increases in sales within the first five months. The funds will be needed during sales growth as the cash conversion cycle of the business is long. The overdraft loan is based on the interest rate of 12 percent. Based on these estimates, the loan will be fully repaid within 11 months.
APA, Harvard, Vancouver, ISO, and other styles
18

Chongwatpol, Jongsawas. "Analysis of waste electrical and electronic equipment (WEEE) in Thailand and implementation of risk management plan to comply with future WEEE regulations." Menomonie, WI : University of Wisconsin--Stout, 2004. http://www.uwstout.edu/lib/thesis/2004/2004chongwatpolj.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
19

Miller, Ondřej. "Podnikatelský plán pro nově vznikající výrobní společnost." Master's thesis, Vysoká škola ekonomická v Praze, 2015. http://www.nusl.cz/ntk/nusl-206370.

Full text
Abstract:
The aim of this thesis is to create a viable business plan for a new production company. This company will specialize in manufacturing swimming pool equipment that shall increase the standard of services provided by aqua-establishments. The target market is aqua-establishments (indoor swimming pools, hotel pools a spas) in Europe. The theoretical part deals with general principles of creating a business plan, presents potential users and characterizes its structure. The applied part introduces a specific business plan. Strong emphasis is given on description of competitive advantage, on marketing strategy and on financial plan. Financial plan includes evaluation of effectiveness of the project as well as evaluation of viability of the project.
APA, Harvard, Vancouver, ISO, and other styles
20

Xu, Zongying M. Eng Massachusetts Institute of Technology. "On-time delivery improvement at a semiconductor equipment manufacturing facility : developing robust work plan to improve resources utilization and shorten production cycle time/." Thesis, Massachusetts Institute of Technology, 2017. http://hdl.handle.net/1721.1/113729.

Full text
Abstract:
Thesis: M. Eng., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2017.
This electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.
Cataloged from student-submitted PDF version of thesis.
Includes bibliographical references (pages 119-120).
The boost of the need in semiconductor equipment has brought Varian, a giant in semiconductor manufacturer an increasing demand period. Unsatisfactory on-time delivery in the subassembly production in SMKT, however, has gradually become a critical issue that prevents the production from operating smoothly and efficiently as well as resulting in significant amount of extra financial costs. While the SMKT ontime delivery is generally improved from the two aspects, the material shortage issue and the capacity and priority issue, the second approach was focused, analyzed and well resolved in this thesis. Capacity analysis indicates that more manpower is needed to fulfill the production demand, and an analysis tool based on Excel was created to help with capacity management and planning in a long term. A series of matching algorithms was designed to solve the prioritization issue by providing efficient work plans that direct the production in SMKT assembly process, improving the SMKT on-time delivery by 10-20% and shortening the shop order cycle time in assembly process by one day. Moreover, recommendations on data utilization, capacity management and resources management in SMKT are provided accordingly to optimize the SMKT production to be more proficient and well-organized, which will greatly benefit Varian in the long term. The implementation of this algorithm generates no financial cost except for increasing the assembler's capacity, which indicates that all solutions provided in this thesis are economic and effective at the same time.
by Zongying Xu.
M. Eng.
APA, Harvard, Vancouver, ISO, and other styles
21

Peters, Marc. "Development of a project plan to enhance the import process for Clear Blue International." Thesis, Stellenbosch : Stellenbosch University, 2008. http://hdl.handle.net/10019.1/14910.

