Academic literature on the topic 'JIT leverans'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'JIT leverans.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "JIT leverans"
Maiga, Adam S., and Fred A. Jacobs. "Assessing JIT Performance: An Econometric Approach." Journal of Management Accounting Research 20, s1 (January 1, 2008): 47–59. http://dx.doi.org/10.2308/jmar.2008.20.s-1.47.
Full textZyngier, Suzanne, and Frada Burstein. "Knowledge Management Governance: The Road to Continuous Benefits Realization." Journal of Information Technology 27, no. 2 (June 2012): 140–55. http://dx.doi.org/10.1057/jit.2011.31.
Full textTrisnawati, Rina, Mardayaningrum Mardayaningrum, and Laillatul Khotimah. "DETERMINAN MANAJEMEN LABA AKRUAL PADA INDEKS LQ45 DAN JII PERIODE 2010-2015." Riset Akuntansi dan Keuangan Indonesia 3, no. 2 (October 13, 2018): 141–51. http://dx.doi.org/10.23917/reaksi.v3i2.6702.
Full textLempinen, Heikki, and Risto Rajala. "Exploring Multi-Actor Value Creation in IT Service Processes." Journal of Information Technology 29, no. 2 (June 2014): 170–85. http://dx.doi.org/10.1057/jit.2014.1.
Full textSusanti, Reni, and Imanda Firmantyas Putri Pertiwi. "The role of ISR disclosure as moderator the relationship between profitability and leverage towards corporate value." Indonesian Journal of Islamic Economics Research 1, no. 2 (November 26, 2019): 58–66. http://dx.doi.org/10.18326/ijier.v1i2.3044.
Full textLuftman, Jerry, Kalle Lyytinen, and Tal ben Zvi. "Enhancing the measurement of information technology (IT) business alignment and its influence on company performance." Journal of Information Technology 32, no. 1 (March 2017): 26–46. http://dx.doi.org/10.1057/jit.2015.23.
Full textHoxhaj, Valmira, and Ravindra Khattree. "Same Leverage, Less Volatility: An Alternative Approach to the Construction of Leveraged Funds." Journal of Index Investing 7, no. 3 (November 30, 2016): 75–94. http://dx.doi.org/10.3905/jii.2016.7.3.075.
Full textMatar, N. "God's Crucible: Islam and the Making of Europe, 570-1215 * By DAVID LEVERING LEWIS." Journal of Islamic Studies 21, no. 3 (September 1, 2010): 424–26. http://dx.doi.org/10.1093/jis/etq027.
Full textPevná, Jana. "Capital structure of COOP group in the Czech Republic." Trendy v podnikání 11, no. 1 (2021): 30–40. http://dx.doi.org/10.24132/jbt.2021.11.1.30_40.
Full textJannatun, Aghlul, and Yuli Chomsatu. "Pengaruh Profitabilitas, Kebijakan Hutang, Degree Of Operating Leverage Terhadap Nilai Perusahaan." JAD: Jurnal Riset Akuntansi & Keuangan Dewantara 2, no. 1 (June 27, 2019): 43–52. http://dx.doi.org/10.26533/jad.v2i1.359.
Full textDissertations / Theses on the topic "JIT leverans"
Thelfer, Martin, and Chun-Bond Wu. "Rationell materialpåfyllnad : Utredning för leverans från hubb till monteringsstation." Thesis, Mälardalen University, Department of Innovation, Design and Product Development, 2007. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-346.
Full textEricsson AB har en produktionsenhet i Gävle (Sverige), CDC Gävle. Denna enhet är indelad i två fabriker, Skolgången och Avaström. På Skolgången monteras WCDMA radiobasstationer (3G) och på Avaström GSM radiobasstationer (2G).
CDC Gävle har idag ett stort returflöde av emballage från inkommande monteringsmaterial. Det förekommer också många störningar i materialförsörjningen till monteringen. CDC Gävle har beslutat att på sikt ska allt material som idag finns på lager befinna sig på hubbar.
Syftet med examensarbetet var att undersöka påfyllnaden av monteringsmaterial till linan. Påfyllnad skulle ske direkt mot linan. Resultatet av arbetet blev en teoretisk försörjningsmodell som byggde på att materialet kom från hubbar. Försörjningsmodellen skulle ta hänsyn till nuvarande systemlandskap samt att det skulle ske på ett så kostnads- och utrymmeseffektivt sätt som möjligt. Den skulle också se över problemen med emballage och störningarna i materialflödet.
Arbetet skulle besvara följande centrala frågor:
• Hur bör materialet fördelas på hubbarna?
• Vilka lastbärare är lämpliga vid levereras till linan?
• Vilka förändringar kan komma att krävas av befintliga system, arbetsmetodik samt vilka krav ska ställas?
• Var och hur bör omplock av material ske?
• Hur kommer materialflödet att se ut från hubb till monteringslina?
