Dissertations / Theses on the topic 'Complex Material Handling Systems'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 dissertations / theses for your research on the topic 'Complex Material Handling Systems.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.
Del, Grosso Domenico. "Simulation-Based Control of Complex Material Handling Systems." Doctoral thesis, Universita degli studi di Salerno, 2010. http://hdl.handle.net/10556/116.
Full textMaterial Handling (MH) consists in the movement and storage of parts, in a manufacturing or distribution process, from one location to another. Material Handling Systems (MHSs) are everywhere in production plants, assembly lines, product distribution, logistics, intermodal activities (railways, road transportation, container ships, etc..). They usually are distributed, sometimes itinerant and often mixed manned and automated. Although not adding value in the manufacturing process, MH usually influences great part of a company’s operation costs, especially, for example, in the food distribution chain. Due to the increasing demand for a high variety of products, flexibility and efficiency are two important keywords in MHSs. Optimizing MH activities means having shorter response times and an increased throughput of the plant. The importance of this optimization process is very high in today’s companies. Nowadays, the interest in this process is growing rapidly since several new technologies, like the Radio Frequency Identification (RFID) are available which finally allow to introduce an automation level to operating MHSs, almost without stopping operations and at a very low cost. In MHSs control iusses involve the problem of the optimal sequencing and scheduling of short-term activities. The so-called problem of "Dispatching” consists in defining a procedure to assign resources to missions. This is often made by using heuristic rules called Dispaching rules. For control purposes, a model of the system is necessary. Due to the complex and heterogeneous nature of MHSs, modeling approaches proposed in the literature are typically very specific and context-dependent. Moreover, the strong combinatorial nature of the control problem, and the presence of a great number of constraints to be considered, usually make the design of a control solution very tough. To devise a closed form analytical control action can require a great computational effort and could result not so convenient. Indeed, turbulence and variations in the input set of the system can suddenly make not more adequate a hardly designed control action. Thus, the choice of Dispatching rules as control actions, despite producing only local optimum solutions, is very usual for MHSs. Dispatching rules, indeed, result in a more reasonable and robust way to control MHSs since they are effective and computationally inexpensive. In the absence of a closed form control solution, Simulation is fundamental to evaluate the effects of a control action which cannot be analytically predicted. The outcome of the application of a rule or another can be easily tested via simulation and this is the reason why having a good model assumes a further major importance. In this thesis a unique arcchitecture for the modeling and the control of complex MHSs has been proposed.
VIII n.s.
Zhao, Ying. "Optimization of cooperative material handling systems." Click to view the E-thesis via HKUTO, 2006. http://sunzi.lib.hku.hk/hkuto/record/B37837710.
Full textZhao, Ying, and 趙穎. "Optimization of cooperative material handling systems." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2006. http://hub.hku.hk/bib/B37837710.
Full textWoo, Siu-on. "Dynamic routing for automated material handling systems." Click to view the E-thesis via HKUTO, 2005. http://sunzi.lib.hku.hk/hkuto/record/B35679207.
Full textWoo, Siu-on, and 胡兆安. "Dynamic routing for automated material handling systems." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2005. http://hub.hku.hk/bib/B35679207.
Full textHenriksson, Johannes. "Support systems for material handling in forklifts." Thesis, KTH, Ergonomi, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-145878.
Full textRocha, André Dionísio Bettencourt da Silva. "An agent based architecture for material handling systems." Master's thesis, Faculdade de Ciências e Tecnologia, 2013. http://hdl.handle.net/10362/10504.
Full textIn the recent past, market requirements and consequently the production lines changed too. With the customization of products and the growing number of products to produce, the dy-namism and flexibility of the lines are now requirements of extreme importance. A traditional approach indicates great difficulty in satisfying those needs and as such has appeared some proposals in order to solve them. The proposed approaches are mostly related to scheduling and production planning. The transportation system is not usually inserted in the control architecture and system reconfiguration, constantly being put aside in order to this issue. This work proposes architecture to support self-organized transportation system, where it performs control functions and management. The architecture was developed for a system com-prising conveyors where the stations operate. The proposed work is a multi-agent architecture that use Dijkstra’s algorithm to improve the routing of products and materials. The main features of architecture are load balancing pre-sent in conveyors and ability to plug and unplug stations in runtime. The architecture was first tested in a virtual environment in order to check the behavior of the same and was subsequently tested in a real industrial cell in order to demonstrate its use in a real system.