Full text
Abstract:
Thesis (MBA)--Stellenbosch University, 2008.
ENGLISH ABSTRACT: Clear Blue International (pty) Ltd (CBI) is a swimming pool construction company that is in need of a high performance swimming pool pump in order to offer a competitive tender for the construction of an intricate swimming pool at a prestigious resort. There is one supplier of this particular pump in South Africa and due to their sole distributorship and the pump's technical specifications, it is sold at a very expensive price. The result being that CBI can't offer a competitive tender by this means, instead they need to source the pump from another source at a lower price. It was decided to develop a project plan to facilitate the importation process, which is the outcome of this study. A thorough analysis of project management is conducted and incorporated into the importation process. The study takes into consideration the intricacy of the importation process and how this can be facilitated by project management that will lead to success for CBI. CBI recognises that in order to stand out in a highly competitive industry they need to re-invent themselves by new and innovative means in order to stand out from the rest. Project management has proven to be the means by which they can add value to their corporate image. This study provides a useful template that can be of benefit to other importers that wish to use project management and it can be adjusted accordingly to a particular commodity and importers requirements.
AFRIKAANSE OPSOMMING: Clear Blue International (Edms) Bpk (CBI) is 'n swembad konstruksie-maatskappy. Hulle benodig 'n hoe verrigting pomp met die oog op 'n mededingende tender vir die bou van 'n ingewikkelde swembad-konstruksie by 'n toonaangewende oord. Daar is huidiglik net een verskaffer van hierdie spesifieke pomp in Suid-Afrika en vanwee hulle alleen-verspreiding, plus die pomp se spesifieke tegniese spesifikasies, word dit teen 'n baie hoe prys verkoop. CBI kan tans nie 'n mededingende tender verskaf nie en wil daarom die pomp eers teen 'n laer prys vanuit 'n ander oord bekom. Die besluit was dus om 'n projek-plan te inisieer om die invoer-proses te vergemaklik, wat die resultaat van hierdie studie is. 'n Deeglike analise van projek bestuur is aangevoer en by die invoer-proses geinkorporeer. Hierdie studie neem ook die ingewikkeldheid van die invoer-proses in ag en hoe projek bestuur dit kan vergemaklik en sodoende kan bydra tot die sukses vir CBI. CBI besef dat, om uit te staan in 'n hoogs mededingende industrie, hulle hulself moet vernuwe op 'n innoverende wyse. Projek bestuur is bewys as die metode waarby hulle hul korporatiewe beeld kan verhoog. Die studie verskaf 'n waardevolle profielvorm waarby ander invoerders wat projek bestuur wil implementeer, ook kan baat vind. Dit kan aangepas word volgens spesifieke handelsartikels en invoer-voorskrifte.
APA, Harvard, Vancouver, ISO, and other styles
22

Kašpar, Michael. "Podnikatelský záměr." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2014. http://www.nusl.cz/ntk/nusl-224411.

Full text
Abstract:
This master‘s thesis is dealing to the draft business plan for the establishment of the company SportHC s.r.o., which will sell sports equipment through the shop and online store. I will write the thesis in three parts. The first part will focus on the theoretical solutions of work suitable for the business plan, in the second the analysis part i will focus on the analysis of the external and internal surroundings of the company and in the third the practical part I will try to present findings from the parts theoretical nad analysis into a viable business plan.
APA, Harvard, Vancouver, ISO, and other styles
23

Žabenský, Zbyněk. "Podnikatelský záměr." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2016. http://www.nusl.cz/ntk/nusl-224802.

Full text
Abstract:
The diploma thesis contains the business plan study for increase of the production effectiveness via improvement of Overall Equipment Effectiveness. It contains technical description, process description of the change and its financial evaluation. The thesis focuses on specification of the term Overall Equipment Effectiveness and its clarification for use in production company producing electronic devices. It contains real company example.
APA, Harvard, Vancouver, ISO, and other styles
24

Huaman, Cordova Diego Pedro. "Propuesta de un plan de mantenimiento preventivo basado en los indicadores Overall Equipment Efficiency para la reducción de los costos de producción en la empresa KAR & MA S.A.C." Bachelor's thesis, Universidad Católica Santo Toribio de Mogrovejo, 2020. http://hdl.handle.net/20.500.12423/2760.

