Contents
Academic literature on the topic 'Équilibrage de ligne d'assemblage'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Équilibrage de ligne d'assemblage.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Équilibrage de ligne d'assemblage"
Iassinovski, Serguei, Khalid Kouiss, and Christophe Fagnart. "Prise de décision et simulation en ligne : application sur une ligne d'assemblage." Revue Française de Gestion Industrielle 26, no. 1 (March 1, 2007): 69–85. http://dx.doi.org/10.53102/2007.26.01.677.
Full textGiard, V., and J. Jeunet. "Modélisation du problème général d'ordonnancement de véhicules sur une ligne de production et d'assemblage." Journal Européen des Systèmes Automatisés 40, no. 4-5 (June 30, 2006): 463–96. http://dx.doi.org/10.3166/jesa.40.463-496.
Full textDanjou, François, Vincent Giard, and Etienne Le Roy. "Analyse de la robustesse des ordonnancements / réordonnancements sur ligne de production et d'assemblage dans l'industrie automobile." Revue Française de Gestion Industrielle 19, no. 1 (March 1, 2000): 17–36. http://dx.doi.org/10.53102/2000.19.01.336.
Full textDissertations / Theses on the topic "Équilibrage de ligne d'assemblage"
Gu, Liya. "Modèles déterministe, stochastique et multicritère pour l'équilibrage de lignes d'assemblage." Thesis, Metz, 2008. http://www.theses.fr/2008METZ003S/document.
Full textOur work considers the problem of balancing the assembly line (ALBP). This is a combinatorial optimization problem which consists in assigning operations to stations of the assembly line while respecting various constraints in order to optimize a criterion of efficiency. Two types of problems are defined, based on the objective to minimize. The type I problem (SALBP-1) minimizes the number of stations in a given cycle time. And the problem of type II (SALBP-2) minimizes the cycle time given by the largest time station with a given number of stations. Problems of type II are only considered in our work. Firstly, a method for determining the lower bound of the cycle time which respects the number of stations is determined. This method combines the Lagrangian relaxation and the columns generation method. The Lagrangian relaxation is used to relax the constraints of precedence. The problem of the Lagrangian relaxation is given by the columns generation. Then, a new heuristic is proposed for solving the SALBP-2 problem. This heuristic consists of two steps. In the first step, an initial solution is produced by an heuristic based on a weight corresponding to the position of operations and a threshold defined for each station. The, in the second step, the solution is improved by a process of transfer and exchange. Finally, meta-heuristics are used to solve deterministic and stochastic problems.Two main meta-heuristics are considered: the electromagnetism-like mechanism algorithm (EM) and the estimated distribution (ED). The performance of our method is confirmed via simulation and it is compared with simulated annealing (SA). Due to its better performance, EM was chosen to balance the stochastic lines with random operation times. In this case, the cycle time is minimized under constraint of the reliability of the line which must be greater than a given value. EM is also used to solve multi-objective problems such as minimizing the cycle time and maximizing the reliability of the line by determining a set of Pareto-optimal solutions
Abdennour, Groussi. "Équilibrage des lignes d'assemblage : théorie et application." Thèse, Université du Québec à Trois-Rivières, 1998. http://depot-e.uqtr.ca/4960/1/000645687.pdf.
Full textGu, Liya. "Modèles déterministe, stochastique et multicritère pour l'équilibrage de lignes d'assemblage." Electronic Thesis or Diss., Metz, 2008. http://docnum.univ-lorraine.fr/public/UPV-M/Theses/2008/Gu.Liya.SMZ0803.pdf.
Full textOur work considers the problem of balancing the assembly line (ALBP). This is a combinatorial optimization problem which consists in assigning operations to stations of the assembly line while respecting various constraints in order to optimize a criterion of efficiency. Two types of problems are defined, based on the objective to minimize. The type I problem (SALBP-1) minimizes the number of stations in a given cycle time. And the problem of type II (SALBP-2) minimizes the cycle time given by the largest time station with a given number of stations. Problems of type II are only considered in our work. Firstly, a method for determining the lower bound of the cycle time which respects the number of stations is determined. This method combines the Lagrangian relaxation and the columns generation method. The Lagrangian relaxation is used to relax the constraints of precedence. The problem of the Lagrangian relaxation is given by the columns generation. Then, a new heuristic is proposed for solving the SALBP-2 problem. This heuristic consists of two steps. In the first step, an initial solution is produced by an heuristic based on a weight corresponding to the position of operations and a threshold defined for each station. The, in the second step, the solution is improved by a process of transfer and exchange. Finally, meta-heuristics are used to solve deterministic and stochastic problems.Two main meta-heuristics are considered: the electromagnetism-like mechanism algorithm (EM) and the estimated distribution (ED). The performance of our method is confirmed via simulation and it is compared with simulated annealing (SA). Due to its better performance, EM was chosen to balance the stochastic lines with random operation times. In this case, the cycle time is minimized under constraint of the reliability of the line which must be greater than a given value. EM is also used to solve multi-objective problems such as minimizing the cycle time and maximizing the reliability of the line by determining a set of Pareto-optimal solutions
Bratcu, Antoneta. "Détermination systématique des graphes de précédence et équilibrage des lignes d'assemblage." Phd thesis, Université de Franche-Comté, 2001. http://tel.archives-ouvertes.fr/tel-00258992.