Silva, Rinaldo J. "Information processing in designing manufacturing systems with material handling." Thesis, Georgia Institute of Technology, 1992. http://hdl.handle.net/1853/25110.
Full textBartlett, Kelly K. "Congestion-aware dynamic routing in automated material handling systems." Diss., Georgia Institute of Technology, 2014. http://hdl.handle.net/1853/53013.
Full textBabiceanu, Radu Florin. "Holonic-based control system for automated material handling systems." Diss., Virginia Tech, 2005. http://hdl.handle.net/10919/28326.
Full textPh. D.
Riel, Philippe F. "An evaluation process for material handling systems within FMS." Diss., Virginia Polytechnic Institute and State University, 1989. http://hdl.handle.net/10919/54401.
Full textPh. D.
Fang, Tao. "The integration of line loading and material handling." Diss., Georgia Institute of Technology, 1997. http://hdl.handle.net/1853/30709.
Full textMullen, T. D. "Material flow control in complex manufacturing systems." Thesis, University of Strathclyde, 1991. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.360792.
Full textShrivastava, Ameya R. "Simulation Modeling of Warehouse Environment Utilizing AGVS Material Handling Systems." University of Cincinnati / OhioLINK, 2005. http://rave.ohiolink.edu/etdc/view?acc_num=ucin1114798132.
Full textComer, Pamela Renita. "Simulation modeling of material handling systems : requirements and comparative analysis /." Thesis, This resource online, 1993. http://scholar.lib.vt.edu/theses/available/etd-11102009-020221/.
Full textGong, Dah-Chuan. "A metalmodel of asynchronous material transport." Diss., Georgia Institute of Technology, 1991. http://hdl.handle.net/1853/32868.
Full textLiu, Fuh-hwa Franklin. "Analytical approaches for designing a class of material flow systems." Diss., Georgia Institute of Technology, 1988. http://hdl.handle.net/1853/24254.
Full textSeibold, Zäzilia [Verfasser]. "Logical Time for Decentralized Control of Material Handling Systems / Zäzilia Seibold." Karlsruhe : KIT Scientific Publishing, 2016. http://www.ksp.kit.edu.
Full textCheung, Wing Sze. "A study of material handling system for apparel industry /." View abstract or full-text, 2005. http://library.ust.hk/cgi/db/thesis.pl?IEEM%202005%20CHEUNG.
Full textChen, Ming-Te Mark. "Flow path design of a class of material handling systems for robustness and reliability." Diss., Georgia Institute of Technology, 1994. http://hdl.handle.net/1853/25381.
Full textBakkalbasi, Omer. "Flow path network design and layout configuration for material delivery systems." Diss., Georgia Institute of Technology, 1989. http://hdl.handle.net/1853/25617.
Full textHaraldsson, Andreas, and Henrik Nederman. "Riktlinjer för utformande av informationssäkerhetspolicy : En fallstudie vid Linde Material Handling." Thesis, Örebro University, Swedish Business School at Örebro University, 2007. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-2184.
Full textDenna uppsats dokumenterar en fallstudie som gjordes hösten 2006 vid Linde Material Handling i Örebro. Företaget var på väg att expandera och planerade att utöka användningen av IT i verksamheten. I samband med detta gavs undertecknade i uppdrag att utforma en informationssäkerhetspolicy för verksamheten. I en litteraturstudie kunde det konstateras att det inte fanns några enklare riktlinjer för att utforma sådana policies, varmed syftet blev att göra detta. Genom en fallstudie på företaget där vi utformade en IS-policy för deras verksamhet, och även gjorde intervjuer med ledning och dokumentationsanalyser, utrönas vilka problem som kan uppstå och vilka överväganden som bör göras för att utforma en lyckad policy. Riktlinjerna kan användas av företag som känner igen sig i fallbeskrivningen. Vi har i arbetet avgränsat oss från att studera hur en policy ska införas eller utvärderas.