Full text
Abstract:
El presente proyecto se centra en la empresa Kar & Ma S.A.C. dedicada a la producción de sal yodada para el consumo humano y posterior comercialización principalmente a la selva y sierra del país. Dentro de sus 2 líneas de producción y 10 principales productos el de mayor demanda y producción es el de la marca Salina de ½ kg que se procesa en la línea de sal seca, por lo que nos centraremos en ésta para el desarrollo de la propuesta. En el área de producción se presentan continuamente fallas en los equipos, principalmente en la línea seca debido a un inadecuado sistema de mantenimiento que ocasiona pérdidas económicas por reparaciones, mano de obra, así como dinero no percibido por sacos no producidos, recalcando además que el tiempo de vida útil de las máquinas es menor, teniendo éste un impacto económico a largo plazo. Para la ejecución de ésta investigación se diagnosticó la situación actual de la empresa y se planteó la propuesta de un plan de mantenimiento preventivo basado en indicadores OEE, para ello se realizó un listado de los equipos en la línea de sal seca, codificación y ficha técnica de los mismos, luego se procedió a determinar las horas de falla de las máquinas para determinar las más críticas mediante el diagrama de Pareto, posteriormente se determinó sus medidas preventivas analizando su falla funcional (problema) y modo de fallo (causa), por último se evaluó el plan de mantenimiento preventivo propuesto mediante el indicador OEE comparando los indicadores actuales y los propuestos. De acuerdo a la implementación del plan de mantenimiento preventivo el indicador OEE aumentó de 55,8% a 91,08% en el mes de enero, de 37,26% a 89,70% en el mes de febrero, de 34,8% a 91,33% en el mes de marzo, de 32,45% a 87,60 en el mes de abril, de 40,08% a 92,82% en el mes de mayo y finalmente de 49,94% a 91,77% en el mes de junio. En otras palabras, tenemos una aumentó del 35,27% en el mes de enero, de 52,43% en el mes de febrero, de 56,48% en el mes de marzo, de 55,14% en el mes de abril, de 52,83 en el mes de mayo y por último de 41,83 en el mes de junio. Finalmente se elaboró un análisis costo-beneficio del plan de mantenimiento preventivo donde se concluyó que el proyecto tendrá una inversión de 27 815,7, un costo beneficio de 1,9 soles y un periodo de recuperación de 6 meses y 24 días siendo un proyecto viable y rentable para la empresa.
APA, Harvard, Vancouver, ISO, and other styles
25

Bussola, Bruno Vicentini. "Complexo ecológico ambiental de Catalão: implementação e territorialização dos parques na malha urbana." Universidade Federal de Goiás, 2018. http://repositorio.bc.ufg.br/tede/handle/tede/8489.

Full text
Abstract:
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2018-05-17T12:30:47Z No. of bitstreams: 2 Dissertação - Bruno Vicentini Bussola - 2018.pdf: 6780100 bytes, checksum: ff3364f863d2c784948266f9eae86c52 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2018-05-17T13:07:36Z (GMT) No. of bitstreams: 2 Dissertação - Bruno Vicentini Bussola - 2018.pdf: 6780100 bytes, checksum: ff3364f863d2c784948266f9eae86c52 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Made available in DSpace on 2018-05-17T13:07:36Z (GMT). No. of bitstreams: 2 Dissertação - Bruno Vicentini Bussola - 2018.pdf: 6780100 bytes, checksum: ff3364f863d2c784948266f9eae86c52 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2018-03-28
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES
The thesis entitled "Ecological Environmental Complex of Catalão: implementation and territorialization of parks in the urban network" had as general objective to analyze the implementation of urban parks from the 2004 and 2016 Catalão Master Plans. In the first chapter we did a theoretical review of the concept of territory, power, urban planning and urban parks. In the second chapter the objective was to map the distribution of the urban parks of Catalão (GO), identifying their landscape contents and their infrastructure equipment, through field work. The third chapter aimed to understand the implementation of public policies for urban planning in Catalão (GO) proposed from 2004 to 2016, regarding the creation and maintenance of urban parks. Finally, we conclude that urban equipment was distributed in urban space in an irregular manner due to several factors of both natural and social order and questionable management during the period studied.
A Dissertação intitulada “Complexo Ecológico Ambiental de Catalão: implementação e territorialização dos parques na malha urbana” teve como objetivo geral analisar a implementação dos parques urbanos a partir dos planos diretores de Catalão 2004 e 2016. No primeiro capítulo fizemos uma revisão teórica dos conceito de território, poder, planejamento urbano e parques urbanos. No segundo capítulo o objetivo foi mapear a distribuição dos parques urbanos de Catalão (GO), identificando seus conteúdos paisagísticos e seus equipamentos de infraestrutura, através de trabalho de campo. O terceiro capítulo teve como objetivo compreender a implementação das políticas públicas de planejamento urbano de Catalão (GO) propostas no período de 2004 a 2016, referentes a criação e manutenção do parques urbanos. Por fim chegamos a conclusão que os equipamentos urbanos foram distribuídos no espaço urbano de forma irregular devido a vários fatores tanto de ordem natural, quanto de ordem social, e pelas gestões questionáveis no período estudado.
APA, Harvard, Vancouver, ISO, and other styles
26