Arbetet har bedrivits genom datainsamling på CDC Gävles olika anläggningar. Det genomfördes även ett flertalet studiebesök för att se hur andra producerande företag arbetade med liknande frågor. Under arbetsgången har det skett kontinuerliga litteraturstudier.
Författarna belyste och tog fram ett flertal parametrar som anses avgörande vid utformningen av en ny försörjningsmodell. CDC Gävle måste besluta hur dessa parametrar ska lösas innan en fullständig implementering av hubbar kan börja. Arbetet resulterade i en försörjningsmodell som är generell för både WCDMA och GSM. Arbetet tar också upp hur hubben bör arbeta, vilka funktioner den ska innehålla samt vart den bör lokaliseras. Vidare rekommenderas lämpliga lastbärare och vilka arbetssätt som är lämpliga för CDC Gävle.
Ett av de största problemen i arbetet var att ta hänsyn till de speciella materialflödena som CDC Gävle har, detta gällde bl a reklamation och enhetspackade artiklar. Den centrala parametern i hela försörjningsmodellen var frystiden. Frystiden är den tidsperiod från att kunden inte kan ändra sin order till ordern startas på monteringen. Om det inte existerar någon frystid kommer inte hubben hinna plocka fram och leverera det material som CDC Gävle behöver.
Författarna bedömer att det finns goda möjligheter att flytta befintliga lager till hubbar. Det bör dock genomföras ett flertal piloter med olika sorters material innan man går vidare.
Ericsson AB has a production unit in Gävle (Sweden), CDC Gävle. The unit is divided into two facilities, Skolgången and Avaström. WCDMA (3G) Radio Base Stations are assembled at Skolgången and GSM (2G) Radio Base Stations are assembled at Avaström.
Today CDC Gävle has a major return flow of packing from received assembly material. There also exist several disruptions in the material supply to the assembly. CDC Gävle has decided that in the long term all material, which today is stored in the warehouse, will be stored in hubs.
The purpose of the thesis work was to investigate the replenishment of material to the line. Replenishment was to be made directly to line. The result of the thesis work became a theoretical supply model that was based on the material arriving from hubs. The supply model had to consider the present system environment and also be as cost and area efficient as possible. It was also supposed to look at the problems with packing and disruptions within the material flow.
The thesis work was to answer the following essential questions:
• How should the material be allocated to the hubs?
• Which load-carriers are appropriate on delivery to the line?
• What changes could be required of the present systems, working methods and also what requirements are to be made?
• Where and how should the re-arrangement of material be done?
• What will the material flow look like from hub to assembly line?
The thesis work has been carried out by the collection of data at CDC Gävle’s different facilities. Several study visits were conducted to see how other producing companies worked with similar questions. During the work process there have been continuous literature studies.
The authors elucidated and compiled several parameters, which were considered crucial in the design of a new supply model. CDC Gävle must decide how these parameters will be solved before a full-scale implementation of hubs can begin. The result of the thesis work was a supply model, which is common to both WCDMA and GSM. The thesis work also covers how the hub should work, which functions it will contain and where it should be located. Further, more suitable load-carriers and ways of working for CDC Gävle are recommended.
One of the biggest problems was to take into consideration of the special material flows, which CDC Gävle has; amongst those concerned were the claims flow and the unit-packed articles. The essential parameter in the whole supply model was the frozen horizon. The frozen horizon is the time period from when a customer cannot change the order to when the order is started in the assembly. If there is no frozen horizon, the hub will not have enough time to take out and deliver the material, that CDC Gävle need. The authors’ opinion is that there are good possibilities of moving the present warehouse to hubs. However several pilots should be conducted with different kinds of materials before any further step is taken.
Jaralla, Mustafa, and Malek Saliba. "Ökad hållbarhet och minskad miljöpåverkan inom bygglogistik : Studie av TMS på Cramo." Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-257741.
Full textIn the construction industry, there is a general industry problem that can be described by the term poor advance planning. This makes it difficult to see the construction logistics in a holistic perspective, both for the supplier and the contractor, but unfortunately also for other parties involved in construction production projects. Achieving good building logistics with consideration for the environment requires good cooperation between all parties. Building logistics is planning several (many) weeks ahead, in the construction industry it is common that unexpected events arise that lead to adjusting timetables for different parts of the construction project. At present, it is a little too often that adjustments are made "at the last minute". This leads to more expensive freight, difficulties in coping with a good delivery precision, which in turn negatively affects the efficiency of construction logistics. Problems that has been discovered for the different parts of the process within building logistics in CRAMO are presented with solutions, recommendation of efficiency/improvement for building logistics under the title problem inventory,”problem inventering”. In problem inventory, these are described while action proposals are presented later in the report during the analysis. For this work, the facts have included the methods in lean construction as JIT- Just in time and comparisons between various additional services used in the construction industry today. Facts about the communication system, TMS, and the doctrine of transport and material handling have also been investigated and analyzed. Facts from the interviews that describe TMS, transport methods and solutions as well as how material handling takes place and what one has for goals in the future have been reported in the background, the result and in the analysis. Building logistics is briefly a term for all activities that lead to the right product being in the right place at the right time. "Think ahead" (Sundin, 2019)
Jansson, Hanna, and Evelina Villgren. "Total cost analysis of different delivery methods of plasterboards." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-177397.
