Dissertations / Theses on the topic 'BIM (Building Information Model)'

To see the other types of publications on this topic, follow the link: BIM (Building Information Model).

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'BIM (Building Information Model).'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Govan, Ivan, and Burim Berisha. "BIM Building Information Model : Hinder & Drivkraft." Thesis, Högskolan i Skövde, Institutionen för teknik och samhälle, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:his:diva-6587.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The  construction  industry  is  a  costly  business  such  in  respect  of  capital  for  most construction defects which then require rework, tear down and rebuild again. This study is  meaningful  awareness  of  tools  that  can  reduce  this  best  through  communication  and information sharing between the parties.  The  construction  industry  is  known  as  temporary  projects  organizations,  where  the construction  project  consists  of  several  actors  who  have  to  communicate  and  share information  between  them  to  avoid  mistakes  later  in  the  build  time.  These  actors  are bounded together thus for the duration of the project, then broken when the project has reached its end. The challenge here is for these actors to apply a tool that can help and simplify communications, information sharing, and perhaps the most important aspect is to  create  a  routine  for  the  association  and  the  shattering  of  these  actors.  To  implement such  behavior  using  a  tool  such  as  BIM  in  the  industry  whose  size  perhaps  is indescribable may be a very hard task.  BIM (Building Information Model) could be seen as the solution to this problem because it  acts  as  a  portal  where  the  actors  involved  must  sign  in  and  communicate,  share information, and eventually create a behavior, a routine for this association and division of  the  actors  following  the  end  of  the  project.  The  technology  could  help  the  involved from  the  beginning  of  the  project,  already  in  the  model  stage,  break  down  and  prevent any construction barriers when the building has been placed in the works.  In the current situation used paper models, 2D models and three-dimensional models, 3D, where  the  last  one  is  a  part  of  the  BIM.  BIM  makes  it  also  possible  to  implement  4D, price  calculation  for  the  construction  from  beginning  to  end  and  5D  ie  construction details such as what kind of wood the door is made of, what kind of concrete it is, and even the amount of cable for the construction for example.  BIM  is  seen  as  a  information  technology  used  primarily  in  construction,  where  to encounter  several  obstacles  during  the  implementation  and  use  of  such  technology  is expensive  to  implement  in  a  small  operation,  but  it  creates  many  drivers,  many  agents that  have  implemented  BIM,  which  ultimately  pays  according  to  those  who  can  afford and in the current situation using it
2

Jaffery, Syed Raza Ali. "Envisioning a building information model (BIM) integrated building performance visualization (iPViz) interface." Thesis, University of British Columbia, 2016. http://hdl.handle.net/2429/58925.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The dispersed nature, complexity, and amount of information available in modern buildings with advanced management and control systems, makes it challenging for building operators to holistically understand building performance. One of the reasons is the lack of integration among multiple information sources and tools making it harder to align performance data with user’s experiential model of the physical systems. The goal of this research is to envision an integrated building performance visualization interface that provides contextually relevant, on-demand information to building operators. The research was executed in three sequential phases including an extensive literature review, a detailed case study, and development of a mockup prototype. I conducted an extensive literature review to capture the state-of-the-art in related academic domains and to establish a point-of-departure for the proposed research. The case study focused on a high performance building to understand operation and maintenance practices with an emphasis on building management systems (BMS). The case study involved two phases. In the first phase, I collected qualitative data by conducting interviews, contextual inquiries, and shadowing of building operators. In the second phase, I conducted a survey to collect quantitative data that further expanded upon the initial findings from first phase. The results revealed several overlapping and interrelated challenges that were further analyzed and grouped into two sets of issues: visualization related and system’s interactivity related. I also identified two core problems in the overall use of the BMS: a lack of spatial and informational context, and disconnected monitoring of energy and system performance data. Based on the findings, I developed a BIM Integrated Performance Visualization (iPViz) interface mockup as a proof-of-concept to support the work of building operators. I demonstrated the proposed interface features by using storyboard illustrations based on task-specific scenarios. I designed the scenarios and storyboards to demonstrate the proposed interface’s ability to provide spatially contextual information in response to a building operator’s interactions. The research provides some future directions for the development of BIM-based performance visualization systems. Additional research is required to implement and evaluate the proposed solutions and to analyze their effectiveness in facilitating building management functions.
Applied Science, Faculty of
Civil Engineering, Department of
Graduate
3

Engdahl, Jenny, and Madeleine Hedlund. "BIM för Hållbart Byggande." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-22514.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The purpose of this study is to facilitate sustainable building by the use of BIM. The goal is to determine which aspects of sustainable building, which can be analyzed mainly with BIM tools, but also other aids. The study is based on literature studies and interviews. The literature review examines aspects important for sustainable building by studying environmental certification systems applicable in Sweden, as well as the BIM tools available on the market to analyze these aspects. The literature also includes the concepts of BIM and sustainability in order to provide a clearer view of its meaning. The interviews have brought the study's overall understanding of the industry and guidance on the subject. The results are presented in a table, where the aspects relevant to sustainable building are listed. It can also be read which aspect the certification systems raise. Overall, the study shows 132 aspects distributed across seven areas: Site, Water and Wastewater, Energy and Pollution, Materials and Waste, Indoor and Wellbeing, City Design and finally Implementation and Management. The table also suggests BIM tools and other aids, which can be used in the analysis of a specific aspect. The study shows a slight majority of the aspects, 55 percent, are possible to analyze with BIM tools. The Site is the area with most aspects, which can be analyzed with BIM tools, 95 percent. And Materials and Waste resulted in least aspects with only ten percent. Overall, the study examined 35 different BIM tools. The aspects that require other means of analysis often generates important information about the project, from a sustainability point of view, and in many cases the information can be integrated in the BIM model manually. In the end, the project gets a packed BIM model with useful information, which follows the project all the way into management and later demolition and recycling. The study shows that sustainable building demands a holistic approach where several aspects should be considered in order to achieve sustainability. To analyze the aspects of sustainability requires that relevant and accurate information about the project be collected. Various proposals can be drawn and compared to generate the most sustainable option. A tool for this is BIM. BIM is defined partly as a method of work, building information modeling, but also as a virtual model, building information model. BIM facilitates the coordination of information gathering, both as a working method and a technical tool. This will contribute BIM to achieve the purpose sustainable building.
Syftet med den här studien är att underlätta hållbart byggande genom användandet av BIM. Målet är att utreda vilka aspekter inom hållbart byggande som kan analyseras med fokus på i huvudsak BIM-verktyg, men också andra hjälpmedel. Studien bygger på litteraturstudier och intervjuer. I litteraturstudien undersöks aspekter som är betydelsefulla vid hållbart byggande genom att studera miljöcertifieringssystem som är tillämpningsbara i Sverige, samt vilka BIM-verktyg som finns att tillgå på marknaden för att analysera dessa aspekter. Litteraturstudien innefattar även begrepp rörande BIM och hållbarhet för att ge en klarare bild av dess innebörd. Intervjuerna har tillfört studien övergripande förståelse för branschen och vägledning i ämnet. Resultatet redovisas i en tabell, där de aspekter som är relevanta för hållbart byggande är listade. I tabellen går det även att utläsa vilka aspekter certifieringssystemen tar upp. Totalt visar studien på 132 aspekter fördelade inom sju delområden; Platsen, Vatten och Avlopp, Energi och Föroreningar, Material och Avfall, Inomhusklimat och Välmående, Stadens Gestaltning samt Genomförande och Förvaltning. I tabellen redovisas dessutom förslag på BIM-verktyg samt andra hjälpmedel som används vid analys av en specifik aspekt. Studien visar att en knapp majoritet av aspekterna, 55 procent, är möjliga att analysera med BIM-verktyg. Platsen är det delområde som visar flest aspekter som går att analysera med BIM-verktyg, 95 procent. Material och avfall resulterade i minst aspekter med endast tio procent. Sammantaget har studien undersökt 35 stycken olika BIM-verktyg. De aspekter som kräver andra hjälpmedel för analys genererar ofta information viktig för projektet ur hållbarhetssynpunkt, och går i många fall att integrera i BIM-modellen manuellt. Sammantaget medför det att projektet får en fullmatad BIM-modell med användbar information som följer projektet ända in i förvaltning och sedermera rivning och återvinning. Studien visar att hållbart byggande handlar om att ha en helhetssyn där flertalet aspekter ska beaktas för att uppnå hållbarhet. Det räcker således inte att bara se till exempelvis energihushållning för att anse att ett projekt är hållbart. För att analysera aspekter rörande hållbarhet krävs att relevant och riktig information om projektet insamlas. Då kan olika förslag utarbetas och jämföras för att ta fram det mest hållbara alternativet. Ett redskap för detta är BIM. BIM är definierat dels som en arbetsmetod, byggnadsinformationsmodellering, men också som en virtuell modell, byggnadsinformationsmodell. BIM underlättar samordningen av den insamlande informationen, både som arbetsmetod och som tekniskt verktyg. På så vis bidrar BIM till att uppnå syftet hållbart byggande.
4

Utiome, Erezi Ame Emmanuel. "Extending building information models to construction specifications." Thesis, Queensland University of Technology, 2015. https://eprints.qut.edu.au/84929/1/Erezi_Utiome_Thesis.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.
5

Mendez, Ronald Osiris. "The building information model in facilities management." Link to electronic thesis, 2006. http://www.wpi.edu/Pubs/ETD/Available/etd-050406-153423/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Eriksson, Michael. "BIM i förvaltningsskedet." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-19875.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Syftet med den här studien är att förbättra informationsflödet från projektering och produktion in i förvaltningen. Detta för att väcka ett intresse hos förvaltare och för att visa att det finns pengar att spara genom att ta hand om informationen från projekteringen och produktionen. Tidigare studier inom området BIM visar att stor fokus läggs på projektering och produktion men det är ett väldigt litet fokus på förvaltningen när man talar om BIM. Målet är att konkret kunna visa vad informationen är värd och att visa vilken information förvaltare använder och var den finns i byggprocessens skeden före förvaltningen. Rapporten bygger på en litteraturstudie, intervjuer och beräkningar. Förvaltare har blivit tillfrågade vilken information de använder i förvaltningen och sedan har projektör och entreprenör blivit tillfrågad ifall denna information finns att tillgå i projekteringen och produktionen. Värderingen av informationen har sedan gått till på två sätt. Det ena sättet är att bedöma kostnaden av att uppdatera information mot kostnaden att ta fram information på nytt. Det andra sättet är att med hjälp av nyckeltal (kronor per kvadratmeter) och den lista med typ av information som förvaltare använder, som sammanställts från intervjuerna, ta reda på vad information är värd. Det första sättet att värdera visar att det kostar lika mycket att hålla relationsritningar (A) uppdaterade i som minst 18år och i som mest 50år som att ta fram informationen helt på nytt. Nästan samma gäller för BIM-modell med avseende på relationsritningar (A). Fast där är kostnaden för framtagning på nytt lika stor som att hålla den uppdaterad i som minst 22år och i som mest 58år. Det andra sättet att värdera visar att mindre än 25% av den information man kan finna i projekteringen och eller i produktionen är värd cirka 10% av projekteringskostnaden.
The purpose of this study is to improve the flow of information from the design and construction phase into the facility management. This in order to make the facility managers see the advantages with BIM and to show that there is money to be saved by retrieving the information from the design and the construction phase. Earlier studies show that there actually has been quite little research done within BIM in the facility management and that the main focus has been at the design and the construction phase. The aim with the study is to specify the value of the information and to show which information facility managers use and where it can be retrieved from within the earlier phases of the construction process. The report is based on a literature study, interviews and calculations. A number of facility managers have been asked which types of information they use and designers and entrepreneurs have then been asked if these types of information can be found in the design and the construction phase. The information has been valued in two different ways. In one way the information was valued by comparing the cost between updating existing information or recreate the same type of information. The other way of valuing the information was to find out the worth of information by using key figures (SEK per square meter) and the list of information that facility managers use, which was made up from the interviews. The first way of valuing shows that the cost of producing as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 18years and as most 50years. Almost the same goes for a BIM-model. Only there the difference is that the cost of producing a BIM-model focused on as built drawings (A) in the facility management cost as much as keeping the same type of information updated for at least 22years and as most 58years. The other way that the information was valued shows that less than 25% of the information that can be found in the design and/or construction phase is worth circa 10% of the projecting fee.
7

Sjödin, Magnus, and Tobias Rasping. "Analys av BIM-processen i ombyggnadsprojekt." Thesis, KTH, Byggvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-92567.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Idag används BIM, byggnadsinformationsmodellering, i fler och fler nybyggnadsprojekt och det finns mängder med information att inhämta om detta både i tryckta tidskrifter och på internet. En obesvarad fråga är dock hur arbetsgången ser ut när BIM ska användas i ombyggnadsprojekt. Informationen som går att finna om detta är begränsad trots att ombyggnadsprojekt utgör en betydande del av byggverksamheten, såväl i Sverige som internationellt. Målet med denna rapport är därför att undersöka hur ombyggnadsprojekt i dagsläget utförs med BIM som arbetssätt. Processen att arbeta med BIM har undersökts i detalj för att klargöra hur den ser ut idag och för att identifiera den problematik som just ombyggnationer medför. Denna undersökning har genomförts i två pågående projekt enligt en gemensam analysmodell för att klargöra skillnader och likheter. För att klargöra arbetsprocessen så har ett flertal intervjuer med inblandade i projekten genomförts. Genom ett enkätutskick till båda projekten så har ett jämförbart underlag även tagits fram. Projektens modeller har också undersökts för att klargöra deras detaljeringsnivå. Den stora problematik som identifierats med ombyggnadsprojekt är att eftersom arbetet sker mot befintliga byggnadsdelar måste dessa kontrolleras och hanteras. Av denna anledning behöver därför många gånger en inmätning av dessa göras för att kontrollera och komplettera det underlag som finns tillgängligt eller för att skapa ett helt nytt. Detta är en tidig del i processen och något som måste göras innan ett vidare arbete med att upprätta en modell kan utföras. Gemensamt för båda projekten har varit att använda sig av modellen för att samgranska olika discipliners material med syftet att upptäcka och på så sätt minimera antalet kollisioner i produktionen. Analysen har visat på ganska stora skillnader i arbetssätt beroende på projektens förutsättningar. Den största skillnaden är att det i ett av projekten finns ett intresse ifrån beställaren att en modell ska levereras, för att senare kunna användas i förvaltningen. Beställarens intresse har resulterat i att BIM har använts i större utsträckning i det projektet med bland annat kostnader kopplade till modellen. Något som har framkommit är också att arbetssättet BIM måste standardiseras, möjligtvis genom att företaget tar fram en BIM-manual som kan användas i alla projekt som ska använda sig av BIM. Erfarenhetsåterföring efter genomförda projekt måste även ske för att denna manual ska vara aktuell.
Currently BIM (Building Information Modeling) is used to a higher extent in new construction projects and there is a lot of information to gather about this both in magazines and online. An unanswered question is how the workflow looks like when BIM is used in reconstruction projects. The information that can be found about this is limited despite the fact that reconstruction projects represent a significant proportion of the construction business, both in Sweden and internationally. The aim of this report is to examine how reconstruction projects currently is carried out with BIM. The BIM process has been studied in detail to clarify the current situation and to identify the problems that reconstruction adds. The study was conducted on two ongoing projects in accordance to a common analytical model to clarify the similarities and differences between them. In order to clarify the work process several interviews has been conducted with the project personnel. Through a questionnaire, a survey of both projects has been performed. Project models have also been studied to clarify their level of detail. The major problem that has been identified with reconstruction projects is that the work is carried out on existing building elements that have to be verified. For this reason a detail survey often must be done to verify and add to existing drawing and documentations. The survey is an early part of the process and something that must be done before any further work to establish a model can be done. Common to both projects is the use of the model to coordinate the various disciplines content in order to minimize the number of collisions in the production. The analysis has shown quite significant differences in methods depending on project conditions. The main difference is that in one of the projects the client wants to use the model in the property management and therefore a model must be delivered. The client’s interest led to a wider use of BIM in the project, including costs connected to the objects in the model. Something that has become clear is that BIM as a work tool must be standardized, possibly through a BIM manual drafted by the company, which can be used in all projects that will make use of BIM. Feedback with lessons learned must be added to the manual for it to stay updated.
8