Havránek, Martin. "Podnikatelský plán založení internetového obchodu se sportovní výživou a cvičebními pomůckami." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2016. http://www.nusl.cz/ntk/nusl-254269.

Full text
Abstract:
The main goal of this thesis is design plan for e-shop focused on sport supplements and equipment. Main parts of this labor, which will be used as basis for design of business plan, are selected analysis of environment for setting up demand and circumstances connected with them. Following step will be to chart competitive environment of segment of market, for this step we will use data from main research. This research discovering targeted customer´s preferences. Suggestions mentioned in this thesis will be use as support for realization of this business plan.
APA, Harvard, Vancouver, ISO, and other styles
27

Patrný, Jan. "Stavebně technologický projekt výrobní haly v Litomyšli." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240170.

Full text
Abstract:
This thesis consists of a technological project of the production hall realization in Litomyšl. The main part of the project is a building schedule and a financial plan of the construction itself. Moreover thesis consists of a building site equipment design, construction machinery needed for building and a workplace safety plan. The process of selected realization parts are described in the technological manual and the quality control and inspection plan.
APA, Harvard, Vancouver, ISO, and other styles
28

Mlynár, Peter. "Řízení stavební zakázky ve stavebním podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372078.

Full text
Abstract:
This thesis deals with managing construction order in the construction company. The aim of thesis is to describe the process of preparation and execution of a construction. The theoretical part describes and explains basic concepts of project planning, then these concepts are applied to production of constructions. The practical part is based on my preparation of construction documentation on the construction project “Extension of production hall in Martin”.
APA, Harvard, Vancouver, ISO, and other styles
29

Stopka, Peter. "Stavebně technologický projekt výstavby centrální nabíjecí stanice v Púchově." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391912.

Full text
Abstract:
This diploma thesis focuses on the construction of a construction technological project for the construction of the Central Charging Station in Púchov. The building is located in the industrial area of Púchov and in the area of Continental Matador Rubber. In the thesis is elaborated technical report for building technological project, co-ordination situation of construction with wider transport routes, time and financial object plan, study of the realization of the main technological stages, construction site design, design of main building machines and mechanisms, time schedule of main building, securing material resources for the monolithic part of the building. In the thesis are made, technological rules for drilled pilots and ceiling structure above the first overground floor. Technological regulations follow control and test plans. Other assignments that have been made in this work, such as the occupational safety and health plan, the design and comparison of cranes and the item budget.
APA, Harvard, Vancouver, ISO, and other styles
30

Bartošová, Zlata. "Stavebně technologický projekt pro Domov seniorů." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225382.

Full text
Abstract:
This thesis deals with the technological solution building construction project seniors home in Prague. Contains a technical report, technical regulations for monolithic and brick structures, which are documented inspection and test plans, as well as time and financial plans and project construction site.
APA, Harvard, Vancouver, ISO, and other styles
31

Bajerová, Marie. "Stavebně technologický projekt hotelu Chopin v Bratislavě." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371866.

Full text
Abstract:
This final thesis is focused on technological project Hotel Chopin in Bratislava. The technological project deals with the planning of the entire construction and focuses on the design of the site equipment, time plan of the building development and the detailed time plan of the building structure. Further focuses on the construction cast-in-place reinforced concrete structures. It prepares the technological prescription for cast-in place reinforced structures, inspection and test plan and the plan of safety risks and measures. Part of the project is also the construction budget and the mechanical assembly plan.
APA, Harvard, Vancouver, ISO, and other styles
32

Veselý, Martin. "Příprava realizace výrobního a administrativního objektu v Moravanech." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392183.