Full textExamensarbetet är utfört vid Institutionen för teknik och naturvetenskap (ITN) vid Tekniska fakulteten, Linköpings universitet
Dahlén, Anna, and Angelica Öhman. "OPTIMERING AV LEVERANSER OCH LAGERHÅLLNING FÖR SKANSKA : En komparativ studie av lagerhållning och JIT-leveranser samt en utredning av optimal materialplacering på lager." Thesis, Umeå universitet, Institutionen för matematik och matematisk statistik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-159805.
Full textFor every new construction project, a new organisation is created. It is therefore a challenge for the construction industry to create standardized logistic processes. In addition, different construction projects have different traits, which results in further challenges for improvement efforts for the construction logistic processes. In 2017 Skanska Väg och Anläggning Norr did the reconstruction of Vasaplan in the central of Umeå, and in September 2018 the reconstruction project was done. The reconstruction was in its entirety a very successful project, however when the project was finished problems regarding material supply were identified. The aim of this paper is to analyze how deliveries to a construction site can be optimized and whether storage spaces can aid in the handling of deliveries to the construction site. A comparison has been made between storing material and using JIT-deliveries. The hope is to help Skanska in developing a more standardized approach when it comes to planning the deliveries of materials that has similar storage and transport conditions as the slabs of granite used. To solve this two mathematical models have been used; Facility location problem and a mathematical model that optimizes the placement of materials in a storage space. Two production flow models, JIT and EOQ, were also used when performing the calculations. The result from the production flow models, JIT and EOQ, show that JIT deliveries are always the most cost effective solution when storage space is a direct cost for Skanska, when used together with a logistics center. However, when storing is no extra expense for Skanska, the mathematical model for the Facility location problem suggests a optimal use of the storage spaces that are available.
Books on the topic "JIT leverans"
Stein, Max. Jiu Jitsu, A Superior Leverage Force: Muscle Science Tricks Of Jiu-Jitsu. Kessinger Publishing, LLC, 2007.
Find full textHorne, Gerald. The Jim Crow Paradox. University of Illinois Press, 2018. http://dx.doi.org/10.5406/illinois/9780252041198.003.0012.
Full textBook chapters on the topic "JIT leverans"
Jett, Brandon T. "“Many People ‘Colored’ Have Come to the Homicide Office”." In Crime and Punishment in the Jim Crow South, 34–57. University of Illinois Press, 2019. http://dx.doi.org/10.5622/illinois/9780252042409.003.0002.
Full textConference papers on the topic "JIT leverans"
Pannier, Christopher P., Kira Barton, David Hoelzle, and Zhi Wang. "A Model of Liquid-Drop Spreading for Electrohydrodynamic Jet Printing." In ASME 2015 Dynamic Systems and Control Conference. American Society of Mechanical Engineers, 2015. http://dx.doi.org/10.1115/dscc2015-9995.
Full textLopez, Diego I., Tiziano Ghisu, and Shahrokh Shahpar. "Global Optimisation of a Transonic Fan Blade Through AI-Enabled Active Subspaces." In ASME Turbo Expo 2021: Turbomachinery Technical Conference and Exposition. American Society of Mechanical Engineers, 2021. http://dx.doi.org/10.1115/gt2021-59166.
Full textBeheshti, Behnam H., Joao A. Teixeira, Paul C. Ivey, Kaveh Ghorbanian, and Bijan Farhanieh. "Parametric Study of Tip Clearance – Casing Treatment on Performance and Stability of a Transonic Axial Compressor." In ASME Turbo Expo 2004: Power for Land, Sea, and Air. ASMEDC, 2004. http://dx.doi.org/10.1115/gt2004-53390.
Full textPapadopoulos, George, Daniel Kearney, and Daniele Torresin. "Evaluation of an Integrated Micro-Cooling Chip Architecture for Managing Thermal Concerns of a Power Electronics Module." In ASME 2017 Fluids Engineering Division Summer Meeting. American Society of Mechanical Engineers, 2017. http://dx.doi.org/10.1115/fedsm2017-69519.
Full textKolkman, H. J., G. A. Kool, and R. J. H. Wanhill. "Aircraft Crash Caused by Stress Corrosion Cracking." In ASME 1994 International Gas Turbine and Aeroengine Congress and Exposition. American Society of Mechanical Engineers, 1994. http://dx.doi.org/10.1115/94-gt-298.
Full text