De riktlinjer vi utformade kan sammanfattas som följande:
* Utforma minimalistiskt
Policyn bör vara enkel, de föreskrifter och sidor som finns bör vara få till antalet och endast omfatta det absolut viktigaste.
* Tillgodose användaracceptans
Policyns innehåll ska inte uppfattas som kränkande eller alltför omständligt av de anställda.
* Formulera och ordna mål
Det är viktigt att se till att de säkerhetsmål som finns i verksamheten hjälper till att uppfylla de mer generella organisatoriska målen.
* Förankra i beslutande organ
Säkerhetsarbetet bör vara förankrat i ledningen.
* Uppdelning i delpolicies
Det kan vara aktuellt med olika delpolicies för olika delar av verksamheten
om dessa skiljer sig märkbart åt.
Johansson, Erik. "Finding and reducing obstacles for implementing new logistics systems in the construction industry." Thesis, Karlstads universitet, Avdelningen för företagsekonomi, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-28371.
Full textDai, Bin. "Development of a free-ranging material handling system for manufacturing and warehouse application /." View abstract or full-text, 2009. http://library.ust.hk/cgi/db/thesis.pl?IELM%202009%20DAI.
Full textThongmal, Larsson Marie. "A model for material handling improvements when using automated storage systems: A case study." Thesis, Linnaeus University, School of Engineering, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-6350.
Full textThe purpose of this thesis is to create a model of how to organize the placements of articles in an automated storage system in order to reduce time and cost related to the extractions. The model was developed during an investigation at a case company, and a comprehensive study of the material handling identified bottlenecks, whereof one was chosen to be further investigated: the automated storage system. The automated storage system is newly installed equipment, which required new working methods to be incorporated to the already existing working environment. The ABC-analysis was used in order to motivate how the articles should be placed in the automated storage. The goal for the new way of handling material was to put as little effort as possible on time related to the extraction of material. This due to the realization of material handling processes being a huge contributor to waste activities. This resulted in the development of the model and the suggestion that is given to the case company is to place the most frequent extracted articles close to the users. However, advantages must be held against disadvantages of rearrangements since the material handling will not be eliminated totally due to smaller improvements.
Syftet med denna uppsats är att skapa en modell för hur man ska organisera artikelplaceringar i ett automatiserat lagersystem för att reducera tid och kostnad relaterat till uttag av material. Modellen skapades genom en undersökning på ett fallföretag, en omfattande studie av materialhanteringen identifierade flaskhalsar, varav en valdes för fortsatt undersökning: det automatiserade lagersystemet. Det automatiserade lagersystemet är en nyinstallerad utrustning, som kräver att nya arbetsmetoder ska inkorporeras till den redan existerande arbetsmiljön. ABC-analysen användes för att motivera hur artiklarna ska placeras i det automatiserade lagret. Målet för det nya sättet att hantera material på var att så få insatser som möjligt skulle användas för uttag av material. Detta pågrund av insikten utav att materialhanteringsprocesser är en stor bidragande slöserifaktor. Detta resulterade i modellen och förslagen som ges till fallföretaget är att placera de mest frekvent använda artiklarna nära användaren. Emellertid så måste man väga fördelar mot nackdelar av en förändring eftersom materialhanteringen inte kommer att elimineras helt pågrund av mindre förbättringar.
Boparai, Ramanpreet. "Integration of operation allocation and material handling in the design of flexible manufacturing systems." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 2001. http://www.collectionscanada.ca/obj/s4/f2/dsk3/ftp04/MQ62188.pdf.
Full textShen, Yu-Cheng. "The impact of vehicle dispatching on the design of multiple-transporters material handling systems." Diss., Virginia Tech, 1995. http://hdl.handle.net/10919/40224.
Full textNapisa, Rodolfo R. "Conceptual design of a material handling system for a county airport mail center." Master's thesis, This resource online, 1997. http://scholar.lib.vt.edu/theses/available/etd-12162009-020127/.
Full textSivagnanavelu, Devi G. "Dynamic scheduling of flexible manufacturing systems : a study of machine and material handling control strategies." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 2000. http://www.collectionscanada.ca/obj/s4/f2/dsk1/tape4/PQDD_0020/MQ47839.pdf.
Full textTabatabaei, Sorour. "Numerical prediction for thixotropic and non-thixotropic material systems in complex flow." Thesis, Swansea University, 2014. https://cronfa.swan.ac.uk/Record/cronfa43154.
Full textNotarberardino, Bruno. "Image based finite element modelling for the mechanical characterisation of complex material systems." Thesis, University of Exeter, 2010. http://hdl.handle.net/10036/99354.
Full textLee, Moonsu. "Analytical models to evaluate system performance measures for vehicle based material-handling systems under various dispatching policies." Diss., Texas A&M University, 2005. http://txspace.tamu.edu/bitstream/handle/1969.1/2352/etd-tamu-2005A-INEN-Lee.pdf?sequence=1.
Full textOKUMA, Shigeru, Tatsuya SUZUKI, and Eiji KONAKA. "Safety Verification of Material Handling Systems Driven by Programmable Logic Controller : Consideration of Physical Behavior of Plants." Institute of Electronics, Information and Communication Engineers, 2004. http://hdl.handle.net/2237/14987.
Full textYemenicioglu, Ender [Verfasser]. "Data exchange for the physics-based simulation of material handling systems in the digital factory / Ender Yemenicioglu." Magdeburg : Universitätsbibliothek, 2016. http://d-nb.info/113566207X/34.
Full textChoi, Soodong. "Material flow system integration in EOQ, ELSP, and Kanban production environments /." free to MU campus, to others for purchase, 1998. http://wwwlib.umi.com/cr/mo/fullcit?p9901227.
Full textJansson, Anton. "Only a Shadow : Industrial computed tomography investigation, and method development, concerning complex material systems." Licentiate thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-54880.
Full textMultiMatCT
Hedberg, Daniel, and Viktor Hjärtquist. "Evaluation of AGV-systems for material handling in production. A simulation study at the rear axle assembly at Scania." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-177265.
Full textExamensarbetet är utfört vid Institutionen för teknik och naturvetenskap (ITN) vid Tekniska fakulteten, Linköpings universitet
David, Carlsson, and Nilsson Björn. "Efficient internal material flow of boxes to gain a well-organized supply of components : A case study at Scania engine assembly." Thesis, Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-63771.
Full textInom tillverkningsorganisationer är materialflödet en prioriterad del av försörjningskedjan att utvärdera, eftersom den ofta står för en betydande del av kostnaderna. Utvärderingen avser analys och optimering av materialflödet som uppstår vid tillverkning av produkter. Den kan fokusera på många olika nivåer, som materialflödet i en region eller inom ett företags interna processer. Materialflödet berör emellertid transporten, operationerna och materiallager. Ett välorganiserat materialflöde gör det möjligt för organisationer att sänka kostnaderna och öka konkurrenskraften, genom ökad inre- och yttre effektivitet av utföranden inom företaget. Scania verkar inom bilindustrin och strävar ständigt efter att förbättra sin försörjningskedja när det gäller produktivitet och lägre kostnader, för att möta marknadens behov och öka konkurrenskraften. Idag har Scanias motormontering i Södertälje verksamheter i två huvudbyggnader, med ca en kilometer mellan varandra. Den ena byggnaden är materiallagret, och den andra byggnaden är den faktiska monteringen. I framtiden kommer de två byggnaderna att bli integrerade. Följaktligen har projektlogistikavdelningen vid Scanias motormontering bedömt en möjlighet att organisera och förbättra deras materialflöden. Den kommande integrationen mellan de två byggnaderna gör det möjligt att undersöka hur de aktuella materialflödena kan bli effektivare, innan de appliceras i det framtida tillståndet. Syftet med denna forskning är att undersöka och förbättra ett materialflöde, boxflöde, i en monteringsmiljö. Ett boxflöde behandlar mindre komponenter som använder plastlådor som förpackningsmaterial. Målet är att klarlägga en effektivare process för flödet av boxar till monteringsbyggnaden. Effektivitet definieras som ett flöde som har kortare total ledtid, högre kapacitet, lägre tid / kostnad per box levererad och en bibehållen eller förbättrad ergonomi under manuella hanteringar. För att uppfylla syftet med forskningen har olika typer av intervjuer, observationer och datasamlingar använts, för att skapa en djupare förståelse över den nuvarande situationen hos Scanias motormontering. Genomförd benchmarking och litteraturforskning har använts för att förstå hur andra företag inom branschen, även andra avdelningar på Scania, hanterar sina boxflöden. Den insamlade empirin har använts i en analys där de olika flödena av boxar har jämförts både med den teoretiska referensramen samt varandra. Konklusionerna från analysen är presenterade som nyckelfaktorer för att öka effektiviteten vid hantering av boxföden. Dessa nyckelfaktorer ger en ökad teoretisk förståelse, när syftet är att skapa ett effektivare materialflöde i form av boxar, i en monteringsmiljö. I denna forskning används nyckelfaktorerna som riktlinjer för att skapa en effektivare process för flödet av boxar. Det vill säga, att implementera nyckelfaktorerna teoretiskt i ett praktiskt sammanhang. För att ta fram en effektivare process har ett Business Case realiserats, som presenterar hur samtliga processer inom boxflödet borde organiseras på fallföretaget. Det vill säga, hur olika materialhanteringsoperationer och utrustningar borde användas för att uppnå en ökad effektivitet som helhet. Hur boxflödet ska organiseras presenteras som rekommendationer. Dessa bidrar med insikter och riktlinjer för hur Scanias motormontering borde organiseras, gällande deras interna materialflöde. Tillsammans med resterande forskningsfrågor uppfyller rekommendationerna syftet med forskningen.
Bäck, Daniel, and Peter Johansson. "A model for effective development of plant layouts and material handling systems : En modell för effektiv utformning av fabrikslayouter och materialhanteringssystem." Thesis, Växjö University, School of Technology and Design, 2006. http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-1306.
Full textIn this thesis was a model developed, in order to improve deficiencies in existing literature regarding the layout problem and to give companies a comprehensible user-friendly procedure on how to design competitive production processes, plant layouts and material handling systems. The model consists of six phases that can be used sequentially in order to design, evaluate, implement and maintain effective plant layouts and material handling systems. The model can also be used to examine and optimize processes. The first four phases of the model were tested successfully in a case study at Holtab AB, a medium sized manufacturing company in Tingsryd.
Schmidt, Thorsten, and Frank Schulze. "Simulationsbasierte Entwicklung energieeffizienter Steuerungsstrategien für Materialflusssysteme." Saechsische Landesbibliothek- Staats- und Universitaetsbibliothek Dresden, 2018. http://nbn-resolving.de/urn:nbn:de:bsz:14-qucosa-233336.
Full textKlein, Nils. "The impact of decentral dispatching strategies on the performance of intralogistics transport systems." Doctoral thesis, Saechsische Landesbibliothek- Staats- und Universitaetsbibliothek Dresden, 2014. http://nbn-resolving.de/urn:nbn:de:bsz:14-qucosa-147739.
Full textAbrahamsen, Liam Gustav. "Development of Kinetic Speciation Models for complex Quartz Sand or Montmorillonite Ternary systems containing metal ions and humic material." Thesis, University of Manchester, 2009. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.511858.
Full textSchmidt, Thorsten, and Frank Schulze. "Simulationsbasierte Entwicklung energieeffizienter Steuerungsstrategien für Materialflusssysteme." Wissenschaftliche Gesellschaft für Technische Logistik (WGTL), 2011. https://tud.qucosa.de/id/qucosa%3A30811.
Full textBaumann, Marion [Verfasser], and K. [Akademischer Betreuer] Furmans. "Discrete Time Analysis of Multi-Queue Systems with Multiple Departure Streams in Material Handling and Production under Different Service Rules / Marion Baumann ; Betreuer: K. Furmans." Karlsruhe : KIT Scientific Publishing, 2019. http://d-nb.info/1202111920/34.