Full text
Abstract:
The diploma thesis deals with the elaboration of a building-technological project for the construction of a hall in Moravany u Brna. The work includes comprehensive studies of implementation including timetable, financial plans and technological regulations. It also deals with the design of the main building mechanisms, building equipment, control and test plan. There are also three drawings of the construction site equipment for the implementation stages.
APA, Harvard, Vancouver, ISO, and other styles
33

Gabčová, Kateřina. "Bytové domy Lípa v Hodoníně - stavebně technologická příprava výstavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227008.

Full text
Abstract:
The technological project for the realization of the Apartment buildings Lípa in Hodonín includes a technical report, the preparation and construction site equipment, the time schedule and financial plan, the project budget, the technological prescription, the control and test plan, the health and safety plan, the plan of risks and prevention.
APA, Harvard, Vancouver, ISO, and other styles
34

Hlušičková, Lenka. "Bytový dům Brno,Vídeňská- příprava a realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226492.

Full text
Abstract:
This Master’s thesis deals with the technological project of the new building apartment house in Brno. This work includes technical reports, site equipment, wider transport relations,budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work, safety plan and risks on the building.
APA, Harvard, Vancouver, ISO, and other styles
35

Gaďurek, Robin. "Administrativní centrum Hodonín - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240463.

Full text
Abstract:
The content of the thesis is the implementation of the three-story brick office building with an operation in Hodonin. Text section contains the technical report on the structural and technological project technical report transport relations, study implementation of major technological stages of building SO 01, project construction site, the design of the main building machines and mechanisms, technological regulation, inspection and test plan and a plan of safety and health at work for making the 1st floor ceiling structure. The appendix section includes drawings and installations situation Minor main building structure, calculation of stripping reinforced concrete structures, timing and technology standard of the main building structure and time and financial plan construction-object.
APA, Harvard, Vancouver, ISO, and other styles
36

Lupač, David. "Distribuční sklady v Praze - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265317.

Full text
Abstract:
The subject of this thesis is the construction and technological project for distribution warehouses in Prague. Textual part contains a technical report on construction technology project, wider relations of traffic routes with marked critical points, the study of the main technological stages of the building, principles of organization of construction, design of the main building machines and mechanisms, technological regulations, inspection and test plans, health and safety on the site. In the section with attachments there is a map of the locality, drawings of site facilities, including road signs, charts of the movement of machines, the schedule of the main building structure, the budget of the main building structure, a plan for securing material resources, time and financial plan, an economic evaluation of site facilities, details and other technical documentation stages.
APA, Harvard, Vancouver, ISO, and other styles
37

Krasnovský, Jiří. "Návštěvnické centrum Mikulčice - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240418.

Full text
Abstract:
The subject of this diploma thesis is the construction technological project of visitor center in Mikulčice. This thesis contains a technical report, project of site equipment with technical report, time and financial plan of the building, study for the realization of major technology stages, design of assembly machines, budget of object, technological specification of steel structure and COR-TEN cladding with inspection and test plans.
APA, Harvard, Vancouver, ISO, and other styles
38

Jedličková, Alena. "Stavebně technologický projekt bytového domu v Miroslavi." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372132.

Full text
Abstract:
In this thesis there are main parts of the building and technological project of The apartment building Miroslav. There is technical report on on the technological project, studies of major technological stages, site equipment project, design of building machines and mechanisms, time plan, inspections and test plan.
APA, Harvard, Vancouver, ISO, and other styles
39

Ratajský, Radek. "Dům s pečovatelskou službou v Těmicích, příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392052.

Full text
Abstract:
The subject of this thesis is a preparation of documentation for the construction of the nursing home in Těmice. The work contains budget, schedule, financial plan, construction technological project, technological regulation for trussing construction, inspection and test plan, material resources plan, construction machinery and a safety plan.
APA, Harvard, Vancouver, ISO, and other styles
40

Dvořáček, Tomáš. "Podnikatelský plán pro založení maloobchodní prodejny." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2010. http://www.nusl.cz/ntk/nusl-222532.