Full textEnmer, Abdallah. "Contribution à l'étude de l'équilibrage des lignes d'assemblage." Lyon, INSA, 1995. http://www.theses.fr/1995ISAL0065.
Full textOne of the problems we faced in assembly line design or reconfiguration is to assign tasks workstations such that the workload for each one is the same. This is a crucial problem since the performance of the line is linked to its balancing quality. So, the aim of this thesis is twofold : since the problem is rare in the French literature, chapter one and two, establish a state-of-the-art on the assembly line balancing problem (ALB) by comprehensively review, update the literature up to date (define the problem, terminology, generalization/extension, related sequencing/scheduling problems) list and analyze the methodological techniques, while chapter three, explain the heuristics methods and an interactive one designed to solve the ALB problem and chapter four first, report on a computational experiment designed to assess the efficacy of proposed methods against others from literature and second, describes the software package based on theses methods. The later which is interactive, user-friendly and informative will be a valuable aid (decision aid , training, learning) for both experienced users and inexperienced ones in the ALB domain. The user can -choose a problem to solve (literature, randomly generated, enter from keyboard) - choose a method to run (from literature, designed) - update data (cycle time, processing times) - and, of course, uses all traditional data base management functions
Aljubayli, Ramia. "Recherche opérationnelle et équilibrage de ligne d'assemblage orienté coût : le cas de la production d'automobiles dans l'usine syrienne de Hmisho." Nice, 2012. http://www.theses.fr/2012NICE0036.
Full textHaving a closer look at an automobile manufacturing plant, we find that the assembly line consists of many stations arranged sequentially. A product unit runs through the line in one direction and visits all stations that are interconnected by an automatic conveyor. This unit is subject to a series of operations carried out by operators for a limited time. During this period the operators should carry out all the required operations assigned to this station (less automation). The important issue to be addressed in the workshop is assigning operations along an assembly line in a way that no station is loaded more than the others. This issue is known as: the assembly line balancing problem. The objective of this thesis is to provide an optimal solution to this problem. Our study discusses the case of a manufacturing plant located in Syria. The study tries to solve the assembly line balancing problem with an objective of reducing production costs. Therefore, our key issue deals with determining a configuration associated with the minimum costs including the examination of optimization methods to be used. Two algorithms of operational research are proposed. The first is an exact method based on dynamic programming and the second is a heuristic algorithm based on the “Greedy” algorithm. By applying these algorithms to data of the “Hmisho Syrian plant” we find that the second algorithm gives better results with respect to the minimization of the production costs
Malyutin, Sergey. "Algorithms and Software for Decision Support in Design of Assembly and Transfer Lines." Thesis, Lyon, 2016. http://www.theses.fr/2016LYSEM020/document.
Full textAn overview of existing problems and methods for the design of assembly and transfer lines is given. A new workforce assignment problem for a paced multi-product assembly line with a goal of minimizing the number of workers is studied. Various precedence relations between operations and functions of operation processing times dependent on the number of workers areconsidered. A new problem of multi-objective optimization for a single product transfer line is solved. Several exact and heuristic methods and their computer implementations for both problems are developed by the author. An application of developed approaches to solving a real production problem relevant to the European project amePLM is demonstrated
Elhoud, Anass. "Artificial intelligence-based approach for acceleration & optimization of hybrid production line preliminary design in the automotive industry." Electronic Thesis or Diss., Bourgogne Franche-Comté, 2024. http://indexation.univ-fcomte.fr/nuxeo/site/esupversions/d3a97160-65a3-48c3-b8c5-c431847fc587.
Full textIn the competitive automotive industry, optimizing production lines is crucial for enhancing efficiency and profitability. This thesis presents a comprehensive solution developed in collaboration with a leading automotive company, tackling three key challenges: assembly sequence planning, resource balancing, and dynamic performance evaluation. The first solution optimizes assembly sequences to minimize resource usage and production costs using reinforcement learning and hierarchical clustering. The second solution addresses assembly line balancing, employing metaheuristic algorithms to reduce cycle time without increasing resources. The third solution improves dynamic production line performance under stochastic events, such as breakdowns and delays, through inventory management and optimal control strategies. Each solution was validated in real industrial environments, demonstrating substantial improvements in production line efficiency and performance
Lortie, Marie-France. "Équilibrage de chaîne d'assemblage : étude de cas dans l'industrie aéronautique." Thèse, Université du Québec à Trois-Rivières, 2007. http://depot-e.uqtr.ca/1363/1/030033031.pdf.
Full textYin, Binbin. "Contribution au pilotage réactif des sytèmes flexibles d'assemblage : méthode d'équilibrage dynamique." Besançon, 1995. http://www.theses.fr/1995BESA2035.
Full text