Full textMokhlespour, Esfahani Mohammad Iman. "Development and Assessment of Smart Textile Systems for Human Activity Classification." Diss., Virginia Tech, 2018. http://hdl.handle.net/10919/97249.
Full textPHD
Ramde, Sara, and Lana Qadir. "Effektivisering av materialflödet i inlagringsprocessen i ett distributionslager : Genom exkludering av begränsningar." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-41781.
Full textPurpose – The purpose of the study is to identify critical constraints in the inbound process at a distribution warehouse. To accomplish the purpose two research questions were formulated: Which critical constraints can occur in the material flow in the inbound process at a distribution warehouse? How can the identified constraints be excluded in the inbound process? Method – The study was performed inductively, and the data collection techniques were interviews, observations, document studies and literature studies. A single case study was performed at a distribution warehouse and the empirical data and theories were compared to accomplish the purpose of the study. Findings – The result of the study demonstrates that the critical constraints in the inbound process at a distribution warehouse are space, material handling, automatic systems and warehouse layout. The conclusion of the study is that the constraints are connected and affect each other since they are all included in the same process. To exclude the constraints different types of standards should be implemented in the inbound process, and distribution warehouses should work with continuous improvements. Implications – The study does not contribute to new theories but can be practically beneficial for distribution warehouses similar to the studies case study. Limitations – The study only focuses on one distribution warehouse and is therefore a single case study. The generalizability could have been higher if the study had been conducted at multiple distribution warehouses.
Hozak, Kurt. "RFID as an enabler of improved manufacturing performance." Columbus, Ohio : Ohio State University, 2007. http://rave.ohiolink.edu/etdc/view?acc%5Fnum=osu1178836596.
Full textDahl, Alexander. "Product allocation for an automated order picking system in an e-commerce warehouse : A data mining approach." Thesis, Linköpings universitet, Logistik- och kvalitetsutveckling, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-165703.
Full textJuslin, Victor, and Malin Gavlefors. "Materialhanteringens utmaningar för tillverkande företag." Thesis, Tekniska Högskolan, Jönköping University, JTH, Logistik och verksamhetsledning, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-50075.
Full textForsén, Isak. "Materialspill i aktivt projekt : Hur ser situationen ut och kan mängden spill minskas?" Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-185631.
Full textSCA Obbola is a papermill that is investing in the future and is expanding its production. The project is called Expansion Obbola and they plan to increase their factory's capacity from 450,000 tonnes kraftliner to 725,000 tonnes. Peab is the contractor for the project, it started in 2018 and is expected to be completed by the year 2023. In collaboration with Peab, a report has been carried out on the Expansion Obbola project to find out how they work to minimize material waste. The report will also look into the current way of dealing with material waste and if the opportunity exists to reduce the amount of material waste even more. The purpose of the report is to get a clearer picture of the material waste on the project Expansion Obbola, to further enable and expand Peab's work with material waste in an efficient, economical and environmentally friendly way. The report also aims to contribute to Peab's future work with material waste in a positive way. During the production of a new building, it is estimated that 30-40% of total cost consists of material costs, which means that if the amount of material waste can be limited, it can contribute to a more sustainable, economical and environmentally friendly way of building. This report resulted in that the situation in project Expansion Obbola is consisting of some difficulties and that it significantly complicates the possibility of reducing the material waste. Pressured time schedule, lack of space and limited guidelines on how to handle material waste are the main difficulties that the project poses but after the completion of this report, it is still considered that there are plenty of development areas for the project regarding material waste. Some of the presented proposals on how to work to reduce the amount of material waste are: Changing the day and time for revision of drawings, increase the cooperation between supervisors, change the wood for casting to a lower quality to spare the environment and expand the collaboration with the designers. The Expansion Obbola project is therefore considered, despite difficult conditions, to have good opportunities to improve its work with material waste and potentially be able to reduce the amount of material that is thrown away unnecessarily.