Full text
Abstract:
The master’s thesis is the proposal of the business plan for the company targeted on the business with floorball equipment. The firm will be established as a limited liability company, which will be situated in Pardubice. The thesis consists of several parts, where you can find the presumptions of the enterprise success, calculation of the future sales and proposal of the steps for the firm realization.
APA, Harvard, Vancouver, ISO, and other styles
41

Pospíšil, Tomáš. "Hasičská zbrojnice - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392195.

Full text
Abstract:
This diploma thesis solves the construction and technological project of the Fire Brigade and the municipal office. The building is located in Martinique near Velké Meziříčí. The thesis deals with the study of the realization of the building, the technical report on the construction technological project, the time and financial plan of the building objects. The design of the building site equipment, the design of the machine assembly, the time machine deployment on the given technological stage and the balance of the workers are elaborated. This diploma thesis also focuses on the technological regulation of the roof structure design, the control and test plan and the risk assessment and the implementation of roofs. Part of the work is an item budget of the building and a detailed timetable.
APA, Harvard, Vancouver, ISO, and other styles
42

Brychta, Ondřej. "Pension ve Špindlerově Mlýně - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371867.

Full text
Abstract:
THE OBJECTIVE OF THIS DIPLOMA WORK IS THE BUILDING-TECHNOLOGICAL PROJECT OF THE PENSION IN SPINDLER MILL. DIPLOMA WORK REALIZING GROWING LOWER BUILDINGS AND GROSS TOP STAYS OF THE PENSION OBJECT. DETAILS ARE DETAILED FOR THE MOST DEMANDED DESIGN OF MACHINERY, BUDGET BUDGET, TIME SCHEME, CONTROL AND TEST PLANS, BUILDING EQUIPMENT, DESIGNATION OF MOVING MECHANISM AND WIDER RELATIONSHIPS. THE DIPLOMA WORK IS PROCESSED ON THE BASIS OF THE TECHNICAL SIGNS PROVIDED BY THE PROJECTANT
APA, Harvard, Vancouver, ISO, and other styles
43

Schauer, Martin. "Stavebně technologický projekt bytového domu Meandr v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227445.

Full text
Abstract:
This diploma thesis deals with the construction technological project of block of flats residence Meandr in Brno - Komín. On the given topic are processed and all necessary supporting documents that enhances the clarity and orientation in matters large building for the preparation of the construction process. Given the scale, complexity and location of the building is structurally location technology project addresses the only earthworks and construction site of the main building object SO-01 only. Furthermore, nine small objects that are closely tied this main object within the premises of a residential building. Between integral part of this work include the project site facilities including a time of economic evaluation studies of major technological stages realization, design of main machinery and mechanisms itemized budgets volume of important buildings and budgets by THU volume, less important objects, further technological specification for the implementation of monolithic concrete construction as this topic linked inspection and test plan, risk and crisis measures. For the entire building housing residence is prepared detailed timetable and a lot of additional documents.
APA, Harvard, Vancouver, ISO, and other styles
44

Pivoňka, Josef. "Hala společnosti SAND TEAM Holubice - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226482.

Full text
Abstract:
This thesis concerns preparation and organization of an additional building to an industrial hall belonging to SAND TEAM company in Holubice which specialises in material forming research.Thesis focusses on technological realization plan of the building object.Description of other construction objects is included.
APA, Harvard, Vancouver, ISO, and other styles
45

Polách, Miroslav. "Logistické centrum odpadů - příprava a organizace výstavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226496.

Full text
Abstract:
This thesis deals with the preparation and organization of construction of Logistic center of waste for processing biologically decomposable waste in Vsetín. It is focused mostly on technological procedure of realization of main building object, based on the budget, the progress chart, the technological instructions and the inspecting and test plan. The thesis also contains a description of other objels with time and financial planning. It is designed and described the construction site equipment, the composition of machinery for construction and the design of the supply of material resources.
APA, Harvard, Vancouver, ISO, and other styles
46

Fňukal, Radek. "Stavebně technologický projekt výrobní haly v Bystřici nad Pernštejnem." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409920.