Tauscher, Helga. "Configurable nD-visualization for complex Building Information Models." Doctoral thesis, Saechsische Landesbibliothek- Staats- und Universitaetsbibliothek Dresden, 2017. http://nbn-resolving.de/urn:nbn:de:bsz:14-qucosa-228894.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
With the ongoing development of building information modelling (BIM) towards a comprehensive coverage of all construction project information in a semantically explicit way, visual representations became decoupled from the building information models. While traditional construction drawings implicitly contained the visual representation besides the information, nowadays they are generated on the fly, hard-coded in software applications dedicated to other tasks such as analysis, simulation, structural design or communication. Due to the abstract nature of information models and the increasing amount of digital information captured during construction projects, visual representations are essential for humans in order to access the information, to understand it, and to engage with it. At the same time digital media open up the new field of interactive visualizations. The full potential of BIM can only be unlocked with customized task-specific visualizations, with engineers and architects actively involved in the design and development process of these visualizations. The visualizations must be reusable and reliably reproducible during communication processes. Further, to support creative problem solving, it must be possible to modify and refine them. This thesis aims at reconnecting building information models and their visual representations: on a theoretic level, on the level of methods and in terms of tool support. First, the research seeks to improve the knowledge about visualization generation in conjunction with current BIM developments such as the multimodel. The approach is based on the reference model of the visualization pipeline and addresses structural as well as quantitative aspects of the visualization generation. Second, based on the theoretic foundation, a method is derived to construct visual representations from given visualization specifications. To this end, the idea of a domain-specific language (DSL) is employed. Finally, a software prototype proofs the concept. Using the visualization framework, visual representations can be generated from a specific building information model and a specific visualization description
Mit der fortschreitenden Entwicklung des Building Information Modelling (BIM) hin zu einer umfassenden Erfassung aller Bauprojektinformationen in einer semantisch expliziten Weise werden Visualisierungen von den Gebäudeinformationen entkoppelt. Während traditionelle Architektur- und Bauzeichnungen die visuellen Reprä̈sentationen implizit als Träger der Informationen enthalten, werden sie heute on-the-fly generiert. Die Details ihrer Generierung sind festgeschrieben in Softwareanwendungen, welche eigentlich für andere Aufgaben wie Analyse, Simulation, Entwurf oder Kommunikation ausgelegt sind. Angesichts der abstrakten Natur von Informationsmodellen und der steigenden Menge digitaler Informationen, die im Verlauf von Bauprojekten erfasst werden, sind visuelle Repräsentationen essentiell, um sich die Information erschließen, sie verstehen, durchdringen und mit ihnen arbeiten zu können. Gleichzeitig entwickelt sich durch die digitalen Medien eine neues Feld der interaktiven Visualisierungen. Das volle Potential von BIM kann nur mit angepassten aufgabenspezifischen Visualisierungen erschlossen werden, bei denen Ingenieur*innen und Architekt*innen aktiv in den Entwurf und die Entwicklung dieser Visualisierungen einbezogen werden. Die Visualisierungen müssen wiederverwendbar sein und in Kommunikationsprozessen zuverlässig reproduziert werden können. Außerdem muss es möglich sein, Visualisierungen zu modifizieren und neu zu definieren, um das kreative Problemlösen zu unterstützen. Die vorliegende Arbeit zielt darauf ab, Gebäudemodelle und ihre visuellen Repräsentationen wieder zu verbinden: auf der theoretischen Ebene, auf der Ebene der Methoden und hinsichtlich der unterstützenden Werkzeuge. Auf der theoretischen Ebene trägt die Arbeit zunächst dazu bei, das Wissen um die Erstellung von Visualisierungen im Kontext von Bauprojekten zu erweitern. Der verfolgte Ansatz basiert auf dem Referenzmodell der Visualisierungspipeline und geht dabei sowohl auf strukturelle als auch auf quantitative Aspekte des Visualisierungsprozesses ein. Zweitens wird eine Methode entwickelt, die visuelle Repräsentationen auf Basis gegebener Visualisierungsspezifikationen generieren kann. Schließlich belegt ein Softwareprototyp die Realisierbarkeit des Konzepts. Mit dem entwickelten Framework können visuelle Repräsentationen aus jeweils einem spezifischen Gebäudemodell und einer spezifischen Visualisierungsbeschreibung generiert werden
9

Håkansson, Lisa, and Julia Dannfors. "BIM i produktion : En undersökning om hur BIM kan implementeras i produktion." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-389669.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The object of this report is to investigate how to implement BIM into the production part of the construction industry. How NCC should act to make the transformation as smooth and easy as possible. BIM, Building Information Modelling, is a way of working where you gather all information in one place. All disciplines work in a 3Dmodel and have information about their component in that model. For example, you can create a specific wall with its different layers, that will make it easier to calculate offers from subcontractors and also make the daily work with other orders easier if you know what the wall is build of. You can also use the model for collision controles. This make everything more efficient and make it easier to collaborate between different disciplines.By interviewing people from the industry, mainly from the production, we found that there already are softwares on the market that NCC are using that is easy to use even if you haven't worked a lot with digital tools before. The problem is how to spread the information about these softwares so that more projects can use them. Another difficulty is how to get the craftsmen to use these softwares. The people we interviewed thought that the lack of interest for digital tools, and the older generation, is the main reason why the implementation will be challenging. Our conclusion is that NCC need to find a systematic way to educate their employees in the digital tools that they are using. They need to get better to spread the word about those digital tools within the company so that their employees understand how much they can help and will start to use them. The craftsmen should use the tools to help visualize what they are building and the on-site manager should have a software with more features.
Syftet med arbetet är att undersöka hur BIM kan implementeras i byggbranschen på ett bra och smidigt sätt ute i produktion. Detta ger NCC ett underlag för hur de ska gå tillväga för att denna process ska gå så lätt och smidigt som möjligt men också för att minska risken att fokus hamnar på fel ställe och att implementeringen utförs på ett sådant sätt att personalen blir mer negativa mot digitala hjälpmedel i produktionen.  Då yrkesarbetarna är de som hittills jobbat minst med digitala hjälpmedel har störst vikt lagts vid att undersöka hur implementeringen kommer att påverka dem och hur man ska göra för att få med dem i denna förändring.   BIM, Building Information Modeling, är egentligen byggbranschens digitalisering. Det bygger på att projekteringen utförs i 3D och sedan byggs modellen på med information som gör att arbetet kan effektiviseras och göras smidigare. Det går till exempel att rita upp hur väggarna är uppbyggda i skikt för att underlätta för kalkylatorn vid upphandlingar med underentreprenörer men också i produktion vid beställning av material. Detta minimerar dubbeljobb och effektiviserar produktionen. I projekteringen används det bland annat vid kollisionskontroller där olika discipliners modeller läggs ihop för att se om installationerna krockar någonstans. I förvaltning kan det användas genom att produkterna som använts läggs in i modellen, till exempel vilken armatur, för att sedan lätt kunna hitta den informationen när armaturen senare behöver bytas ut.   Det pratas ofta om att BIM är dyrt och det stämmer att det blir en högre kostnad i början av projekten. Däremot sparas tid och pengar i produktion och förvaltning. Fel som tidigare har upptäckts i produktion och har behövt lösas på plats så gott som försvinner.  Genom att intervjua personer som börjat använda sig av BIM i produktion har upptäckten gjorts att det finns bra och lätthanterliga program som underlättar och effektiviserar vissa delar av produktionen. Två av dessa program som används på NCC idag är Bluebeam och Dalux. Bluebeam används som dokumenthantering där länkar mellan olika ritningar gör att det går snabbt och enkelt att hoppa mellan ritningar. Dalux är ett lättanvändligt program där du kan se projektet i 2D och 3D samtidigt vilket ger en lättare förståelse för vad som ska byggas genom att du kan gå omkring i projektet i 3D. Dalux har även en gratis app som alla yrkesarbetare skulle kunna använda för att öka förståelsen av vad dom bygger vilket skulle kunna göra att frågorna till arbetsledningen skulle minska. Ett problem är då hur man ska lösa det med mobiler och surfplattor till alla, om man inte får använda sin egen eller äger någon privat. Ett annat problem med digitaliseringen är att hårdvarorna är väldigt ömtåliga och ska användas i en hård miljö samt så har internet en tendens att krascha med jämna mellanrum vilket gör att man alltid måste ha en backup av de aktuella ritningarna och modellerna.  En annan fråga är hur man ska få alla att använda sig av de digitala verktygen. Här är de som intervjuats överens om att det med största sannolikhet handlar om hur intresserad man är av teknik och att det är en generationsfråga. De menar att det med generationsskiftet kommer bli lättare att implementera BIM i yrkesarbetarnas arbete.   För att implementera BIM i produktion på ett så bra och smidigt sätt som möjligt bör ordentliga utbildningar av platsledning och yrkesarbetarna genomföras för att sprida kunskapen om vilka möjligheter som finns inom företaget men också för att ge personalen en bra grund så att de känner sig säkra i programmen när de ska börja användas. Det kan öka intresset även hos de som varit negativt inställda från början. Yrkesarbetarna bör använda programmen som visuell hjälp genom att gå omkring i 3D modellen och för att snabbare kunna navigera sig mellan olika ritningar genom länkar. Arbetsledarna kan ha en högre svårighetsgrad med fler funktioner, bland annat olika lager och möjligheten att uppdatera ritningar och modeller.
10

Ignjatovic, Jelena. "Utredning av projekteringsverktygets ROL utvecklingsbehov : En anpassning för norsk marknad." Thesis, Högskolan Väst, Avdelningen för maskinteknik och naturvetenskap, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-9445.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Rail Overhead Line (ROL) is a design tool, owned by the company Bentley Systems AB. The design tool is used by overhead line engineers at Sweco Rail to design contact line for electric railway. Sweco Rail intends to establish themselves on the Norwegian market together with their sister company Sweco A/S. Before entry into the new market, a development of ROL is required. The objective with the thesis has been to identify the requirements and the development needs, which are required to adapt ROL against the Norwegian market.The administrations Jernbaneverket and Trafikverket, which are major customers to Sweco, requires more often that Building Information Model (BIM) is to be used in their projects. The goal with the use of BIM is to lead the work to a more efficient management, as well as reduce the risk of information being lost between various stages and processes within the projects. Before entry on the Norwegian market, it is therefore necessary of Sweco Rail and Bentley to adjust ROL in order to be able to deliver 3D-models. The 3D-models have to fulfill the requirements that the Norwegian administration Jernbaneverket demands of the use of BIM in projects.To identify the development needs that are required for a Norwegian adjustment of ROL; interviews, observations and a study of governing documents was performed. Customer needs were identified and translated to requirements. These requirements led to the identified development needs.The result showed that 56 development needs have to be fulfilled before ROL can be used as a design tool on the Norwegian market. The identified development needs include actions with the intention that the design tool can be used in greater extension on the Swedish market. Sweco and their resources can rectify 22 of the 56 development needs. For the remaining 34 development needs, the owners Bentley Systems need to take responsibility for the solutions that is required to satisfy the needs.
Rail Overhead Line (ROL) är ett projekteringsverktyg, vilket ägs av företaget Bentley Systems AB och används av kontaktledningsprojektörer på Sweco Rail. Projekteringsverktyget används för att projektera kontaktledningsanläggningar. Sweco Rail AB har för avsikt att etablera sig på den norska marknaden tillsammans med systerbolaget Sweco A/S. Inför etableringen på den nya marknaden erfordras en utveckling av ROL för att verktyget skall kunna nyttjas vid projektering i Norge. Syftet med arbetet har varit att identifiera de krav och utvecklingsbehov som krävs i avsikt att anpassa ROL för den norska marknaden.Det blir allt mer vanligt att förvaltningarna Jernbaneverket och Trafikverket, vilka är stora kunder till Sweco, ställer krav på att arbetssättet Building Information Model (BIM) skall användas i projekt. Målet med användningen av BIM är att få en effektivare förvaltning samt reducera risken för att information försvinner mellan olika skeden i projekten och processer. Inför etableringen på den norska marknaden behöver därför Sweco och Bentley Systems anpassa ROL för att bland annat kunna leverera 3D-modeller vilka uppfyller de krav norska Jernbaneverket ställer på användningen av BIM i projekt.För att identifiera utvecklingsbehoven, vilka krävs för en norsk anpassning av ROL, genomfördes intervjuer, observationer samt en studie av styrdokument. Kundbehov identifierades och översattes till krav, vilka även låg till grund för de identifierade utvecklingsbehoven.Resultatet av arbetet visade att det finns 56 stycken utvecklingsbehov, vilka behöver uppfyllas för att ROL skall kunna användas vid projektering för den norska marknaden. Av de identifierade utvecklingsbehoven återfinns även åtgärder av verktyget vilka skulle kunna gynna projekteringen på den svenska marknaden. 22 stycken av de 56 utvecklingsbehoven kan Sweco åtgärda med hjälp av sina resurser på företaget. För de resterande 34 utvecklingsbehoven behöver ägarna av ROL, Bentley Systems, ta ansvar för de lösningar som krävs för att behoven skall tillfredsställas.
11

Porter, Stuart Ross. "Breaking into BIM physical security simulation utilising building information models." Thesis, Curtin University, 2014. http://hdl.handle.net/20.500.11937/963.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Unlike traditional modelling, Building Information Models (BIMs) are a developing standard which has the capacity to support various value add opportunities like utility and environmental simulations. We will demonstrate a system that utilises BIMs to generate an edge and node graph. This graph will utilise knowledge from the physical security domain to highlight weaknesses in a facilities design. We intend for this system to aid designers from an early stage, allowing for a more accessible application of security knowledge.
12

Åskregn, Peter. "BIM i medelstora byggentreprenadföretag : BIM in medium sized building construction companies." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-26416.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Rapporten har ett fokus på Byggnads Informations Modeller (BIM), ett IT-tekniskt verktyg och arbetssätt som har vuxit fram i byggbranschen alltmer under de senaste åren. Hur detta IT-verktyg används hos medelstora byggentreprenadföretag redovisas i denna rapport.Syftet med rapporten är att verka positivt på utvecklingen mot effektivare och resurssnålare arbetsprocesser inom byggbranschen genom att bidra med kunskap om hur användandet av BIM ser ut bland dessa företag, varför det ser ut som det gör, ifall BIM behövs och vad som kan förändra läget i någon riktning.Metodarbetet har bestått av litteraturstudier och intervjuundersökningar.Arbetet inleddes med studier av rapporter och texter relaterade till BIM och intervjuer med representanter för ledande branschföretag inom bygg samt ett par branschorganisationer med inriktning på BIM. Därefter följde ytterligare litteraturstudier med inriktning på förändring och förändringsarbete och enkät och intervjuteknik. Arbetet ledde fram till olika grundteser och förklaringsmodeller som låg till grund för och utformade de intervjufrågor som ställdes vid huvudintervjuerna med elva medelstora byggentreprenadföretag.Huvudintervjuerna gav ett resultat som visade att företagen generellt sett såg på BIM som något positivt, med fördelar såsom lättare kommunikation och som ett hjälpmedel att minska fel i produktionen. Resultatet visade även att det fanns utmaningar såsom mjukvarukompabilitet och en beroendeproblematik mellan projektets involverade parter som innebar att för att tekniken ska kunna ge fördelar måste alla parter använda tekniken.Förklaringarna till det låga användandet bland medelstora byggentreprenadföretag var flera, vanligast var brist på krav från beställarna. Förklaringarna var också avsaknad av behov, kostsamma investeringar, konkurrerande målsättningar, kompabilitetsproblem med mjukvaror och avsaknad av kunskap om BIM.För att gynna en större användning föreslås att tekniska hinder elimineras genom standardisering och utveckling av arbetssättet och mjukvaran rörande BIM, det föreslås också att konkurrerande målsättningar elimineras genom kunskapsspridning om BIM i branschen, både hos entreprenörerna, -för att främja god utbildning så att personalen vill arbeta med tekniken, och hos beställare, -så att de börjar efterfråga BIM och därigenom ger tekniken konkurrensfördelar.
The report has a focus on Building Information Models (BIM), an IT-technical tool- and workmethod that have emerged increasingly in the construction industry in recent years. How this IT tool is used in medium-sized building construction companies is presented in this report.The purpose of the report is to promote positive development towards more efficient and resource-efficient work processes in the construction industry by providing knowledge on how the use of BIM exists among these companies, why it is the way it is, if BIM is needed and what can change the current status in any direction.The work-method has consisted of literature studies and interview surveys.The work began with studies of reports and texts related to BIM and interviews with representatives of leading construction industry companies and a couple of industry organizations with focus on BIM. This was followed by continued literary studies focused on change and change management, survey and interview techniques. This work led to various basic theories and explanatory models as the basis for and the design of the interview questions asked at the main interviews.The main interviews was conducted with eleven medium-sized building construction companies and gave a result that showed that companies generally looked at BIM as something positive with advantages such as easier communication and as a means to reduce errors in production. The result also brought some light to the fact that there existed challenges like software compatibility and dependency between the parties involved in the project, which means that for the technology to be able to provide wanted benefits all parties involved have to use the workmethod.The reasons for the low usage among medium sized construction contractors was several, the most common was the lack of demands of the clients. The reasons were also the absence of need, costly investments, competing objectives, compatibility issues with software and lack of knowledge of BIM.In order to promote a greater usage of BIM it is proposed that the technical obstacles are eliminated through standardization and development of the processing method and software, it is also proposed that the competing objectives are eliminated by spreading and increasing knowledge of BIM in the industry, both amongst entrepreneurs, -to promote good staff training so that the staff will want to work with the technology, and amongst construction clients, -so that they start asking for BIM and thereby provide the technology with a competitive edge.
13

Viljoen, Dewald. "Dynamic building model integration." Thesis, Stellenbosch : Stellenbosch University, 2012. http://hdl.handle.net/10019.1/20257.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Thesis (MScEng)--Stellenbosch University, 2012.
ENGLISH ABSTRACT: The amount and complexity of software applications for the building industry is increasing constantly. It has been a long term goal of the software industry to support integration of the various models and applications. This is a difficult task due to the complexity of the models and the diversity of the fields that they model. As a result, only large software houses have the ability to provide integrated solutions on the basis of a common information model. Such a model can more easily be established since the different software is developed within the same group. Other software suppliers usually have to revert to importing and exporting of data to establish some form of integration. Even large software houses still sometimes make use of this technique between their different packages. In order to obtain a fully integrated solution, clients have to acquire complex and expensive software, even if only a small percentage of the functionality of this software is actually required. A different approach to integration is proposed here, based on providing an integration framework that links different existing software models. The framework must be customisable for each individual's unique requirements as well as for the software already used by the individual. In order for the framework to be customisable, it must either encompass the information requirements of all existing software models from the outset, or be flexible and adaptable for each user. Developing an encompassing software model is difficult and expensive and thus the latter approach is followed here. The result is a model that is less general than BIM-style models, but more focussed and less complex. The elements of this flexible model do not have predetermined properties, but properties can instead be added and removed at runtime. Furthermore, derived properties are not stored as values, but rather as methods by which their values are obtained. These can also be added, removed and modified at runtime. These two concepts allow the structure and the functionality of the model to be changed at runtime. An added advantage is that a knowledgeable user can do this himself. Changes to the models can easily be incorporated in the integration framework, so their future development is not limited. This has the advantage that the information content of the various applications does not have to be pre-determined. It is acknowledged that a specific solution is required for each integration model; however the user still has full control to expand his model to the complexity of BIM-type models. Furthermore, if new software models are developed to incorporate the proposed structures, even more seamless and flexible integration will be possible. The proposed framework is demonstrated by linking a CAD application to a cost-estimation application for buildings. A prototype implementation demonstrates full integration by synchronising selection between the different applications.
AFRIKAANSE OPSOMMING: Die hoeveelheid en kompleksiteit van sagteware programme vir die bou industrie is konstant aan die vermeerder. Dit was nog altyd 'n lang termyn doelwit van die sagteware industrie om integrasie van die verskeie modelle en programme te ondersteun. Hierdie is 'n moeilike taak as gevolg van die kompleksiteit van die modelle, en die diversiteit van die velde wat hierdie programme modelleer. Die gevolg is dat net groot sagteware huise die vermoë het om geïntegreerde oplossings te bied op die basis van 'n gemeenskaplike inligting model. So 'n tipe model kan makliker bymekaargestel word siende dat al die verskillende sagteware binne dieselfde groep ontwikkel word. Ander sagteware verskaffers moet gewoonlik gebruik maak van sogenaamde uitvoer/invoer tegnieke om 'n mate van integrasie te verkry. Selfs groot sagteware huise maak ook gebruik van hierdie tegnieke tussen hulle verskeie pakkette, in plaas van om die programme direk met mekaar te koppel. Om 'n vol geïntegreerde oplossing te verkry, moet kliënte komplekse en duur sagteware aanskaf, selfs al word net 'n klein gedeelte van die funksionaliteit van hierdie sagteware gebruik. 'n Verskillende benadering word hier gevolg, gebaseer op 'n integrasie raamwerk wat verskillende bestaande sagteware modelle met mekaar koppel. Die raamwerk moet aanpasbaar wees vir elke individu se unieke opset. Vir die raamwerk om aanpasbaar te wees, moet dit óf alle bou industrie inligting inkorporeer van die staanspoor af, óf dit moet buigbaar en aanpasbaar wees vir elke gebruiker. Om 'n model te ontwikkel wat alle bestaande inligting inkorporeer van die staanspoor af is moeilik en duur, dus word die tweede benadering gevolg. Die eindresultaat is 'n model wat minder omvattend is as BIM-tipe modelle, maar eerder gefokus en minder kompleks. Die elemente van hierdie buigbare model het nie voorafbepaalde eienskappe nie, eienskappe kan bygevoeg en weggevat word terwyl die program hardloop. Verder word afgeleide eienskappe nie gestoor as waardes nie, maar eerder as metodes wat gebruik word om hulle waardes mee af te lei. Hierdie konsepte laat toe dat die struktuur en funksionaliteit van die model verander kan word terwyl die program hardloop. 'n Verdere voordeel is dat 'n kundige verbruiker die veranderinge self kan doen. Veranderinge in die modelle kan maklik ingesluit word in die integrasie model, so toekomstige ontwikkeling word nie beperk nie. Dit beteken dat die inhoud van die modelle nie vooraf bepaal hoef te word nie. Al het die raamwerk 'n gespesialiseerde oplossing vir elke gebruiker tot gevolg, het die gebruiker nogtans volle beheer om sy model uit te brei tot die omvattendheid van BIM-tipe modelle. Indien nuwe sagteware modelle ontwikkel word met die integrasie raamwerk in gedagte, kan nog gladder en buigbare integrasie moontlik wees. In hierdie tesis word 'n tekenprogram met 'n kosteberaming program gekoppel om die voorgestelde raamwerk te demonstreer. 'n Prototipe implementering demonstreer volle integrasie deur seleksie binne die programme te sinchroniseer.
14

Ruokamo, S. (Simo). "Single shared model approach for building information modelling." Doctoral thesis, Oulun yliopisto, 2019. http://urn.fi/urn:isbn:9789526223704.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Abstract The current practice for information sharing with building information modelling (BIM) is distributed data sharing based on conversions. Conversions are problematic due to data loss, redundancy, and conflicting information. The hypotheses of this research were that i) a conversion-free data exchange is a feasible approach for BIM, ii) benefits can be achieved with a conversion-free information sharing, and iii) no impediment in principle exists for wider industrial use. The use of a single data schema by all applications is a requisite for a conversion-free data collaboration. For enabling the free evolution of the data content, a version free data schema is necessary. A model arrangement implementing partial models is needed for the growing size of models. A single shared model approach eliminates data conflicts and duplicates. For the best availability, the location for the shared model should be on a cloud service. Accessing the cloud model only through a web service, which encapsulates all model handling functionality, will ensure data integration and validity. The validity of IT solutions can only be confirmed with real software. For testing the conversion-free BIM method, a software development kit (SDK) with required functionality was programmed. Three applications and a cloud service for handling the shared model were developed with the help of SDK. In the experiments, Leonardo application was used for modelling walls, 3DTrussme for trusses, and Viewer for viewing the model. All applications were using the same shared model on the cloud. In the experimental test, the information exchange occurred without conversions, and all the data were saved only once on the cloud database. Without conversions, less conflicts and redundancies occurred, which lead to better data integrity and integration. Using SDK, there was no technical barrier for applications to join the single shared model ecosystem, but a drawback was that existing BIM programs are not compatible without remarkable changes. The performance was acceptable in the test run, but in real use, the size of the model and the number of applications and users will be much larger. However, a conversion-free single shared model approach can be a possible trend to the next generation BIM as well as a potential alternative for current data sharing methods using distributed files, conversions, and linked data
Tiivistelmä Rakentamisen tietomallinnuksen (BIM) nykyisenä tiedonjakamisen käytäntönä on hajautettu tietojärjestelmä, joka perustuu konversioihin. Konversiot ovat ongelmallisia tiedon häviämisen, ristiriitojen ja päällekkäisyyksien vuoksi. Tämän tutkimuksen hypoteesit olivat: i) konversiovapaa tiedonjakaminen on mahdollista, ii) etuja on saavutettavissa ilman konversioita tapahtuvassa tiedonsiirrossa ja iii) laajemmalle teolliselle käytölle ei ole periaatteellisia esteitä. Konversiovapaa tiedon jakaminen edellyttää yhden dataformaatin käyttöä. Alati kasvavien tietomallien koko vaatii tiedon järjestämismenetelmän, joko mahdollistaa osamallit. Datan ristiriidat ja päällekkäisyydet voidaan estää yhden jaetun mallin menetelmällä. Informaatio on parhaiten kaikkien osapuolien saatavilla, kun jaettu malli sijoitetaan pilvipalveluun. Kun tietomallia käsitellään vain web-palvelun rajapintafunktioilla, tiedon eheys ja kelpoisuus säilyvät. Tietoteknisten ratkaisujen kelpoisuus voidaan viime kädessä osoittaa vain toimivilla ohjelmistoilla. Konversiovapaan menetelmän testausta varten kehitettiin vaadittavat ominaisuudet sisältävä ohjelmistokehityspaketti (SDK), joka on edellytys sovellusten yhteensopivuudelle. Kolme sovellusta eli 3DTrussme, Leonardo ja Viewer ohjelmoitiin SDK:n avulla. Ohjelmointirajapinta sisälsi tarvittavat toiminnallisuudet tiedonjakamiseen, ja se toteutettiin pilvipalveluna. Testiajossa Leonardo-sovelluksella mallinnettiin seinät, 3DTrussmellä suunniteltiin naulalevyristikot ja Viewer-sovelluksella tarkasteltiin mallia. Kaikki kolme sovellusta käyttivät samaa jaettua mallia pilvipalvelussa. Suoritetussa testissä kaikki informaatio jaettiin ilman konversioita ja tallennettiin vain kerran. Ilman konversioita ja päällekkäisyyksiä saavutettiin parempi datan eheys ja integraatio. SDK:n avulla uudet sovellukset pystyivät liittymään yhden jaetun mallin ekosysteemiin ilman teknisiä esteitä. Toisaalta, ilman merkittäviä muutoksia nykyiset BIM sovellukset eivät ole yhteensopivia. Testiajossa suorituskyky oli hyväksyttävä, mutta todellisuudessa mallien koko sekä sovellusten ja käyttäjien lukumäärä ovat paljon suurempia. Tutkimus osoitti, että konversiovapaa yhden jaetun mallin menetelmä voi olla seuraava BIM-kehityssuunta ja vaihtoehto nykyisille tiedonsiirtoratkaisuille, jotka käyttävät erillisiä tiedostoja, konversioita ja linkkejä
15

Linder, Viktor. "BIM - Tillämpning och effekt i byggprocessens olika skeden." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-84204.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Byggbranschen står inför stora förändringar i framtiden i och med att BIM (Building Information Model/Modelling/Management) successivt introduceras inom området. BIM innebär en förändrad arbetsmetod som kan ge förbättrade möjligheter att minska tidsåtgången och omarbetningar i ett förprojekteringsskede samt skapa ett effektivare projekterings- och produktionsskede med färre fel. BIM är ett relativt nytt sätt att inom byggbranschen bedriva projekt och innebär en förändring för olika skeden inom byggprocessen vilket påverkar inblandade parter. Syftet med denna studie är att ta reda på hur Peab i Kiruna på bästa sätt kan nyttja möjligheterna som finns med BIM samt redogöra för några av de förändringar BIM kan innebära jämfört med nuvarande arbetsmetoder. En teoretisk del beskriver BIM och dess för- och nackdelar inom olika områden samt vilka hinder det finns för arbetsmetoden. Ett resultat baserat på den teoretiska delen förklarar att BIM i dagsläget främst bör nyttjas av Peab i Kiruna i ett anbudsskede, där ett förfrågningsunderlag görs om till en BIM-modell. Detta kan leda till underlättande för företaget att se fel i förfrågningsunderlag samt att utförande av mängdavtagning och kalkylering kan ske på ett enklare sätt. Detta kräver dock att företaget har kompetensen som krävs för att kunna skapa BIM-modeller samt att de bekostar licenser förnödvändiga programvaror. Vidare förklaras det i rapporten hur tillämpning av BIM i ett anbudsskede kan ske, via ett praktiskt genomförande där möjligheterna och nyttorna med att utföra mängdavtagning av en BIM-modell beskrivs. Mängdavtagningen utfördes i CAD-programmet Autodesk Revit där en byggnad användes som modell. Genom att i programmet använda lämpliga funktioner, kan valfria nyttovärden erhållas från valfritt material i byggnaden. Om Peab kan använda BIM på detta sätt i sin arbetsmetod kommer det att underlätta för företaget vid framtida projekt och kan möjligtvis även utgöra ett första steg för en implementering av BIM i dess projekterings- och produktionsskede.
The construction industry is facing major changes in the future, as a result of BIM (Building Information Model/Modelling/Management) that gradually makes its arrival. BIM implies a changed working method that can provide improved possibilities to reduce time and rework in the pre-planning stage and create a more efficient design and production stage with fewer errors. BIM is a relatively new way of conducting projects in the construction industry and implies a change in different sections of the building process, which affects involved parts. The purpose of the study is to find out how Peab in Kiruna in the best possible way can take advantage of the potential of BIM, also describe some of the changes BIM can mean compared to current practices. A theoretical part describes BIM and its advantages and disadvantages in different areas and explains the barriers that exist for the working method. A result based on the theoretical part explains that BIM today primarily should be utilized by Peab in Kiruna in a tender stage where a contract document is converted to a BIM model. While this may help them to see errors in the specifications, they also can perform quantity takeoff and calculation in an easier way. However, this requires that the company has the expertise necessary for creating BIM models and that they pay for licenses for the essential software. Further, it is explained in the report how this can be done, by a practical implementation carried out where an outlining of the potential and benefits of performing quantity takeoff of a BIM model is shown. The quantity takeoff is performed in the CAD software Autodesk Revit, where a building was used as a model. By using suitable functionsin the program, optional utility values can be obtained from optional materials in the building. If Peab can use BIM in this manner in their working method, it will make it easier for them in future projects and could even be a first step for an implementation of BIM in their design and production stage.
16

Bengtsson, Jonas, and Mikael Grönkvist. "Performing Geographic Information System Analyses on Building Information Management Models." Thesis, KTH, Geodesi och satellitpositionering, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-208922.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
As the usage of both BIM (Building Information Modelling) and 3D-GIS (Three-Dimensional Geographic Information Systems) has increased within the field of urban development and construction, so has the interest in connecting these two tools.  One possibility of integration is the potential of visualising BIM models together with other spatial data in 3D. Another is to be able to perform spatial 3D analyses on the models. Both of these can be achieved through use of GIS software. This study explores how integration of BIM and GIS could look. The goal was to perform typical GIS analyses in 3D on BIM models. Previous research points towards some success within the field through use of the indicated standard format for each tool – IFC (Industry Foundation Classes) for BIM and CityGML (City Geographic Markup Language) for GIS. Transformation between the formats took place through use of the BIM software Revit, the transformation tool FME and the GIS software ArcGIS. A couple of reviewed applications of GIS analyses were chosen for testing on the converted models – indoor network analysis, visibility analysis and spatial analysis for 3D buildings. The input data in the study was several BIM models, both models created for real-life usage and others that only function as sample data within the different software. From the results of the practical work it can be concluded that a simple, automated and full-scale integration does not seem to be within reach quite yet. Most transformations between IFC and CityGML failed to some extent, especially the more detailed and complex ones. In some test cases, the file could not be imported into ArcGIS and in others geometries were missing or existing even though they should not. There were also examples where geometries had been moved during the process. As a consequence of these problems, most analyses failed or did not give meaningful results. A few of the original analyses did give positive results. Combining (flawed) CityGML models with other spatial data for visualisation purposes worked rather well. Both the shadow volume and sightline analyses did also get reasonable results which indicates that there might be a future for those applications. The obstacles for a full-scale integration identified during the work were divided into four different categories. The first is BIM usage and routines where created models need to be of high quality if the final results are to be correct. The second are problems concerning the level of detail, especially the lack of common definitions for the amount of details and information. The third category concerns the connection between local and global coordinate systems where a solution in form of updates to IFC might already be in place. The fourth, and largest, category contains those surrounding the different formats and software used. Here, focus should lie on the transformation between IFC and CityGML. There are plenty of possible, future, work concerning these different problems. There is also potential in developing own tools for integration or performing different analyses than those chosen for this thesis.
I takt med den ökade användningen av både BIM och 3D-GIS inom samhällsbyggnadsprocessen har även intresset för att sammanföra de två verktygen blivit större. En möjlighet med integration är potentialen att visualisera BIM-modeller tillsammans med andra geografiska data i 3D. En annan är att kunna genomföra rumsliga 3D-analyser på modellerna. Båda dessa går att utföra med hjälp av GIS-programvara. Denna studie utforskar hur en integration mellan BIM och GIS kan se ut. Målet är att genomföra typiska GIS-analyser i 3D på BIM-modeller. Tidigare forskning pekar mot vissa framgångar inom området genom att arbeta med det utpekade standardformatet för respektive verktyg – IFC för BIM och CityGML för GIS. Transformation mellan formaten skedde med hjälp av programvarorna Revit, FME och ArcGIS. Ett par framhållna tillämpningar av GIS-analyser valdes ut för tester på de konverterade modellerna – nätverksanalyser inomhus, siktanalyser och rumsliga analyser för 3D-byggnader. Som indata användes flera olika BIM-modeller, både sådana som tillverkats för faktisk användning och modeller som skapats för att användas som exempeldata inom programvarorna. Utifrån resultaten från det praktiska arbetet kan konstateras att en enkel, automatiserad och fullskalig integration mellan verktygen verkar ligga en bit in i framtiden. De flesta transformationerna mellan IFC och CityGML misslyckades i någon aspekt, speciellt de mer detaljerade och komplexa. I vissa testfall kunde filen inte importeras i ArcGIS, i andra saknas eller existerar oväntade geometrier även om importen lyckats. Det finns också exempel där geometrier förflyttats. Som en konsekvens av dessa problem kunde de flesta 3D-analyser inte genomföras alls eller lyckades inte ge betydelsefulla resultat. Ett fåtal av de ursprungliga analyserna gav dock positiv utdelning. Att kombinera (felaktiga) CityGML-modeller med annan rumslig data fungerade förhållandevis väl ur ett visualiseringssyfte. Både skuggvolymsanalysen och framtagandet av siktlinjer från byggnaderna gav någorlunda korrekta resultat vilket indikerar att det kan finnas en framtid gällande de tillämpningarna. Hindren för en fullskalig integration som identifierades genom arbetet delades upp i fyra olika kategorier. Den första är BIM-användning där hög kvalitet på de skapade modellerna är viktigt för korrekta slutresultat. Den andra är detaljeringsgraden där avsaknaden av gemensamma definitioner för detaljeringsgraderna ställer till problem. Den tredje kategorin är koordinat- och referenssystem där en lösning på kopplingen mellan lokala och globala system redan kan finnas på plats i en av de senare utgåvorna av IFC-formatet. Den sista och största kategorin är problematiken kring just format och programvaror där mer arbete på översättningen mellan IFC och CityGML kommer att krävas. I framtiden finns det gott om arbete att göra med dessa olika problem. Det finns också potential att utveckla egna verktyg för integrationen eller att ägna sig åt att göra andra analyser än de som valdes ut i den här studien.
17

Grann, Blane. "A Building Information Model (BIM) Based Lifecycle Assessment of a University Hospital Building Built to Passive House Standards." Thesis, Norges teknisk-naturvitenskapelige universitet, Institutt for energi- og prosessteknikk, 2012. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-18849.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This thesis undertook a whole building lifecycle assessment of a university hospital building in Trondheim, Norway designed to passive house standards. The delivered energy for electricity and heating was estimated to be 122 kWh/m2. Impacts outside the energy used during the operational phase of the building were significant including 30% of greenhouse gas emissions, 41% of terrestrial acidification and 43% of particulate matter formation. Normalized to the number of staff, the building emits roughly 0.75 tonnes of CO2 equivalents per year over the 50 year life of the building.
18

Ericson, Robert, and Henriikka Ruuti. "BIM: Revit-content : Modellering och hantering." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102011.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
I och med införandet av BIM-metodiken inom byggbranschen, har flera frågor fötts kring reformationen av arbetsmetodiken inom projekteringsprocessen. En av dessa är frågan om content; grafik - och informationsinnehållet i en BIM-modell.  Rapportens syfte har varit att, via analys av befintliga contenthanteringstrategier, frambringa rekommendationer för utformande av konsekventa arbetsmetodiker inom Revit-projekt. Mål- sättningen har varit att rekommendationerna skall bidra till förstärkning och vidareutveckling av ett företags hantering av Revit-content.  Arbetet inleddes med en serie intervjuer på arkitektföretaget Tengboms Stockholmskontor. Intervjuerna utfördes med representanter för olika Revit-baserade projekt. Av dessa valdes fyra projekt ut till mer detaljerade fallstudier, där syftet var att kartlägga vilka strategier Tengbom tillämpat i sina Revit-projekt. Parallellt med intervjuerna, utfördes en litteraturstudie där information om befintliga contenthanteringsstrategier inom övriga företag och organisationer, kunde förvärvas och analyseras. Resultatet av fallstudierna på Tengbom jämfördes med de teorier som framkommit via litteraturstudien. För- och nackdelar med olika strategier inom contenthantering analyserades med utgångspunkt i olika aspekter gällande utbildning inom Revit-projektering, samt modellering och hantering av content. Slutsatsen blev att Tengbom haft den i särklass mest hållbara strategin inom den inledande fasen av företagets BIM-implementering. Flera fördelar kunde även identifieras i de övriga contenthanteringsstrategierna som analyserats. Dessa kom att utgöra en gedigen grund för de vidare rekommendationer som arbetet resulterade i.
The introduction of the BIM-methodology in the building industry has awoken several questions regarding the reformation of work methods in the project planning process. One is the question about content; graphics and information inside a Building Information Model. The purpose of this report has been to analyze existing content managing strategies, in order to create recommendations for the forming of consequent work methods in Revit projects. The goal has been to adjust the recommendations for companies willing to further develop internal work methods in the field, particularly concerning the management of Revit content. Several interviews with representatives from different Revit projects at the architectural firm Tengbom in Stockholm were conducted. Four of the Revit projects, were chosen for a more detailed case study, in order to acquire information about the company’s strategies concerning content management. Simultaneously, a literary study was executed, through which information about existing content management strategies in other companies and organizations could be obtained and analyzed. The results of the case studies at Tengbom were compared with theories acquired from the existing strategies in content management. Benefits and disadvantages were analyzed, based on different aspects concerning modeling and management of Revit content and also the education of Revit use. The report concludes that Tengbom has applied the most sustainable strategies in the initial part of the company’s BIM implementation process. Several benefits were also found in the existing strategies, analyzed in the literary study. Together, the conclusions formed a solid base for further recommendations, made as a result of the study in this report.
19

Jansson, Simon, and Markus Strok. "Virtuellt byggande." Thesis, Linköping University, Department of Science and Technology, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-11915.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:

Kostnaderna att bygga blir allt högre, man tror att byggkostnaderna väntas öka med 25 procent inom de närmaste tre åren. Mest stiger byggherrekostnaden och kostnaderna för byggmaterial och inget tyder på att detta kommer mattas av. Därför ligger det på byggföretagen att effektivisera och optimera projekteringen för att sänka kostnaderna. För att sänka produktions- och projekteringskostnaderna vill byggbranschen gå från hanteringen av traditionella 2D-ritningar till intelligenta 3D-modeller, BIM – Byggnads Informations Modell.

BIM är en metod för att lagra komplett information om en byggnad i en datormodell. Modellen integrerar all geometrisk modellinformation, de funktionella kraven och möjligheterna samt uppförandeinformationen i en enda beskrivning av ett byggnadsprojekt sett över dess livscykel.

Vid arbete med ett BIM-projekt använder man en delad projektmodell som alla inblandade parter kan ta del av och jobba med. Med hjälp av denna BIM-baserade arbetsmetod arbetar bland annat byggnadskonstruktörer, vvskonstruktörer, elkonstruktörer och fastighetsförvaltare med samma modell som arkitekten.

En av de största fördelarna med att använda BIM vid projekteringen är enkelheten att ändra objekt och dess egenskaper. Eftersom alla i projekteringen jobbar med samma modell av byggnaden ser respektive projektör ändringen. Det man strävar efter är att alla inblandade parter skall jobba med modellen från en gemensam server, för att kunna optimera projekteringen med avseende på tid, åtkomst av ritningar och förenklad korrespondens.

Syftet med vårt examensarbete är att skaffa fördjupad kunskap om BIM, både teoretiskt och praktiskt. Den praktiska delen bestod i att konstruera en BIM-modell av en byggnad. De tillämpningar vi gjort på modellen är en mängdberäkning som vi utfört i ArchiCAD, och en energiberäkning i tilläggsprogrammet Vipweb.


The costs to build is steadily increasing, one believes that the construction costs will increase with 25 percents within the next three years. The cost that will increase the most is proprietor cost and the costs for construction materials, and nothing indicates that this will weak of. Therefore it lies on the construction companies to become more effective and to optimize the project planning in order to lower their costs. To be able to lower the cost for production and project planning the construction industry have to go from the handling of traditional 2D-drawings to intelligent 3D-models, BIM - Building Information Model.

BIM is a method in order to store complete information about a building in a computer model. The computer model integrates all geometric model information, the functional requirements and possibilities and the behavior information, in only one description of a building project seen over its life cycle.

While working with a BIM-project one uses a divided project model that all involved parties can take part of and work with. With the aid of this BIM-based work method construction engineers, electrical engineers, heating- ventilation- and sanitation engineers and real estate managers are able work with the same model as the architect.

One of the biggest advantages with using BIM at project planning is the simplicity to change items and its properties. Since everyone in the project planning is working with same model of the building they can all see the changes that have been made. What one strives for is that all involved parties will work with the model from a common server, in order to optimize the project planning with the focus on time, accessibility of drawings and simplified correspondence.

The aim with this degree project is to get deepened knowledge about BIM, both theoretical and practical. The practical part consisted in designing a BIM-model of a building. We have used the model to do an amount calculation on the models building parts. This we carried out in ArchiCAD. We also made an energy calculation in the add-on program Vipweb.

20

Fuller, Pierre (Pierre Henri). "A simplified software architecture for self-updating Building Information Models (BIM)." Thesis, Massachusetts Institute of Technology, 2009. http://hdl.handle.net/1721.1/55155.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2009.
Cataloged from PDF version of thesis.
Includes bibliographical references (p. 61-63).
Building Information Modeling (BIM) is an emerging software technology that is revolutionizing the architecture, engineering, and construction (A/E/C) industry. BIM technology employs "object-based 3D models-containing the physical and functional characteristics of a facility-that serve as a repository for lifecycle information in an open, interoperable format" [1]. The major difference between BIM and Computer-Aided Design/Drafting (CADD) is that the former includes geometry and a plethora of building information while the latter includes only geometry. BIM utilization in the AEC industry has increased due to 1) BIM tools increasing productivity in design tasks; 2) the increasing number of private and government agencies that have instituted BIM requirements; 3) the pervasive use of computer analysis and simulations models; 4) the benefits of BIM as lifecycle management tool. Current literature shows trends of a transition from a "passive"-static model-based-approach to an "active"-dynamic model-based-approach. The active approach requires the integration of BIM with sensors to create "self-updating" building models. Previous research introduces the concept of a self-updating building model ([2], [31, [41). These systems involve complex software architecture and may perpetuate the problem of software interoperability. This thesis explores the following question: May a similar system be created to synthesize dynamic sensor data while improving upon previous research and simplifying the software architecture? The author describes a prototype system, called LiveBuild, which integrates commercial BIM software with other off-the-shelf software components to create a self-updating building model. LiveBuild is the first self-updating building model that operates as an extension to existing commercial BIM software. Therefore, the transition from static to active building models is as simple as installing a plug-in. LiveBuild may serve as the basis for future research in self-updating building by providing simplified system that is well integrated with state-of-the art commercial design software. Likewise, the prototype is applicable for professional practice by allowing firms to use their existing BIM software to perform "pilot projects" with self-updating technology. The current prototype supports an interface with single commercial BIM software (Autodesk Revit 2009) product however future prototypes may extend both the functions and interfaces for other BIM software.
by Pierre Fuller.
S.M.
21

Curan, Selma, and Jesper Hansen. "SPEGLAR SVERIGES LÅGA GRAD AV DIGITAL UTVECKLING INOM BYGGSEKTORN ANVÄNDANDET AV BIM I PROJEKTERINGSSKEDET? : EN UNDERSÖKNING OM DAGENS ANVÄNDNING AV BIM I PROJEKTERINGSSKEDET." Thesis, Jönköping University, Tekniska Högskolan, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-54063.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Purpose: There are clear benefits with BIM in the design phase, but also barriers and challenges that limit the implementation of BIM in the design phase. At present, there are no requirements for BIM in Sweden, which differs from several international countries. The aim of the report is to examine the current use of BIM in the design phase in Sweden. The report is executed in hope of contributing to an increased BIM integration in the design phase and contribute with increased knowledge about how the development of BIM can increase. Method: The research method in this study is a survey. To achieve the aim of the report and answer the research questions, data are collected via a questionnaire that is covered by both quantitative and qualitative questionnaire questions in combination with a literature study. The questionnaire has been sent out to architects, designers and constructors at various engineering- and architectural companies in Sweden. Findings: Today's use of BIM in the design phase is assumed to be high and most of the participants in the survey are aware of the benefits of BIM and how it can make the workflow in the design phase more effective. Factors that prevent the implementation of BIM are assumed to go hand in hand with factors that contribute to an increased use of BIM and thus need to be considered for the use of BIM to increase. Implications: Sweden's low degree of digital development in the construction sector does not reflect the current use of BIM in the design phase at architectural- and engineering companies in Sweden. Common uses that architect- and engineering companies apply with BIM are collision controls, information management and visualization. By increasing knowledge and informing customers about the benefits of BIM, the use of BIM is assumed to increase. A further recommendation that assumes increased use of BIM is a requirement for BIM in public construction in Sweden. Limitations: The report is limited to examining the use of BIM in the design phase and only examines architectural- and engineering companies in Sweden. The respondents consist of architects, designers and constructors. The results are representative for the report but cannot be applied to all architectural- and engineering companies in Sweden as the selection method is not generalizable.
Syfte: Det finns tydliga fördelar med BIM i projekteringen men även hinder och utmaningar som begränsar implementering av BIM i projekteringsskedet. I Sverige finns i dagsläget inga krav på BIM vilket skiljer sig från flera internationella länder. Målet med rapporten är att undersöka dagens användning av BIM i projekteringsskedet i Sverige. Studien genomförs i förhoppning om att bidra till en ökad BIM-integrering i projekteringsskedet samt bidra med ökad kunskap om hur utvecklingen av BIM kan drivas framåt. Metod: Forskningsmetoden i denna undersökning är en survey. För att besvara rapportens frågeställningar och uppnå målet sker datainsamling via en enkät som omfattas av både kvantitativa och kvalitativa enkätfrågor i kombination med litteraturstudie. Enkäten har skickats ut till arkitekter, projektörer och konstruktörer på olika ingenjörs- och arkitektföretag runt om i Sverige. Resultat: Användningen av BIM i projekteringsskedet antas vara hög i dagsläget och majoriteten av medverkande i undersökningen känner till fördelarna med arbetssättet och hur det kan effektivisera arbetsgången i projekteringsskedet. Faktorer som hindrar implementering av BIM antas gå hand i hand med faktorer som bidrar till en ökad användning av BIM och behöver därmed beaktas för att användningen av BIM ska öka. Konsekvenser: Sveriges låga grad av digital utveckling inom byggsektorn speglar inte användandet av BIM i projekteringsskedet på arkitekt- och ingenjörsföretag i Sverige i dagsläget. Vanligt förekommande användningsområden med BIM i projekteringsskedet bland arkitekt- och ingenjörsföretag är kollisionskontroller, samgranskning, informationshantering och visualisering. Genom att öka kunskapen om BIM i beställarledet och informera om nyttan med arbetssättet antas användningen av BIM stiga. Vidare rekommendation som antas leda till en ökad användning av BIM är en kravställning på arbetssättet inom offentligt byggande i Sverige. Begränsningar: Rapporten är avgränsad till att undersöka användningen av BIM i projekteringsskedet och undersöker endast arkitekt- och ingenjörsföretag runt om i Sverige. Enkätrespondenterna utgörs av projektörer, arkitekter och konstruktörer. Resultaten är representativa för undersökningen men kan inte tillämpas på alla arkitekt och ingenjörsföretag i Sverige eftersom urvalstekniken inte är generaliserbar.
22

Ruixue, Liu, and Zhong Yicheng. "Analysis of BIM and GIS integration: results from literature review and questionnaire." Thesis, Jönköping University, Tekniska Högskolan, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-53310.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Abstract. BIM (Building Information Model) and GIS (Geographic Information System) have been rapidly developed in recent years due to their respective strengths in projects. But these two systems are totally different on focus, reference systems and data storage. With the increasing discussion about integrated BIM-GIS and technologies development, application fields, solutions and challenges are continuously updated and developed. However, the actual application of BIM and GIS integration has not been better implemented because it is restricted to certain extent by different regions, different projects and certain technical constraints. To better explore the integration of BIM and GIS, this paper reviews the development progress of BIM and GIS integration, the exiting integration methods at data level, process level and application level, and the remaining integrated challenges through the studies of 43 relevant research articles, and analyzes the actual situation of integration application through the results of questionnaire. Based on the literature review and a questionnaire, there are still technical problems in BIM-GIS integration including transformation accuracy, semantic simplification and geometric information filtering and so on, and integrated BIM-GIS is currently rarely used in the AEC industry. But due to the benefits of the integration, there is no doubt that integrated BIM-GIS system can bring significant value to the AEC industry.
23

Atto, Andreas. "Byggprocessen i förändring - Visionen om BIM." Thesis, Linköpings universitet, Institutionen för teknik och naturvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-69576.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Det primära syftet med detta examensarbete kan sägas vara att skapa en uppfattning hos Skanska Väg & Anläggning Sydost, som är initiativtagare till detta examensarbete, om vad BIM (Building Information Model) är och hur det lättast kan implementeras i deras arbetsprocesser. Det skulle vara omöjligt att täcka in alla aspekter av BIM under den korta tid som funnits till förfogande och inom ramen för detta examensarbete, därför har de aspekter som ansetts vara viktiga för företaget samt författaren lyfts upp för utredning. För att kunna nå dit har examensarbetet till uppgift att kartlägga och synliggöra de skillnader som finns mellan dagens byggprocess och BIM (Building Information Model) och utifrån det föreslå möjliga sätt att implementera denna arbetsmetod hos Skanska Väg & Anläggning Sydost. I examensarbetets första kapitel ges en kort introduktion och bakgrund till hur byggprocessen förändrats under tidens gång. Ett syfte och en frågeställning formuleras och en avgränsning för examensarbetets omfattning görs. I examensarbetets andra kapitel ges den teoretiska bakgrunden till dagens byggprocess. Viktiga aspekter av dagens byggprocess lyfts fram och förklaras. Därefter följer en presentation av begreppet BIM och vad det innebär. Därefter görs en kort genomgång för hur arbetet med BIM ser ut hos Skanska Sverige AB och generellt i byggbranschen. I examensarbetets tredje kapitel presenteras hur BIM används idag på vägprojekt utanför Katrineholm i ett projekt kallat för Förbifart Katrineholm där BIM tillämpats i viss utsträckning. Skillnaderna som finns mellan dagens byggprocess och BIM samt de för- och nackdelar som kan konstateras hos BIM i relation till dagens byggprocess presenteras. I examensarbetes fjärde kapitel besvaras frågeställningarna och resultatet analyseras samt diskuteras ur viktiga aspekter för byggande, för att i det femte kapitlet komma med konkreta förslag på hur en implementering av BIM i Skanska Väg & Anläggning Sydosts arbetsprocesser kan se ut.
The primary purpose of this thesis can be said to be to create a perception at Skanska Civil Southeast, which is the initiator of this thesis, on what BIM (Building Information Model) is and how it can most easily be implemented in their work processes. It would be impossible to cover all aspects of BIM in the short amount of time that has been available and in the context of this thesis, therefore, the aspects that were deemed important to the company and to the author has been picked up for investigation. To achieve this, the task of the thesis is to identify and highlight the differences between today's construction process, and BIM (Building Information Model) and from that suggest possible ways to implement this way of working to Skanska Civil Southeast. The thesis first chapter provides a brief introduction and background to the construction process and how it has changed over time. A purpose and questions on which the thesis is being based on are formulated and a boundary for the thesis is done. The thesis second chapter provides the theoretical background to today's construction process. Key aspects of today's construction process are highlighted and explained. This is followed by a presentation of the concept of BIM and what it means. After that, a brief review of how the work with BIM looks at Skanska Sweden AB and in the construction industry generally. The thesis third chapter presents how BIM is currently used on a road project just outside of Katrineholm in a project called Förbifart Katrineholm where BIM is being applied to some extent. The differences that exist between today’s construction process and the BIM and the pros and con that can be observed in BIM relative to today's construction process is presented. In the thesis fourth chapter answers the questions and the results are analyzed and discussed on important aspects of construction, to, in the fifth chapter make concrete proposals on how an implementation of BIM in Skanska Civil Southeast work processes may look like.
24

Pejchal, Mojmír. "Přepracování dokumentace stavby do modelu pro BIM." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2021. http://www.nusl.cz/ntk/nusl-444255.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The motive of the diploma thesis is the redesign of the original project documentation of an block of flats into an information model for administration and maintenance. The first part deals with modeling the building according to the drawing part of the documentation in the Autodesk Revit. The second is about the outputs of the information model and its use in building management. It also includes an evaluation of the effectiveness of redesign in relation to the detail of the model and its link to the original drawing documentation.
25

Abbasnejad, Behzad. "Building information modelling adoption and implementation in construction firms: A multi-stage model." Thesis, Queensland University of Technology, 2018. https://eprints.qut.edu.au/119686/1/Behzad_Abbasnejad_Thesis.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This research developed a stage-based model for the management of building information modelling (BIM) implementation in construction organisations based on the theories of business process change management, innovation management, and IT implementation. The model identified five distinct stages: awareness, consideration, readiness assessment, deployment, evaluation and improvement plan and their related enablers, which are aligned with the organisational goals and objectives as a precursor to the successful and sustained implementation of BIM. Comparative case studies of five construction firms were used to test the applicability of the model within the broader spectrum of the construction supply chain in Australia.
26

Hahne, Johannes, and Linnea Karlsson. "Vägen mot en integration av BIM och Internet of Things : En modell över fördelar och förutsättningar vid användning av Internet of Things i BIM." Thesis, Uppsala universitet, Byggteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-355791.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This thesis considers the integration of BIM and IoT in the building process of offices. The thesis is hopefully going to create knowledge about BIM and IoT and describe what needs to be done to carry out an integration.The planning of offices today consists of the use of BIM and a lot of smart solutions. But what are the benefits from an integration of BIM and Internet of Things and how can this be used throughout the building process? New and smart solutions are invented all the time and although not all are possible to use in everyday offices, some can already be of great use. For the future there is a great need for smart and sustainable solutions that helps to conserve energy but at the same time are economically sustainable. This needs to become a part of our everyday to help conquer one of our times biggest challenges, the environmental issue. This thesis highlights the advantages, disadvantages and requirements of an integration of BIM and IoT. It concerns the technology behind IoT and what the future has to offer.The result of the written thesis is a model that describes how an integration of BIM and IoT can be carried out during the different stages of the building process. The model is going to work like a cycle where information from sensors constantly flows to the BIM model during the entire building process. Information and experiences gained from the different stages of the building process can be used to evaluate the construction and its different systems and the experience gained is used in the next project.An integration will be hard to do on a big scale due to different factors. The technology is here but the pathway and standards for it are not.
27

Joblot, Laurent. "Contribution à la mise en œuvre du BIM en rénovation : Proposition d'un Modèle de Maturité BIM spécifique." Thesis, Paris, ENSAM, 2018. http://www.theses.fr/2018ENAM0039/document.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Cette recherche a pour but de répondre à deux impératifs : travailler pour un secteur d’activité porteur économiquement, mais peu étudié scientifiquement : le domaine de la Rénovation, et proposer aux acteurs de ce secteur des outils d’accompagnement forts pour leur permettre de réussir leur transition numérique, enjeu majeur du XXIe siècle. L’état de l’art initial a démontré que, dans un contexte lié à la diffusion d’un Système d’Information tel que le BIM, il était indispensable de s’appuyer sur des leviers contribuant à son implantation : les Facteurs Clés de Succès, les fondamentaux du management de projet, la rédaction de Conventions BIM, l’Approche Intégrée de Projet et enfin les Modèles de Maturité. Pour s’assurer de l’adéquation entre ces différents leviers et les spécificités de la Rénovation, une enquête a été réalisée auprès d’un panel représentatif des petites entreprises qui le composent majoritairement. Elle a permis de confirmer l’état peu avancé de ce secteur dans la transition numérique en raison de la taille des structures elles-mêmes et de situations économiques réduisant souvent l’horizon de projection. Les acteurs ne sont, par ailleurs, pas toujours conscients de la nécessité du changement (se satisfaisant généralement de la 2D et de procédés artisanaux) et sont donc peu enclins à investir dans des solutions numériques telles que le BIM. En dépit des réticences qui ont pu être exprimées, la plupart des acteurs ont toutefois bien conscience que pour tirer parti de la transition au lieu de la subir, il faut qu’ils puissent être dotés d’outils d’accompagnement spécifiques à leurs usages et pratiques. Un référentiel permettant de mesurer leur maturité et ensuite de définir de façon réaliste leurs propres objectifs de développement : « BIM Maturity Model For Renovation » ou BiM²FR a donc été conçu. Le format choisi et la simplicité voulue de mise en œuvre devraient permettre aux petites entreprises de facilement caractériser leur situation et d’identifier leurs points faibles et forts, puis d’élaborer les grandes lignes de plans d'action individuels et appropriés à leurs activités. Les facteurs clés de succès étudiés et intégrés en filigrane dans le BiM²FR sont les marqueurs et gages de succès qui permettront aux entreprises de progresser au cours de la mise en œuvre du BIM. Pour élargir la portée de ce travail, une interface WEB libre permettant aux entreprises d’effectuer leur diagnostic de maturité BIM, a été développée. Le site www.BiM2FR.eu, outre l’aide qu’il peut apporter aux entreprises, offre, par l’intermédiaire des données collectées et échangées, un grand nombre de perspectives de recherches
This research aims to answer two imperatives: 1) promote an economically promising sector, Renovation, that has not been subject to much scientific study; and 2) offer companies in this sector useful tools to help them succeed in their digital transition, a major challenge of the 21st century. When it comes to disseminating an Information System such as BIM, it is essential to use levers that enhance its implementation: the Critical Success Factor, fundamentals of Project Management, drafting BIM Execution Plans, an Integrated Project Delivery approach and Maturity Models. To ensure the right fit between these different levers and the specific needs of the Renovation segment, we conducted a survey with a representative panel of small enterprises, predominant in this sector. This survey confirmed that the sector is still in the early days of digital transition due to the small size of companies and economic situations that often reduce visibility and the ability to make long-term investment decisions. Small renovation firms are not always aware of the need for change (they are generally satisfied with 2D drawings and artisanal processes) and are therefore reluctant to invest in digital solutions such as BIM. In spite of this, most stakeholders are aware that in order to benefit from the transition or risk being left behind, they must find support in tools specific to their uses and practices. To measure their maturity and then realistically define their own development objectives, we therefore developed a "BIM Maturity Model for Renovation" or BiM²FR. The format and ease of implementation should enable small enterprises to identify their situation, emphasize their strengths and weaknesses, and then outline individual action plans suited to their activities. The Critical Success Factors analyzed and presented within BiM²FR should guarantee successful progress as companies implement BIM. In order to broaden the scope of this work, we created a free web interface for companies to make their own BIM maturity diagnosis. The site www.BiM2FR.eu, in addition to helping these companies, offers us, through the data collected and exchanged, a large number of research opportunities
28

Avila, Mary-Alice. "Programming and Conceptual Design Using Building Information Modeling." DigitalCommons@CalPoly, 2009. https://digitalcommons.calpoly.edu/theses/38.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This thesis explores the benefits of using Building Information Modeling (BIM) during the programming and conceptual design phase of a project. The research was based on a case study undertaken dealing with the decisions and assumptions made during the design phases of the Center for Science at Cal Poly San Luis Obispo. The project team used a traditional approach to project plan development. The finding of this study was that the project process would have greatly benefited utilizing BIM tools and a collaborative team approach in the programming and conceptual design phase. Because decisions made early in the project have enormous implications to aesthetics and cost, the increase in analysis of design options afforded by the use of BIM tools would have minimized inaccurate, incomplete and unreliable information, and allowed the design team to work in a more efficient, collaborative manner transmitting through all phases of the project.
29

Oliveira, Marina Rodrigues de. "Modelagem virtual e prototipagem rápida aplicadas em projeto de arquitetura." Universidade de São Paulo, 2011. http://www.teses.usp.br/teses/disponiveis/18/18141/tde-07042011-110243/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
O presente trabalho de mestrado estuda a aplicação de tecnologias e ferramentas de modelagem virtual e prototipagem rápida em projeto de Arquitetura, abordando casos em escritórios brasileiros e instituições de ensino que utilizam laboratórios de prototipagem rápida no desenvolvimento de projeto. A partir da revisão bibliográfica abrangendo processo de projeto, projeto paramétrico, modelagem virtual, Building Information Model(ing), prototipagem rápida, buscou-se desenvolver a ligação do trabalho acadêmico desses temas com a prática e o desenvolvimento de projeto a fim de estudar as interferências, potencialidades e desdobramentos que tais tecnologias podem oferecer no desenvolvimento de projeto de arquitetura. Dois estudos de campo foram desenvolvidos para observar como as tecnologias estão influenciando a prática de projeto: através do estudo de campo descritivo junto a cinco escritórios de arquitetura do estado de São Paulo, levantaram-se os diversos usos que têm sido feitos dessas ferramentas na prática de projeto. Utilizou-se também o estudo de campo exploratório que contou com três instituições de ensino de excelência que utilizam métodos atuais com inserção de ferramentas de modelagem virtual paramétrica junto aos laboratórios de Fabricação Digital da FEC/UNICAMP, Brasil, AA, Londres, Inglaterra e UTL, Lisboa, Portugal observou-se as mudanças na prática do ensino de projeto. Conclui-se que a inserção dessas tecnologias no ensino e na prática de projeto tem um papel transformador na forma de se projetar envolvendo mudança nas práticas decisórias, simulação, experimentação, representação de projeto, geração de documentos, colaboração entre projetistas, etc. Porém, esses grupos acadêmicos, que utilizam a tecnologia em prol da concepção e produção de uma arquitetura contemporânea, não refletem a realidade da prática profissional pesquisada onde os escritórios utilizam software com conceito BIM isoladamente já que escritórios de projetos complementares não utilizam a mesma tecnologia.
This master research work studies the employment of tools like virtual modeling and rapid prototyping on architectural designs trough educational institutions and commercial offices case studies from that use Rapid Prototyping Laboratories during the design process. Based on a literature review regarding design process, parametric design, virtual modeling, Building Information Model(ing) and rapid prototyping, connection between academic knowledge and potential design were performed in order to study the potentials, interferences, and future these technologies can offer to architectural design process. Two field studies were employed to investigate how technologies are influencing the design projects. The descriptive work presents the professional practice reality in São Paulo, Brazil, through interviews with five architectural design offices that are using these tools in different ways during the design project. The exploratory study was performed at three schools of excellent: University of Campinas, Brazil, Architectural Association in London, UK and Technical University of Lisbon, Portugal where the methodology employs parametric virtual modeling technology, giving evidence of changes in design teaching using the Digital Fabrication facilities. It concludes that the use of these technologies on design project teaching and practice a hanger the way of design, involving decision-making, simulation, design drawings, documents generation and collaboration between designers. However the academic research groups that use the technology for contemporary design conception and production do not represent the professional practice reality once they are using the BIM software on an isolated way given that complementary design offices don\'t have access to the same technology.
30

Kärnbo, Josua. "Svensk Byggindustri och Critical Success Factors : En lokal diskussion kring kritiska moment vid implementering av BIM." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-383266.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
BIM (Building Information Modelling) är idag ett exponentiellt ökande område inom byggindustrin, som inte visar några tecken att sakta ner. I takt med att BIM som koncept och process används i större omfattning både internationellt och nationellt, dyker problem dock oundvikligen upp vid dess implementering. De faktorer som orsakar dessa problem har i detta examensarbete givits termen CSF, ett begrepp som hittills ej använts inom svensk byggindustri. CSF står för Critical Success Factors, vilket innefattar det som i svenska arbeten annars till exempel kallats ”kritiska faktorer”, ”hindrande faktorer”, ”bromsande faktorer” etc. Syftet med detta arbete är därmed att utforska både begreppet CSF och dessa faktorer, samt deras betydelse och relevans. Utifrån tidigare studier, främst utländska, identifierades och introducerades termen CSF samt 14 sådana punkter, vilka gavs en utförligare beskrivning. För att ge dessa 14 punkter en lokal anknytning, intervjuades fem personer i svensk byggindustri med olika erfarenheter av BIM. Det framträdde då klara likheter mellan tidigare diskussion kring de identifierade punkterna och intervjuresultaten. De centrala tankar som kontinuerligt återkom under arbetets gång var värdet av gemensam och delad förståelse, samt vikten av att ta vara på redan etablerad kunskap inom byggindustrin. Det finns i branschen en ofta påtalad klyfta mellan olika generationer, vilket enligt detta arbete ses som det tydligaste exemplet både på en bristande förståelse och ett dåligt utnyttjande av tidigare kunskaper. Vid ett ineffektivt möte mellan olika erfarenheter och kunskaper så leder detta till friktion istället för utveckling, med bortslösade resurser och kunskaper som resultat. Ett stort fokus med detta arbete blev därför att betona den mänskliga aspekten av BIM-implementering snarare än de tekniska delarna. Slutligen konstaterar detta examensarbete att de 14 utvalda punkterna samt användandet av deras övergripande term CSF har ett mervärde både för framtida studier och framtidens implementeringar av BIM, vilket därmed även uppfyller rapporten syfte.
BIM (Building Information Modeling) is an exponentially growing field within the construction industry, with no signs of slowing down. However, as the process continues to spread on both an international and national scale, issues with implementation inevitably arise due to many different factors, in this work identified as CSF (Critical Success Factors). The purpose of this work is therefore to examine these factors, as well as the term CSF itself, with regards to meaning and relevance. Based on previous studies the term CSF, as well as 14 factors, were established. To correlate these internationally described factors to the Swedish market, five interviews featuring people with experience of BIM in Sweden were conducted, after which similarities and patterns could be recognized. The core concepts continually established throughout the work was the value of mutual and shared understanding, as well as the importance of utilizing previously established knowledge within the construction industry. The report concludes that the identified factors as well as the term CSF are both valid and beneficial for future discussions and implementations of BIM
31

Lee, Yong Cheol. "Rule logic and its validation framework of model view definitions for building information modeling." Diss., Georgia Institute of Technology, 2015. http://hdl.handle.net/1853/54430.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
With the growing number of complex requirements for building and facility projects, diverse domain experts iteratively exchange building design and product data during the design, construction, and facility management phases. Such data exchanges, however, frequently involve unintended geometric transformations, inaccurate project requirements, and insufficient syntactic and semantic elements in building model data. To ensure the interoperability of building information models, this dissertation includes an examination of rules categorized from the Precast Concrete Institute model views and a generalization of the rule logic and structures of each rule set. Moreover, rule logic is coded and implemented on modularized validation platforms of a validation tool referred to as the IfcDoc tool, an automated model view documentation and validation application. This dissertation is expected to help domain experts evaluate whether building design data fulfill the data exchange specifications of their domain and the objectives of a proposed project. Furthermore, to identify unreliable and inconsistent IFC mapping procedures of BIM authoring tools, software developers using the proposed approach would implement an automated debugging process in their IFC interfaces according to the specifications of a targeted model view.
32

Quiso, E., J. Rivera, and J. Farje. "Proposal for the application of ICE and BIM sessions to increase productivity in construction." IOP Publishing Ltd, 2021. http://hdl.handle.net/10757/655943.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Several studies have shown that the main problem in the construction industry is low productivity. Therefore, this study focuses on developing a proposal through a methodology that can increase productivity in the construction of buildings. The proposed methodology is Virtual Design and Construction (VDC), which has 4 pillars: Building Information Modeling (BIM), Integrated Concurrent Engineering (ICE), metrics and Project Production Management (PPM). However, the article mainly develops BIM and ICE sessions. In addition, in the ICE sessions, "work executors"will be added, so that the information is fed back by both parties, specialist engineers and work executors. Finally, the proposal will be applied in a multi-family building project in the city of Lima - Peru, in order to obtain improvement results.
33

Nováček, Michal. "Pokročilé uplatnění BIM při návrhu stavebních objektů." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392305.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This thesis deals with a Building Information Model (BIM) and its advanced use in construction practice. It focuses on the usage of BIM model in the determination of pressure drop in ventilation pipelines. An application able to calculate the pressure drop in a pipeline branch based on the geometrical parameters of the BIMs of structures was created within the work.
34

Costin, Aaron M. "Integration of passive RFID location tracking for real-time visualization in building information models (BIM)." Thesis, Georgia Institute of Technology, 2013. http://hdl.handle.net/1853/50395.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Navigation through large and unfamiliar facilities with labyrinths of corridors and rooms is difficult and often results in a person being lost. Additionally, locating a specific utility within a facility is often a tough task. The hypothesis tested in this research is that integrating real-time automated sensing technology and a Building Information Model will provide real time visualization that can assist in localization and navigation of a facility. The scope of this research is facility maintenance management during the Operation and Maintenance (O&M) phase of a facility. The thesis demonstrates how the integration of passive Radio Frequency Identification (RFID) tracking technology and Building Information Modeling (BIM) can assist in facilities maintenance management. The objectives of this research included 1) developing a framework that utilizes the integration of commercially-available RFID and a BIM model; 2) evaluating the framework for real-time resource location tracking within an indoor environment; and 3) developing an algorithm for real-time localization and visualization in a BIM model. A prototype application has been developed that simultaneously connects the RFID readers, a database, and a BIM model. The goal of this system is to have a real-time localization accuracy of 3 meters at 95% confidence. Testing was conducted in laboratory conditions, and the results show that the system error was within the 3 meters goal.
35

Nilsson, Erik, and Goidaragh Safiyeh Alizadeh. "Kundnyttan av Tekla Structures som verktyg i broprojektering." Thesis, KTH, Byggteknik och design, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-125749.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Byggbranschen är inne i en övergångsfas mellan 2D och 3D. BIM, som arbetsmetod, och 3D-modeller blir allt vanligare. I broprojekt är dock efterfrågan på dessa modeller låg. På WSP i Stockholm används 3D-modelleringprogrammet Tekla Structures i stor utsträckning på flera avdelningar. Önskemål finns om att utöka användningen av programmet även inom broprojektering. För att det ska bli möjligt krävs en större efterfrågan hos företagets kunder. Detta examensarbete har till syfte att ur kundens synvinkel utvärdera Tekla Structures som verktyg samt vilken nytta kunden har av Tekla-modeller. För att kunna belysa ämnet ur detta perspektiv har intervjuer gjorts med olika kunder till WSP. Deras behov och syn på BIM och Tekla Structures i brosammanhang har kartlagts och analyserats. Aspekter som kunden lyft fram i intervjuerna har fungerat som plattform för analys av en 3D-modell som konstruerats med hjälp av Tekla Structures samt två redan projekterade broar, modellerade i samma program. Analysen visar att kundnyttan av att använda Tekla-modeller i broprojekt är stor men för att möjliggöra hantering av modellerna krävs stora insatser. Utvärdering av programvaran visar även dess starka respektive svaga sidor. Resultatet av arbetet redovisas i rapportens följande sidor.
The building industry is going trough a transitional stage, from 2D to 3D. BIM, as a working method, and 3D models are becoming more common. In bridge project however, the demand for 3D models is low. At WSP in Stockholm the 3D modelling program Tekla Structures is widely used in several departments. There is a desire to expand the usage of the program also when it comes to bridge planning. To make that possible a bigger request by the customers is required. The purpose of this thesis is to evaluate Tekla Structure as a tool from a customer perspective and to analyse the customer values by using Tekla models. To shed light on this issue interviews have been made with different customers of WSP. The customers’ needs and their reflections on BIM and Tekla Structures in bridge projects are mapped out and analysed. Aspects reached by the customers have served as a basis for analyse of a 3D model, built up in Tekla Structures, as well as two bridges – already modelled in the same program. The analysis shows that there is a big customer value by using Tekla models in bridge projects, but to enable management models great efforts are required. An evaluation of the software also shows both strengths and weaknesses. In the following pages the result is presented.
36

Hjalmarsson, Markus. "BIM i små väg- och anläggningsprojekt : För- och nackdelar med 3D-projektering kontra 2D-projektering." Thesis, Karlstads universitet, Avdelningen för energi-, miljö- och byggteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-68700.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The road and construction industry is far behind other industries in terms of the use of modern working methods like BIM. However, as the Swedish Transport Administration and other customers is beginning to request the use of BIM, the industry must adapt and start using the new working methods. The transition is problematic because there are no standards and rules for how and when BIM is to be used. In addition, there are technical difficulties with proprietary file formats and learning projectors that are unfamiliar to the new software. But as the demand for BIM increases, companies need to adapt to win the jobs, the same applies to the smaller projects in the long run. The benefits reported with BIM are many, where the visualization opportunity leads to improved work coordination because everyone in the project sees the same things and thus gains greater understanding is the greatest advantage. The customer also gets a clear picture of the projector's proposal, which simplifies the decision-making process as it can be done faster. The ability to perform collision checks is also seen as an advantage as it can save money later in the project. A BIM can also be used for work preparation, which gives the construction workers a better understanding of what to do, their skills can also be used to review the model for detecting design errors and locating dangerous work operations. The information associated with the model makes it easier to make readjustments and the changes are reflected directly as the changes are made - this reduces drawing revisions and the actual costs of the project becomes clearer. To use 3D design instead of 2D design in smaller road and construction projects may imply a longer planning phase, for Tullholmsviken stage 3, the 3D design took 8 hours longer to create than when using traditional methods, which corresponds to 6400 kr in increased costs. This leads to increased design costs, but the benefits that modeling imply is estimated to compensate for the increased costs. In the previous phase of Tullholmsviken, there was a coordination problem between the architect and the land projector. The cost of fixing the problem was estimated to 32000 SEK, but with a 3D-modell that problem would probably been fixed earlier in the process and the costs would not be as high as 32000 kr. Increased projection costs for a 3D-modell would therefore be economically justifiable for that particular project
37

Homolová, Tereza. "Využití informačního modelu budovy (BIM) v realitním inženýrství." Master's thesis, Vysoké učení technické v Brně. Ústav soudního inženýrství, 2020. http://www.nusl.cz/ntk/nusl-413829.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The diploma thesis deals with Building Information Modeling (BIM) and its application in real estate engineering. The document is divided into three main parts. The first part introduces the Building Information Modeling mentioning historical development, basic principles, software tools and advantages of using BIM in particular parts of building life-cycle. At the end of the first chapter, there are presented the pros and cons of BIM method. The second part is focused on the analysis of the current status of BIM implementation in the Czech Republic as well as in foreign countries. The last part deals with possibilities of using BIM in real estate engineering; specifically, the main focus is on: facility management and property maintenance, real estate market and real estate agencies and real estate appraisal. The possibilities of practical using are showed on examples. The conclusion is based on the discussion and summarization of possible usage of BIM method in real estate engineering.
38

Lee, Bryan. "Applying systems modeling and case study methodologies to develop building information modeling for masonry construction." Thesis, Georgia Institute of Technology, 2015. http://hdl.handle.net/1853/53602.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Building Information Modeling, or BIM, is a digital representation of physical and functional characteristics of a facility that serves as a shared resource for information for decision-making throughout the project lifecycle (National Institute of Building Sciences, 2007). The masonry construction industry currently suffers from the lack of BIM integration. Where other industries and trades have increased productivity by implementing standards for software-enhanced workflows, masonry construction has failed to adopt information tools and processes. New information technology and process modeling tools have grown in popularity and their use is helping to understand and improve construction processes. The Systems Modeling Language, or SysML, is one of the process modeling tools we can use to model and analyze the various processes and workflows. In this research, a case study methodology was applied to analyze the masonry construction industry to understand the current state of masonry construction processes and workflows. This thesis reviews these concepts and the applied case studies which are necessary to move forward with the implementation of BIM for masonry.
39

Rodriguez, Ewerlöf Ivana. "Användning av byggnadsinformationsmodellering (BIM) för effektivare klimat- och livscykelanalyser av byggnadskonstruktioner." Thesis, Uppsala universitet, Industriell teknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-351956.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Byggprocesser och produktionen av byggmaterial orsakar stora delar av världens och Sveriges växthusgasutsläpp. För att uppnå en hållbar utveckling är det av stor vikt att minska klimatpåverkan från byggnadskonstruktioner. Genom att göra klimat- och livscykelanalyser av byggnader i tidiga designskeden ökar möjligheten att påverka design, material- och produktval för att minska klimatpåverkan. I denna studie undersöktes hur byggnadsinformationsmodeller (BIM) och BIM-metodik kan användas för ökade möjligheter att effektivt utföra klimat- och livscykelanalyser av ingående byggnadsmaterial iterativt under projekteringsprocessen. Två 3D-modeller importerades till två verktyg för klimat- och livscykelanalyser, Bidcon och One Click LCA. Mängdavtagningen från objekten i modellen till båda LCA-verktygen fungerade automatiskt medan kopplingen mellan objekten och databaser med miljöpåverkansdata för byggobjekt och material innebar mycket handpåläggningsarbete. Processerna förutsätter att modellerna innehåller någon information om de ingående materialen i modellens objekt, vilket därför bör kravställas under projekteringen. För att kopplingen mellan materialbeskrivningar och databaser i LCA-programmen ska ske mer automatiskt bör materialen eller objekten benämnas standardiserat, till exempel med BSAB-koder, ett klassifikationssystem från Svensk Byggtjänst. Benämningarna bör sedan kunna kopplas automatiskt till poster i databaser för effektivare klimat- och livscykelanalyser.  Även intervjuer utfördes, i syfte att undersöka hur metodiken för integrering av BIM och LCA kan tillämpas i byggprojekt. Möjligheten att tillämpa detta i konsultföretag beror på beställarens krav samt i vilka skeden och discipliner konsulterna arbetar. Integreringsprocesser av BIM- och LCA-verktyg borde kombineras med interdisciplinära möten för bättre resultat. Detta tillsammans med ökad efterfrågan på klimat- och livscykelanalyser, exempelvis för att uppnå miljöcertifieringar, kan öka motivationen att använda metodiken. På så sätt kan byggnadsinformationsmodellering användas för effektivare klimat- och livscykelanalyser vilket bidrar till minskad klimatpåverkan från byggnadskonstruktioner.
Construction processes and the production of building material cause a large part of the emissions of greenhouse gases around the world. To achieve a sustainable development it is of great importance to reduce emissions from construction projects. Doing climate analyses and life cycle assessments of building materials during early design phases could enable more sustainable design and material choices. This thesis focuses on Swedish conditions. During this study it was investigated how Building Information Modeling/Management (BIM) can be used to improve possibilities of doing efficient life cycle assessments (LCA) of buildings and included materials, during the whole design phase. Two 3D building models were transferred to two software tools, Bidcon and One Click LCA, for climate analysis and life cycle assessment of the building components. Quantity take-off from the model objects to the tools worked automatically while the connection between the material descriptions and databases inside the tools had to be done manually. The process requires information about the materials in the model to work. To make the connections more automatic, material descriptions need to be more standardized and connect to entries in the databases. Moreover interviews were held to investigate how the methods of integrating BIM with LCA can be used in construction projects. For consulting firms this depends on the demands from the client and which stages of the project the consultants work in. LCA-methods based on BIM should be combined with interdisciplinary meetings for better results. This together with an expanding demand for LCA could increase the motivation to use these methods, which enables reduction of climate impact from buildings.
40

Muminovic, Meliha, and Emira Tandirovic. "Varför används inte BIM?- Vad är det som motverkar implementeringsprocessen?" Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-68451.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
De flesta produktionsbranscher i Sverige har haft en positiv teknisk utveckling med digitaliserade verksamheter, och därmed effektivare processer. Byggbranschen är den bransch som det har tagit mycket längre tid för att implementera digitaliserade arbetssätt och metoder, och beskrivs oftast som en konservativ bransch. Denna utveckling har dock accelererat under senare år, och BIM (Buliding Information Modelling) har blivit allt mer känt inom byggindustrin.Syftet med arbetet var att undersöka hur mycket BIM egentligen används i byggbranschen, och vilka de rådande orsakerna är till varför det inte används hos alla aktörer. Metoden som har tillämpats i studien utgörs av en förstudie i form av en enkät, där olika aktörer har beskrivit hur BIM tillämpas i deras verksamhet samt vilka de verkliga problemen är för utvecklingen av BIM. Utifrån enkätsvar har en djupare studie utförts i form av intervjuer av olika aktörer.Resultatet visar att det snarare är okunskap, användarvänlighet och bristfällig samverkan som motverkar utveckling av BIM-processen. För att komma ifrån det konservativa så behöver dessa faktorer angripas, om effektivare processer ska tillföras branschen.Slutsatsen om varför BIM inte används dras av resultaten ovan. Processen används till en viss del, men inte i den utsträckning som det teoretiskt är avsett. Den sträcker sig inte ut över hela byggprocessen, och är mest utvecklad i projekteringsskedet. Processen tillämpas fram till övergången mellan de olika skedena, och beror på bristfälliga kravställningar och samarbeten mellan aktörer och beställare. En lösning är att öka BIM-kunskapen och utveckla en gemensam plattform för alla aktörer i alla skeden, där kravet på BIM ska vara en självklarhet i projekten. Detta genom en framtagen implementeringsmodell anpassad efter de svar och önskemål som förekommit i studien.
Most production sectors in Sweden have had a positive technical development with digitized operations, and thus more efficient processes. The construction industry is the industry that has taken much longer to implement digitized working methods and methods, and is usually described as a conservative industry. However, this development has accelerated in recent years, and BIM (Buliding Information Modeling) has become increasingly known in the construction industry. The purpose of the work was to investigate how much BIM is actually used in the construction industry, and what the prevailing reasons are why it is not used by all actors. The method used in the study consists of a preliminary study in the form of a survey, where different actors have described how BIM is applied in their operations and what the real problems are for the development of BIM. Based on questionnaire responses, a deeper study has been conducted in the form of interviews by different actors. The result shows that it is rather ignorance, user friendliness and inadequate collaboration that counteract the development of the BIM process. To get rid of the conservative, these factors need to be addressed if more efficient processes are to be supplied to the industry.The conclusion about why BIM is not used is deducted from the results above. The process is used to a certain extent, but not to the extent that it is theoretically intended. It does not extend throughout the entire construction process, and is most developed in the design phase. The process is applied to the transition between the different stages, and is due to insufficient demands and cooperation between actors and developer. One solution is to increase BIM knowledge and develop a common platform for all actors at all stages, where the requirement for BIM should be a matter of course in the projects. This through an implemented implementation-model adapted to the responses and wishes that have been found in the study.
41

Farah, Toni E. "Review of current estimating capabilities of the 3d building information model software to support design for production/construction." Link to electronic thesis, 2005. http://www.wpi.edu/Pubs/ETD/Available/etd-082305-165125/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
42

Vasconcelos, Tiago Miguel Nunes Rolo Ferreira de. "Building information model - avaliação do seu potencial como solução para os principais atrasos e desperdícios na construção portuguesa." Master's thesis, Faculdade de Ciências e Tecnologia, 2010. http://hdl.handle.net/10362/5641.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Civil – perfil de Construção
Estudos anteriores ao sector da construção revelaram a necessidade de investir na melhoria da qualidade dos projectos e na melhoria da gestão dos empreendimentos. A concepção desta dissertação partiu, assim, da ideia de esclarecer as causas para o incumprimento de prazos e de custos, reunindo toda a informação necessária de forma a discutir se a implemenção do BIM – Building Information Modeling – resolveria estas situações. Este estudo concebeu-se através de entrevistas a 10 empresas portuguesas de construção com actividades de investigação e desenvolvimento, sobre os problemas de incumprimento de prazos e de custos nas fases de Concurso, Preparação e Execução, na perspectiva do Empreiteiro. Os potenciais benefícios da metodologia BIM são o aumento do fluxo de informação, o aumento da colaboração, o aumento do controlo do planeamento e do orçamento, a redução das incompatibilidades entre projectos de especialidades, o aumento da qualidade da construção e a diminuição do risco. Assim, o BIM tem a capacidade de eliminar ou atenuar os problemas detectatos nas 3 fases. Pretende-se que este estudo esclareça a indústria da construção relativamente aos problemas existentes e alerte os responsáveis para a implementação de ferramentas de gestão que eliminem desperdícios (tempo e materiais) e diminuam os custos dos empreendimentos.
43

Odeh, Ahmad. "An Integrated BIM Model to Evaluate the Embodied Energy, Carbon Emissions & Environmental Costs of Construction Materials Used in the Design of Buildings." Thesis, Université d'Ottawa / University of Ottawa, 2020. http://hdl.handle.net/10393/41550.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Currently, many researchers are looking at efficient ways to reduce energy and carbon emissions of construction materials used in buildings over their life due to its significant environmental impact. Along with operational energy, embodied energies and its associated carbon are substantial contributors in the overall sustainability assessment. The calculation of materials’ embodied energy and carbon emissions during the construction stage is a major assessment factor that needs to be considered to measure the environmental impact of materials used in the construction of buildings, which would provide designers with the ability to lower the environmental impact of buildings at the early design stage. Overall, it is rather complicated to compute embodied energy and carbon emissions due to the various factors involved. The tools and methodologies, listed in the literature, are rather imperfect as they tend to overgeneralize. The equipment used, fuel needed, and electricity required for each type of construction material varies from one location to another and thus embodied energy used, and carbon produced will differ for each construction project. Moreover, the method used in manufacturing, transporting and putting in place these materials will have significant influence on their environmental impact. This anomaly has made it difficult to calculate or even benchmark the usage of such factors. This thesis proposes an integrated model aimed at calculating embodied energies, embodied carbon and associated costs generated by construction materials based on such variability. This thesis presents a systematic approach that uses an efficient method of calculation to provide new insight for the selection of construction materials and equipment required to place them for buildings. Such assessment will aid in reducing the environmental impact of construction. The proposed model will be developed in a BIM environment. The quantification of materials’ energy is determined over the three main stages of their lifecycle: manufacturing, transporting, and placing. The proposed model will use multiple databases to calculate the energy used by manufacturing, transporting, and placing construction materials. By identifying the machinery required, an accurate calculation is achieved through geospatial data analysis. The proposed model can automatically calculate the distances between the material suppliers and construction sites to increase the accuracy of its outcome. Based on such variables, the proposed model provides designers with a list of equipment as to minimize the embodied energy and carbon produced by materials used in constructing buildings. Additionally, the proposed model has the ability to calculate the environmental cost impact of using specific building materials. Overall, this thesis aims to help researchers and the construction industry in reducing the environmental impact of construction activities through the selection of materials and the determination of machines required to achieve that goal.
44

Thomson, C. P. H. "From point cloud to building information model : capturing and processing survey data towards automation for high quality 3D models to aid a BIM process." Thesis, University College London (University of London), 2016. http://discovery.ucl.ac.uk/1485847/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Building Information Modelling has, more than any previous initiative, established itself as the process by which operational change can occur, driven by a desire to eradicate the inefficiencies in time and value and requiring a change of approach to the whole lifecycle of construction from design through construction to operation and eventual demolition. BIM should provide a common digital platform which allows different stakeholders to supply and retrieve information thereby reducing waste through enhanced decision making. Through the provision of measurement and representative digital geometry for construction and management purposes, surveying is very much a part of BIM. Given that all professions that are involved with construction have to consider the way in which they handle data to fit with the BIM process, it stands to reason that Geomatic or Land Surveyors play a key part. This is further encouraged by the fact that 3D laser scanning has been adopted as the primary measurement technique for geometry capture for BIM. Also it is supported by a laser scanning work stream from the UK Government backed BIM Task Group. Against this backdrop, the research in this thesis investigates the 3D modelling aspects of BIM, from initial geometry capture in the real world, to the generation and storage of the virtual world model, while keeping the workflow and outputs compatible with the BIM process. The focus will be made on a key part of the workflow for capturing as-built conditions: the geometry creation from point clouds. This area is considered a bottleneck in the BIM process for existing assets not helped by their often poor or non-existent documentation. Automated modelling is seen as desirable commercially with the goal of reducing time, and therefore cost, and making laser scanning a more viable proposition for a range of tasks in the lifecycle.
45

Orenäs, Nissas Sebastian, and Nangi Rahimi. "Digitalized Construction Project : To Build after a Legally Binding BIM-model." Thesis, KTH, Fastigheter och byggande, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-279110.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Digitalization has become something of a buzzword in today's society and rightly so as it brings multiple benefits and opportunities. The AEC/FM industry has constantly lagged behind other industries in terms of change and development and is often regarded as conservative. Strongly associated with digitalization in construction are the concepts of Building Information Modeling (BIM) and Virtual Design and Construction (VDC), which partly include technology and models for integrated and model-based approaches to, for example, reduce fragmentation between project members who traditionally work independently of one another. In research, it is revealed that there are large gains with a successful implementation of BIM/VDC in projects and this is something that many companies in the industry are working with and seeking to develop. The purpose of the thesis is to investigate how the project team members have worked and how the working methods are perceived by them in a well-known construction project in Sweden, where they have taken a step further in digitalizing construction by building after a legally binding digital model instead of the traditional paper drawings. The subject is explored with a qualitative method, in the form of a case study, where a scientific literature study, interview study, and observations together form the basis of the study and these parts act as a basis for the discussion. The literature study covers previous research as well as concepts relevant for answering formulated research questions and concepts that emerged during the interview study that are important to understand for a qualitative discussion and, consequently, qualitative conclusions. In the interview study, 13 respondents were interviewed in so-called semi-structured interviews and all of them were involved in the case project. The findings indicate that the BIM-model can contribute to better communication, higher resource efficiency, better quality and, at the same time for a lower total cost of the project. Identified perceptions in designing a BIM-model and then building after the model instead of 2D drawings are predominantly positive. While advantages and opportunities are demonstrated by this way of working, new challenges and risks arise. This entails legal risks, technical risks and management risks. There are new types of errors that arise with a more detailed design.
Digitalisering har blivit något av ett modeord inom dagens samhälle och det med all rätt då det medför sina fördelar och möjligheter. Bygg- och fastighetsbranschen har ständigt släpat efter övriga industrier vad gäller förändring och utveckling och ses därefter ofta som konservativ. Starkt associerat med digitalisering inom bygg är koncepten Building Information Modeling (BIM) och Virtual Design and Construction (VDC) som dels innefattar teknologi och modeller för integrerade och modellbaserade arbetssätt. De används exempelvis för att minska fragmentering mellan projektmedlemmar som vanligen enbart fokuserar på sina egna teknikområden. Inom forskningsvärlden sägs det finnas stora vinningar med en lyckad implementering av BIM/VDC i projekt och det är något som många företag inom branschen arbetar med och söker utveckla. Samtidigt anger forskningen också att det finns stora utmaningar och att man ännu inte kommit så långt med digitaliseringen. Syftet med detta examensarbete är bland annat att undersöka hur projektmedlemmar har arbetat och hur arbetssätten har upplevts i ett av få välkända byggprojekt i Sverige där man tagit ett steg längre i att digitalisera byggandet genom att bygga efter en digital modell som juridisk bygghandling istället för de traditionella pappersritningarna. Ämnet utforskas kvalitativt, i form av en fallstudie, där en vetenskaplig litteraturstudie, intervjustudie samt observationer tillsammans utgör grunden för arbetet och som alla agerar underlag för analysdelen. Litteraturstudien täcker tidigare studier på området för att beskriva kunskapsläget samt koncept som är relevanta för att besvara formulerade frågeställningar samt begrepp som dykt upp under intervjustudien som är viktiga att förstå för en kvalitativ diskussion och följaktligen likaså kvalitativa slutsatser. I intervjustudien har 13 respondenter intervjuats i så kallade semi-strukturerade intervjuer och som alla varit inblandade i det undersökta projektet. Resultatet tyder på att BIM-modellen kan bidra till en bättre kommunikation, högre resurseffektivitet, bättre kvalitet och samtidigt till en lägre totalkostnad av projektet. Identifierade upplevelser med att projektera en BIM-modell och att därefter bygga efter modellen istället för 2Dritningar är till övervägande del positiva. Samtidigt som fördelar och möjligheter påvisas med detta arbetssätt så uppkommer nya utmaningar och risker. Det medför juridiska risker, tekniska risker och hanteringsrisker. Det är exempelvis nya typer av fel som uppkommer med en mer detaljerad projektering.
46

Taher, Abdo, and Benyamin Ulger. "Tillämpning av BIM i ett byggnadsprojekt : Centrum för idrott och kultur i Knivsta." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-55198.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Byggbranschen är en konservativ sektor där traditionella arbetssätt hindrar digitaliseringen från att nå sin fulla potential. BIM som står för building information modeling eller building information managment är det begreppet som står i fokus när digitaliseringen för byggprojekt diskuteras. Majoriteten av alla byggprojekt genomförs, trots fördelarna med BIM, fortfarande på ett mer eller mindre traditionellt sätt. I detta examensarbete undersöks CIK-projektet som står för Centrum för idrott och kultur i Knivsta. Projektet projekterades och framställdes med traditionella metoder. Utifrån personliga erfaranheter och flertalet personliga kommunikationer är det tydligt att kunskapsnivån kring den praktiska tillämpningen av BIM är väldigt låg i byggbranschen. Problematiken kring den låga kunskapsnivån för den praktiska tillämpningen leder till en underutvecklad digitalisering.  Syftet med detta examensarbete är att redogöra för hur CIK-projektet utfördes. Vidare undersöks det huruvida CIK-projektet hade kunnat projekteras med BIM som arbetssätt och vilka förändringar det skulle innebära för projektet. Metoden i arbetet har bestått av en litteraturstudie för att undersöka begreppet BIM och hur BIM tillämpas i byggprocessen. Därtill utfördes en litteraturstudie av Revit, BIMeye och StreamBIM som är BIM-verktygen som används i detta examensarbete. Vidare genomfördes en fallstudie av CIK-projektet där objektet beskrevs samt dokument och intervjuer analyserades. Slutligen utfördes ommodelleringar och observationer av CIK-projektet med BIM-verktygen som nämnts ovan. Resultatet påvisar inledningsvis hur de traditionella arbetsmetoderna genomfördes och därmed präglade CIK-projektet. Den uteblivna detaljerade kravställnigen från politikerna och beställarna resulterade i många oklarheter när den efterfrågade produkten skulle utformas. Arkitekterna använde sig av traditionella skissmetoder vid gestaltningen för att hitta lösningar på de efterfrågade behoven. Kalkyl och tidsplaneringen skapades samt justerades manuellt, vilket utfördes separerat från 3D-modellen. 3D-modellerna i CIK-projektet användes för visualiseringar och samordningar för kollisionskontroller. De kontrakterade handlingarna vid diverse leveranser var dock traditionella 2D-ritningar. Av dokumentanalysen kunde det konstateras att arkitekterna framställde över 300 ritningar och över 100 olika dörrar som presenterades på ett flertal olika ritningar. Revideringar under produktionen arbetades in i ritningarna och molnades därefter in för att markera ändringen. Därtill skapades det ett separat PM där revideringarna presenterades mer ingående. När byggnationen var färdigställd arbetades ytterligare korrigeringar in i handlingarna av konsulterna. Utvalda handlingar i samråd med beställarna stämplades sedan om till relationshandlingar och levererades som PDF-filer till förvaltarna. Vidare visar resultatet hur CIK-projektet med en BIM-tillämpning hade kunnat utföras. CIK med BIM innebär att det tillkommer minst två nya roller, en BIM-strateg och en BIM-samordnare. Vid projektstart skapar BIM-strategen tillsammans med beställarna en kravspecifikation i form av en BIM-manual för att beskriva standarder, leverensspecifikationer, kommunikationsmetoder med mera. Därtill ska det bland annat framgå hur den kommande modellen skall berikas med information samt vilka BIM-verktyg som skall användas. Den ansvariga BIM-samordnaren har sedan som arbetsuppgift att de ställda kraven för BIM-projektet efterföljs. Under gestaltningen ska beräkningskrafterna från parametrisk och generativ design användas för att hitta olika lösningar på krav. Därtill ska simulationer och analyser användas under projektets gång för att ta hänsyn till och säkerställa att kraven och behoven uppnås. Kalkylen och tidplanen ska vara kopplade till BIM-modellen för att ständigt få korrekta och uppdaterade kostnader och tidsåtgångar. Med hjälp av molntjänster som exempelvis BIMeye kan all data och information från BIM-modellen hanteras och diverse rapporter av informationen exporteras av samtliga i projektet. Via exempelvis StreamBIM hämtar sedan produktionen all nödvändig information från BIM-modellen för att kunna framställa CIK utan traditionella ritningar. Viktiga detaljritningar och kompletterande handlingar som exempelvis dörrkortet som skribenterna skapade ska kopplas till objekten i StreamBIM. Under hela produktionen ska sedan BIM-modellen ständigt uppdateras för att kunna skapa en digital tvilling av den verkliga byggnaden som sedan överlämnas till beställarna för förvaltning. BIM-modellen används och berikas sedan under hela byggnadens livstid. Vidare fördes det diskussioner i anknytning till resultatet, därtill diskuterades även metod och begränsningar för arbetet. CIK-projektet är ett bevis på att det går att arbeta på ett traditionellt sätt och ändå kunna framställa bra byggnader. Däremot hade ett BIM-tillämpat arbetssätt kunnat skapa ett mervärde för beställarna genom att kvalitetssäkra hela arbetet från idé till förvaltning. För att en tillämpning av BIM ska verkställas krävs det dock tydliga och specificerade krav från beställarna. Skribenterna anser därför att nationella krav skulle påskynda digitaliseringen i byggbranschen. BIM motiverar sig själv eftersom ändringar blir mer kostsamma i senare skeden jämfört med tidigt i projekteringen. Därför borde det läggas ner mer tid och kostnader på att analysera och hantera bygginformation tidigt för att inte riskera att större kostnader tillkommer senare i projektet. Eftersom begreppet BIM är brett och uppfattningarna kan variera mellan aktörer i branschen försvårades inhämtningen av vetenskaplig litteratur. Däremot underlättades säkerställandet av källkritiken genom författarnas erfarenheter av projektering på arkitektsidan. De slutsatser som kan dras från detta examensarbete är att bygginformationshanteringen är en viktig aspekt att beakta under byggprocessen. För komplexa projekt som CIK hade BIM inneburit ett helt nytt sätt att hantera och centralisera informationen genom att knyta data till objekten i modellen. Poängen med BIM-projekt är att ständigt vända sig till modellen eller molntjänstens databas som i sin tur är kopplad till modellen för att hämta nödvändig information. Resultatet blir därför ett frigörande från de informationsöarna och dubbelarbete som bildades i CIK-projektet med en traditionell projektering.
Purpose: The purpose of this study is to describe how the CIK project was executed. Furthermore, it is investigated how the CIK project could have been designed with BIM as a working method and what changes it would entail for the project. Method: This study has consisted of a literature study of BIM and a case study of the CIK project. The case study included an object description as well as documents and interviews were analyzed. In addition, remodeling and observations of the CIK project were performed with BIM tools. Results: The results initially show how the traditional working methods were implemented in the CIK project. The initial lack of requirements created ambiguities. The architects used traditional sketching methods for the design. Calculation and scheduling were handled separately from the 3D model. The 3D models in the CIK project were used for visualizations and coordination. However, the contracted documents for various deliveries were traditional 2D drawings. The architects produced over 300 drawings and over 100 different doors that were presented on different drawings. At the end of the production, selected PDF-documents were re-stamped in consultation with the customers for the administration. Furthermore, the results show how the CIK project with a BIM application could have been carried out. Initially, a BIM manual is created by a BIM strategist to specify the requirements. During design, parametric and generative design are used to find different solutions to meet the requirements. The calculation and schedule must be linked to the BIM model. All information management takes place in cloud services such as BIMeye. Through StreamBIM, the production then retrieves all the necessary information from the BIM model. Additional detailed drawings should be linked to the objects in StreamBIM. During production, the BIM model is updated before the delivery to the customers. Conclusions: The conclusions that can be drawn from this study are that the information management is an important aspect to implement during the construction process. For the CIK project, BIM would mean a completely new way of managing and centralizing the information by linking data to the objects in the model. The point of BIM projects is to constantly turn to the model or database, which is linked to the model to retrieve the necessary information. The result is therefore a release from the information islands and duplication of work that is formed in a traditional design.
47

Staufčík, Jakub. "Využití laserového skenování v informačním modelování budov." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-400177.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
This thesis deals with the creation of a BIM model using laser scanning. In the first part of the thesis, basic information about building information modeling (BIM) is described. The next section describes the process of creating a BIM model, from data acquisition to modeling or a particular building. The model was created in Revit.
48

Bäckner, Caroline, and Tobias Vigert. "Kan kostnadsbedömningar i tidiga skeden byggt på BIM utföras?" Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-260323.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Dagens samhälle står i stort inför en förändring gällande digitalisering där kostnadseffektivitet, produktivitet samt digitalisering samspelar. Den svenska byggsektorn har visat sig ha en låg utvecklingsgrad inom digitalisering. Ottosson upplyser om att drygt 80% av alla komplikationer i byggprojekt har sin grund i bristande kommunikation. Svensk byggtjänst har visat att kostnaderna för byggproduktionen och förvaltningen fördyras med omkring 60 miljarder kronor varje år. Det handlar i grund och botten om hur aktörer kommunicerar sinsemellan men även hur information hanteras digitalt. Ett känt begrepp i dagens byggbransch rörande digitalisering och kommunikation är BIM, ”Byggnadsinformationsmodell/modellering”. Konceptet handlar om att skapa och nyttja exakta digitala modeller från byggprojekt. Det går ut på att få fram information från den digitala modellen som är betydande för förverkligandet av byggnadsverket och som då uppfyller konceptet BIM. Begreppet berör informationshanteringen, det vill säga kommunikationen mellan olika aktörer. ÅF-Infrastructure AB sektion ”Byggekonomi – Rådgivning tidiga skeden” tilldelade författarna till detta examensarbete att undersöka en specifik metod för kostnadsbedömningar med hjälp av digitala modeller som underlag. Syftet med detta examensarbete är att utreda förslaget till tillvägagångssätt för kostnadsbedömningar med hjälp av digitala modeller i syfte att utveckla företagets interna kostnadsbedömningsverktyg. I och med detta förfaringssätt kan rätt underlag i rätt stadium inom det tidiga skedet bidra till att öka kvaliteten i fattandet av ekonomiska beslut. Examensarbetet baserar sig på en kvalitativ metod i form av litteraturstudier, intervjuer, deltagande vid ämnesaktuella seminarier, observationer av möten samt en kvantitativ metod utförd i syfte att simulera flerbostadshusprojekt. Metoderna har undersökt möjligheten om informationshanteringssystemen Level Of Development och CoClass kan stå till förfogande med underlag inför kostnadsbedömning utav de tre stadierna inom tidiga skeden: idé- förstudie- och programhandlingsstadiet. Studien har visat på framför allt två utmaningar. Det finns utvecklingspotential både vad gäller klassifikationssystemet CoClass och kostnadsbedömningsverktyget Calc Frame. Gällande CoClass bör det framför allt vara klassifikationssystemet som informerar användaren angående vad som ska inrymmas under respektive informationsnivå. Det bör inte vara upp till näringslivet att tolka vad som ska ingå på respektive informationsnivå utan detta bör förfinas och tydliggöras inne i själva klassifikationssystemet. Ur en kostnadsbedömningssynpunkt har det inte gått att ta fram generiska byggnadsverkskomplex i Calc Frame. Då verktyget klarar av att hantera flera olika byggnadsverk kan dessa således kombineras till specifika och unika byggnadsverkskomplex. Teoretiskt sett skulle utvecklandet av generiska byggnadsverkskomplex vara möjligt om programmet vidareutvecklas. Om detta anses eftersträvansvärt så är vår bedömning att det är möjligt att vidareutveckla och applicera metodiken på byggnadsverkskomplex (med samma princip som programmet är uppbyggt) för att skapa generiska komplex. Vår studie har visat att kostnadsbedömningar i tidiga skeden byggt på BIM går att utföra. Huruvida ÅF-Infrastructure AB,s uppdatering av sitt interna kostnadsbedömningsverktyg är kompatibelt med digitala modeller, anser författarna vara bekräftat i och med att studien har visat att den metod som använts för att öka kvaliteten i kostnadsbedömningar är förenlig med det nya klassifikationssystemet CoClass. Rekommendationen är således att uppdatera samt utveckla kostnadsbedömningsverktyg gentemot klassifikationssystemet CoClass.
Today's society is at the forefront of a paradigm shift in digitization where cost-efficiency, productivity and digitalization interact. The Swedish construction sector has proven to have a low degree of development in digitization. Ottosson has shown that over 80% of all complications in construction projects are due to lack of communication. Svensk byggtjänst declares increasing costs for construction production and management by about SEK 60 billion each year. Basically, it is about how actors in the sector communicate among themselves, but also how information is handled digitally. A known concept in today's construction industry concerning information management and communication is BIM, "Building information model / modeling". The concept is about creating and utilizing precise digital models from construction projects. The aim is to obtain information from the digital model that is significant for the realization of the construction work and which then fulfills the BIM concept. The concept concerns information management, i.e. communication between different actors. ÅF-Infrastructure AB section "Byggekonomi – Rådgivning tidiga skeden" commissioned the authors of this master thesis to examine a specific method for cost assessments using digital models as a basis. The purpose of this thesis is to investigate the suggestion for approaches to cost assessments using digital models in order to develop the company's internal cost assessment tools. With this procedure, the right basis at the right stage within the early stage can contribute to increasing the quality of the adoption of financial decisions. The degree project is based on a qualitative method in the form of literature studies, interviews, participation in subject-specific seminars, observations of meetings and a quantitative method performed in order to simulate multi-dwelling housing projects. The methods have investigated the possibility of the information management systems Level Of Development and CoClass being available with a basis for cost assessment of the three stages in the early stages: the idea- feasibility study- and the program action stage. The study has shown two greater challenges. There is development potential both with regard to the classification system CoClass and the cost assessment tool Calc Frame. Regarding CoClass, it should above all be the classification system that informs the user about what ought to be contained under each level of information. It should not be up to the business community to interpret what information includes in each level in the system, this necessitate should be refined and clarified within the classification system itself. From a cost assessment point of view, it has not been possible to produce generic building complexes in Calc Frame. But since the tool is capable of handling several different construction works, these can thus be combined into specific and unique building works. Theoretically, the development of generic building complexes would be possible if the program were further developed. If this is considered desirable, then our assessment is that it is possible to further develop and apply the methodology on building complexes (with the same principle as the program is designed) to create generic complexes. Our study has shown that an economic evaluation in the early stages of the building process can be done with BIM. Whether ÅF-Infrastructure AB's updating of its internal cost assessment tool is compatible with digital models, the authors consider that the study has shown that the method used to increase the quality of cost assessments is compatible with the new classification system CoClass. The recommendation is therefore to update and develop cost assessment tools against the classification system CoClass.
49

Holmgren, Magnus. "Användning av BIM inom förvaltningen för vårdbyggnader : utveckla förvaltningen med hjälp av BIM." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-71403.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
Potentialen att tillhandhålla stora mängder information under hela byggprocessen är något BIM(byggnadsinformationsmodellering på svenska) är mest förknippat med. Dock är den praktiskaanvändningen av BIM i förvaltningen minimal vid jämförelse mot projekteringen.Vårdbyggnader är otroligt viktiga och komplicerade byggnader i samhället som konstant behöverunderhållas och detta arbete tar upp BIM och relationsmodellernas potential att fungera som ettkomplement till dagens och framtidens förvaltningssystem.Studien har fokuserat på att ta reda på hur förvaltningen för vårdbyggnader arbetar idag medBIM och hur de önskar arbeta i framtiden. Detta har gjorts genom intervjuer ochdokumentanalyser där en litteraturstudie ligger till grund över utformningen av de frågeformulärsom tagits fram. Syftet har varit att undersöka vilken information som en BIM-relationsmodell(även kallat förvaltningsmodell) måste innehålla för att vara användbar och till nytta iförvaltningen.Teorin för arbetet beskriver vad BIM är och hur sambandet med BIM och fastighetsförvaltningenser ut. Teorin tar också upp vikten av hållbar information i öppna filformat.Resultatet av insamlade data visar att BIM är väl känt hos fastighetsförvaltningsorganisationernamen används inte i den utsträckning som önskas. Några anledningar till detta är brist på; kunskapinom organisationen, inflytande i byggprocessen och interna arbetsmetoder. Allaintervjurepresentanter är positiva till BIM och ser potentialen i att använda BIM-modeller somderas digitala verktyg att visualisera och hantera information inom förvaltningen. Dock har,framförallt, representanterna med ansvar för CAD/BIM för fastighetsdokumentationen svårt atttydligt påvisa vilken information som de vill ha och ser mer information som bättre.Slutsatsen visar att organisationerna är beroende av att utvärdera sina behov och hitta nyttor medBIM i förvaltningen för att sedan kunna sätta rätt krav på slutleveransen av BIM-modellen somska användas i förvaltningen. Behovet av att på ett konsekvent sätt lägga till, ta ut, uppdatera ochmodifiera information ser alla intervjurepresentanter som en viktig fråga för framtiden.Under diskussionskapitlet tas bland annat problematiken upp med att många som intervjuats seratt ju mer information den levererade BIM-modellen innehåller desto bättre är det. Författarenspersonliga åsikt är att modellen måste anpassas så att rätt information finns.
The potential for supplying large amounts of information throughout the construction process issomething BIM is mostly associated with. However, the practical use of BIM in facilitymanagement is minimal when compared to the project planning phase.Healthcare buildings are incredibly important and complex buildings in the society thatconstantly need to be maintained and this study addresses the potential of BIM and the use of asbuiltmodels to serve as a complement to today's and future facility management systems.This study has focused on finding out how the management of healthcare facilities uses andworks with BIM today and how they wish to work in the future. This has been done throughinterviews and document analyzes where a literature study forms the basis for the formulation ofthe questionnaires produced. The purpose has been to investigate what information a BIM asbuiltmodel (also called facility management model) must contain to be useable and useful in thefacility management.The theory of this study describes what BIM is and how the relationship with BIM and facilitymanagement looks. It also addresses the importance of sustainable information in open fileformats.The result of the collected data from the interviews shows that BIM is well known to facilitymanagement organizations but is not used to the extent desired. A few reasons for this are lackof; knowledge within the organization, influence in the construction process and workingmethods. All interviewees are positive to BIM and see the potential of using BIM models as theirdigital tools to visualize and manage information within the facility management. However have,in particular, the CAD/BIM representatives of the facility documentation difficulty in clearlyidentifying what information they want and thinks a lot of information in the models is better.The conclusion shows that organizations are dependent on evaluating their needs and findingbenefits with BIM in their facility management and then be able to set the right requirements forthe final delivery of the BIM model to be used in the facility management. The need to add,extract, update and modify information consistently, is something all interviewees sees as animportant question for the future.In the discussion chapter the problem arises about the fact that many interviewed thinks that themore information the BIM model contains, the better it is. The author's opinion is that the modelmust be adapted so that the right information is available.
50

Moore, Nigel Jonathan. "A contextual AR model based system on-site construction planning." Thesis, University of Wolverhampton, 2013. http://hdl.handle.net/2436/301614.

Full text
APA, Harvard, Vancouver, ISO, and other styles
Abstract:
The creation of an effective construction schedule is fundamental to the successful completion of a construction project. Effectively communicating the temporal and spatial details of this schedule are vital, however current planning approaches often lead to multiple or misinterpretations of the schedule throughout the planning team. Four Dimensional Computer Aided Design (4D CAD) has emerged over the last twenty years as an effective tool during construction project planning. In recent years Building Information Modelling (BIM) has emerged as a valuable approach to construction informatics throughout the whole lifecycle of a building. Additionally, emerging trends in location-aware and wearable computing provide a future potential for untethered, contextual visualisation and data delivery away from the office. The purpose of this study was to develop a novel computer-based approach, to facilitate on-site 4D construction planning through interaction with a 3D construction model and corresponding building information data in outdoor Augmented Reality (AR). Based on a wide ranging literature review, a conceptual framework was put forward to represent software development requirements to support the sequencing of construction tasks in AR. Based on this framework, an approach was developed that represented the main processes required to plan a construction sequence using an onsite model based 4D methodology. Using this proposed approach, a prototype software tool was developed, 4DAR. The implemented tool facilitated the mapping of elements within an interactive 3D model with corresponding BIM data objects to provide an interface for two way communication with the underlying Industry Foundation Class (IFC) data model. Positioning data from RTK-GPS and an electronic compass enabled the geo-located 3D model to be registered in world coordinates and visualised using a head mounted display fitted with a ii forward facing video camera. The scheduling of construction tasks was achieved using a novel interactive technique that negated the need for a previous construction schedule to be input into the system. The resulting 4D simulation can be viewed at any time during the scheduling process, facilitating an iterative approach to project planning to be adopted. Furthermore, employing the IFC file as a central read/write repository for schedule data reduces the amount of disparate documentation and centralises the storage of schedule information, while improving communication and facilitating collaborative working practices within a project planning team. Post graduate students and construction professionals evaluated the implemented prototype tool to test its usefulness for construction planning requirements. It emerged from the evaluation sessions that the implemented tool had achieved the essential requirements highlighted in the conceptual framework and proposed approach. Furthermore, the evaluators expressed that the implemented software and proposed novel approach to construction planning had potential to assist with the planning process for both experienced and inexperienced construction planners. The following contributions to knowledge have been made by this study in the areas of 4D CAD, construction applications of augmented reality and Building Information Modelling; · 4D Construction Planning in Outdoor Augmented Reality (AR) · The development of a novel 4D planning approach through decomposition · The deployment of Industry Foundation Classes (IFC) in AR · Leveraging IFC files for centralised data management within real time planning and visualisation environment.

To the bibliography