Full text
Abstract:
This diploma thesis is dealing with a construction-technological project of a production hall in Bystřice nad Pernštejnem. The main subject of the thesis is a technological report, a realization study of the main technological phases, a coordination situation of the construction with broader relations to transport routes, a project of the office building site equipment, a suggested list of the main construction vehicles, a time plan for the main building objects, technological prescriptions for a prefabricated skeleton and bored piles and documents related to this.
APA, Harvard, Vancouver, ISO, and other styles
47

Dvořák, Tomáš. "Novostavba administrativní budovy a školícího střediska v Humpolci - příprava realizace a řízení stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227174.

Full text
Abstract:
The diploma thesis deals with the constructive-technological project of the administrative building in Humpolec.This project mainly addressed construction by the building structures, site equipment, implementation of cast-in-place reinforced concrete floor, budget and chronological plan of buildings. The work was based on the project for implementation.
APA, Harvard, Vancouver, ISO, and other styles
48

Patloka, Jiří. "Stavebně technologický projekt přístavby administrativně výrobního objektu v Kroměříži." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265643.

Full text
Abstract:
The thesis contains the main part of the building and technological project of outbuildings it manufacturing facility. There is prepared a technical report on the structural and technological project, situation with broder relations roadways, time and financial plan, studies the implementation of major technological stages, project construction site, design of building machines and mechanisms, plan for securing materiál resources, technological regulation for warm flat roof and saddle truss roof, inspection and test plans, budget and health and safety at the technological stage roofed.
APA, Harvard, Vancouver, ISO, and other styles
49

Marusic, Tibor. "Ray Cast/Dose Superposition algorithm for proton grid therapy." Thesis, Stockholms universitet, Medicinsk strålningsfysik (tills m KI), 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:su:diva-148174.

Full text
Abstract:
Purpose: To develop a Ray Cast/Dose Superposition (RC/DS) algorithm for proton grid therapy. Its functionality needed to include automatic positioning of small proton pencil beams in a grid-pattern and superimposing thin beam Monte Carlo (MC) dose distribution data on a Computer Tomography (CT) density volume. The purpose was to calculate and store un-weighted volumetric dose distributions of individual proton energies for subsequent optimization. Materials & Methods: Using the programming language Python 3.6, CT and Volume Of Interest (VOI) data of various patients and phantoms were imported. The target VOI was projected to either two or four planes, corresponding to the number of used gantry positions. Rays were then traced through the CT voxels, which were converted from Hounseld Units to density using a look up table, to calculate Water Equivalent Distance and proton energy needed to reach the proximal and distal edge of the target volume. With automated grid-pattern beam positioning, thin beam MC calculated depth dose distribution files were interpolated, scaled and superimposed on the CT volume for all beamlet positions. The algorithm reliability was tested on several CT image sets, the proton range estimation compared to a commercial TPS and the depth dose interpolation analyzed using MC simulations. Results: The RC/DS algorithm computation time was on average around 6 hours and 30 minutes for each CT set. The dose distribution output visually conformed to target locations and maintained a grid pattern for all tested CT sets. It gave unwanted dose artifacts in situations when rays outside the beamlet center passed a significant length of low/high density regions compared to the center, which yielded dose distributions of unlikely shape. Interpolating MC dose distribution values showed comparability to true MC references of same energy, yielding results with 0.5% difference in relative range and dose. Conclusions: The developed algorithm provides unweighted dose distributions specific for small beam proton grid therapy and has been shown to work for various setups and CT data. Un-optimized code caused longer computation times then intended but was presumed faster than MC simulations of the same setup. Efficiency and accuracy improvements are planed for in future work.
Proton grid therapy group
APA, Harvard, Vancouver, ISO, and other styles
50

Hetteš, Adrián. "Průmyslová hala Moravany - vybrané části stavebně technologického projektu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392090.

Full text
Abstract:
The aim of this diploma thesis is the preparation of a constructional-technology study into the realization of carcass industry hall in the village Moravany u Brna. An itemized budget has been created for the framework alongside a proposal for the main building mechanisms, time management, health and safety plan and environmental management. The thesis is focused on detailed realization of the precast concrete frame which outlines technological regulation and inspection and a trial plan. The thesis further deals with site equipment, possible public transport routes into specific areas and how the main technological stages are developed. In creation of this thesis were used constructional-technological softwares BuildPowerS, CONTEC, ArchiCAD, AutoTurn, Vehicle Tracking and Hluk+9.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography