Dissertations / Theses on the topic 'APD'

To see the other types of publications on this topic, follow the link: APD.

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'APD.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Al-Mosawi, Zahra, and Adam Aliwi. "Länken mellan projektering och APD-planering." Thesis, Malmö högskola, Fakulteten för teknik och samhälle (TS), 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-20393.

Full text
Abstract:
Med hänsyn till att vi bygger i stadskärnorna blir APD-planen ett verktyg de större byggprojekten inte klarar sig utan. Antingen görs den i 2D eller i 3D. Nu när byggbranschen allt mer och mer inser nyttan av att planera arbetsplatsens utformning i 3D kan man göra väl genomarbetade APD-planer som innefattar det mesta, vilket även det har sina fördelar ur ett produktionstekniskt synsätt.Denna rapport avser att undersöka sambanden mellan projekteringen och APD-planeringen samt hur dialogen mellan de inblandade aktörerna inom projekteringen och APD-planeringen kan bli bättre. Syftet blir då att undersöka hur personer som varit involverande i byggprojektet STUDIO uppfattar sambandet mellan projekteringen som gjordes för byggprojektet och den senare APD-planen men även vad som kan och bör göras för att få det att fortlöpa enklare. Genom att titta på kommunikationsprocessen mellan dessa grupper kan vikten av att ta hänsyn till arbetsmiljömässiga konsekvenser för både produktionsfasen och för den färdiga byggnaden lyftas fram.Inhämtning av information har skett genom intervjuer med öppna frågor, granskning av Skanskas interna dokument för Projekt STUDIO samt genom facklitteratur. Den teoretiska referensramen har innefattat allt ifrån byggprocessen och dess olika skeden till BAS-P och BAS-U med deras viktiga roller i ett byggprojekt. Vidare har entreprenadformerna presenterats och en närmare beskrivning om vilken entreprenadform som används vid STUDIO finns med. Detta har varit till grund för att få en förståelse om byggprocessen i helhet, APD-plan och vad som krävs vid upprättandet av en sådan.Intervjuerna som genererade en stor portion information för studien hade anknytning till APD-planen och även projekteringen. Personerna som blev intervjuade fick under intervjun berätta hur det i nuläget arbetas men även hur de själva kan tänka sig skulle vara bättre att arbeta. Intervjuerna spelades in och transkriberades, därefter kunde den inhämtade information enklare analyseras och det viktigaste kunde plockas fram. Från den erhållna informationen gjordes analys och slutsats.Studien visar att en länk, i form av en kommunikationsprocess, mellan projektering och APD-planering existerar, men som i dagsläget inte är så glasklar. Analysen kom fram till att det finns en del som kan göras och är väldigt enkelt att implementera i byggprojekten. Från analysen framkom det exempelvis att alla tillfrågade från intervjuerna, tycker att det är viktigt med någon form av preliminär APD-plan. Byggprojektet STUDIO har varit ett unikt projekt och sätter en hög standard i byggbranschen, dock bör däremot produktionspersonal deltaga på projekteringsmöten för att bistå med sin kunskap från byggarbetsplatsen.
Considering that we are building in city centres, the construction site layout plan (CSLP) becomes a tool that construction projects cannot do without. It can either be created in 2D or 3D. Now that the construction industry is slowly beginning to realize the advantages of having a site layout plan in 3D, one is able to create well-devised plans that include needed information, which is also beneficial from a production engineering approach.The aim of this study is to examine the relationship between the construction design and the construction site layout plan and how the dialogue between the actors involved in the design and site layout planning can be improved. These questions have been answered by analysis of interviews with some persons who have been a part of the construction design and planning of the site in a project called STUDIO Malmö.The retrieval of information has been through interviews, review of Skanska's internal documents for Project STUDIO Malmö and by collecting useful information from literature.The study shows that a link between the construction design and the construction site layout plan exists, but that it is not clear in the current situation. The study also shows that there are suggestions on how to improve the communication that actually could work in the current situation.
APA, Harvard, Vancouver, ISO, and other styles
2

Rodriguez, Marvin O. "Automated peritoneal dialysis (APD) machine modeling." Thesis, California State University, Long Beach, 2017. http://pqdtopen.proquest.com/#viewpdf?dispub=10196401.

Full text
Abstract:

A peritoneal dialysis cycler model was developed to be used by biomedical device manufacturers in order to aid them in the system development, system level requirement writing, and FDA device certification process. This generic model can be used as a plug and play model for companies to incorporate a specific dialysis pump that is commercially available and quickly integrate it into their system. The Simulink model was used to simulate the system behavior and analyze multi domain dynamic systems data. A mathematical representation of the physical system was derived using fluid dynamic equations. The mathematical equations were then translated into Simulink blocks for the computer environment to understand. A proportional integral derivative controller was designed and integrated into the system in order to compensate the flow rate for any difference between the flow set point and the actual flow. System monitors were developed to protect patients from hazardous conditions.

APA, Harvard, Vancouver, ISO, and other styles
3

Alameri, Muhamed, and Mahmoud Zaaroura. "Visualisering av APD-Plan med hjälp av 3D och BIM : En studie om utveckling av APD-visualisering i byggbranschen." Thesis, Malmö universitet, Fakulteten för teknik och samhälle (TS), 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-40913.

Full text
Abstract:
Trots den nytta som BIM har på ett projekt så finns det fortfarande företag som väljer att skapa sina APD-planer på det traditionella arbetssättet. Det traditionella arbetssättet innebär att APD-planen upprättas på den gamla metoden som vanligtvis görs med 2D. Anledningen bakom att det fortfarande finns företag som upprättar APD-planer på den traditionella arbetsmetoden är att de inte finns någon tillräcklig vilja eller kunskap att ändra arbetsmetod trots att metoden anses vara osäker och tidskrävande. Det har istället förekommit en ny arbetsmetod för att frambringa planer och ritningar som ska ersätta den traditionella arbetsmetoden. Denna arbetsmetod skapar modeller i 3D där de ingående byggkomponenterna även innehåller information. Denna arbetsmetod kallas för BIM som står för byggnadsinformationsmodellering. Modellen som upprättas med BIM och som innehåller information om de tillgängliga byggkomponenterna kallas för BIM-modell. BIM som arbetsmetod kan i sin tur användas för att skapa APD-planer med hjälp av stödjande verktyg som tex SketchUp och Revit vilket medför många fördelar.  Denna studie syftar därför till att undersöka hur APD-plan visualiseras i dagens läge samt upplysa vilka faktorer som samtliga byggföretag ska beakta vid val av verktyg för visualisering av byggarbetsplatsen. Fördelar, nackdelar samt hinder kommer att lyftas fram i denna studie med hänsyn till 3D och BIM i syfte att undersöka vilken dimension det är som lämpar sig bäst för visualisering av APD-planen samt vilken dimension APD-planen visualiseras med i dagsläget. Ytterligare ett syfte är att undersöka var i byggprocessen som APD-Planen bör integreras. Fokus kommer ligga på att påvisa fördelarna med att utöka användandet av 3D respektive BIM-relaterade APD-visualiserings verktyg. Det som tas upp i frågeställningarna är vilka de olika fördelar respektive nackdelar samt hinder som finns med att tillämpa 3D och BIM vid visualisering av APD-plan. Dessutom görs två olika visualiseringar med 3D och BIM verktyg för att visa hur APD-planen visualiseras.       Den mest användbara dimensionen vid visualisering av APD-planen är 2D där APD-planen upprättas med Bluebeam. Det finns vissa företag som har övergått till 3D vid visualisering men som kombinerar med 2D ritningar eller skisser. Att visualisera med BIM har inte varit aktuellt för de samtliga intervjuade företagen. Däremot används de färdigprojekterade BIM modellerna som en del av 3D visualiseringen i syfte att skapa en så verklighetsanpassad visualisering som möjligt. Fördelarna med att visualisera en APD-plan med 3D och BIM-verktyg är att det ger en förverkligad bild på hur byggarbetsplatsen kommer att se ut och att risker, möjligheter och problem som inte skulle kunna upptäckas med 2D-modellen blir upptäckbara. Nackdelen däremot med att visualisera en APD-plan med 3D eller BIM-verktyg är att filerna kan bli alltför tunga vilket leder i sin tur till verktyget blir svår hanterligt samt upplevs som hackigt. Det som dock hindrar många ifrån att implementera 3D och BIM-relaterade verktyg är den mänskliga faktorn som sätter stop för utvecklingen, där människans bekvämligheter och arbetsrutiner är avgörande för implementeringen av verktygen. De absolut viktigaste faktorer som ett företag bör beakta vid val av verktyg vid visualisering av APD-plan är Lönsamhet, användarupplevelse, kompatibilitet och support.
Despite the benefits that BIM has on a project, there are still companies that choose to create their APD plans in the traditional way. The reason why there are still companies that draw up APD plans on the traditional working method is that they do not have sufficient will or knowledge to change working method despite the method being considered uncertain and time consuming. Instead, there has been a new working method for producing plans and drawings that will replace the traditional working method. This working method creates models in 3D where the constituent building components also contain information. This working method is known as BIM as a wound for building information modeling. The model that is established with BIM and which contains information about the available building components is called the BIM model. BIM as a working method can in turn be used to create APD plans with the help of supporting tools such as SketchUp and Revit, which brings many benefits. This study therefore aims to investigate how APD plans are visualized in the current situation and to inform which factors all construction companies must take into account when choosing tools for visualization of the construction site. Advantages, disadvantages and obstacles will be highlighted in this study with regard to 3D and BIM in order to investigate which dimension is best suited for visualization of the APD plan and which dimension the APD plan is visualized with at present. Another purpose is to investigate where in the construction process the APD Plan should be integrated. The focus will be on demonstrating the benefits of expanding the use of 3D and BIM-related APD visualization tools, respectively. What is addressed in the issues is what are the different advantages and disadvantages as well as obstacles that exist with applying 3D and BIM when visualizing APD plans. In addition, two different visualizations are made with 3D and BIM tools to show how the APD plan is visualized. The most useful dimension in visualizing the APD plan is 2D where the APD plan is created with Bluebeam. There are some companies that have switched to 3D in visualization but which are combined with 2D drawings or sketches. Visualization with BIM has not been relevant for all the companies interviewed. On the other hand, the pre-designed BIM models are used as part of the 3D visualization in order to create as realistic a visualization as possible. The advantages of visualizing an APD plan with 3D and BIM tools are that it provides a realistic picture of what the construction site will look like and that risks, opportunities and problems that could not be detected with the 2D model become detectable. The disadvantage, however, of visualizing an APD plan with 3D or BIM tools is that the files can become too heavy, which in turn leads to the tool becoming difficult to handle and perceived as choppy. However, what prevents many from implementing 3D and BIM-related tools is the human factor that puts a stop to development, where human conveniences and work routines are crucial for the implementation of the tools. The most important factors that a company should consider when choosing tools when visualizing APD plans are Profitability, user experience, compatibility and support.
APA, Harvard, Vancouver, ISO, and other styles
4

Cordeiro, José Pedro Lopes. "APD Portugal - PALOP : estratégia, determinantes e motivações." Master's thesis, Instituto Superior de Economia e Gestão, 2010. http://hdl.handle.net/10400.5/2143.

Full text
Abstract:
Mestrado em Desenvolvimento e Cooperação Internacional
Os fluxos de Ajuda Pública ao Desenvolvimento entre Portugal e os PALOP têm sido objecto de análise que, as mais das vezes, se fica pela leitura da evolução quantitativa dos seus valores. Partindo de uma observação da dinâmica da cooperação internacional e portuguesa e com apoio de dados estatísticos e modelos econométricos, a presente dissertação procura desvendar a estratégia, as motivações, os interesses e os determinantes que estão na origem de tais fluxos. Com base nos resultados atingidos, concluir-se-á acerca da importância de motivações humanitárias, económicas, comerciais, políticas, geoestratégicas e relacionadas com o passado colonial, bem como de questões transversais, na dinâmica dos fluxos de APD.
The ODA flows between Portugal and the Portuguese-Speaking African Countries have been thoroughly studied, but most of the times in a perspective that doesn´t go beyond the analysis of the quantitative evolution of the data. This paper aims to observe the strategy, the motivations, the interests and the determinants of this type of flows, starting from the observation of the international and Portuguese cooperation dynamics and with the support of statistical and econometric models. Based on the final results of the model, the importance of humanitarian, economical, commercial, political, geostrategic and past colonial experience motivations will be discussed, as well as other transversal aspects of the ODA flows.
APA, Harvard, Vancouver, ISO, and other styles
5

Markström, Jörgen, and Jonas Hesselroth. "APD- och logistikplaner i samband med väderskyddat byggande." Thesis, Halmstad University, School of Business and Engineering (SET), 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-4945.

Full text
Abstract:

Avsikten med projektet har varit att hitta skillnader i APD- och logistikplaner i samband med väderskyddat byggande gentemot traditionellt byggande där väderskydd inte används. Spelar APD-planen en viktig roll när det gäller väderskydd? Kan man effektivisera byggandet med en smart APD- och logistikplan? Med hjälp av litteratur och fallstudier är detta frågor som vi ska försöka besvara. Använd litteratur består av forskarrapporter och tidigare examensarbeten. Projektet består av fallstudier där tre platschefer intervjuats. Efter intervjuerna sammanställdes platschefernas svar där likheter och skillnader tas upp.

Resultatet från undersökta projekt visar att det är beroende på väderskyddets utseende om det är någon skillnad på utformning av logistikplaner. APD-planerna på de tre fallstudierna skiljer sig inte mot traditionellt byggande, det är samma tankegång.

Samtliga platschefer säger att det ofta är problem med logistiken till byggarbetsplatsen. Vi tror inte enbart det beror på de leverantörer som levererar material utan att det är hela kedjan från råmaterial till färdig produkt. Det blir en dominoeffekt där den sista aktören i kedjan är den som blir mest drabbad. Om logistikkedjan från råmaterial till färdig produkt kan optimeras borde förseningar av leveranser till byggarbetsplasten kunna minskas. Vilket leder fram till att det finns pengar att spara för byggföretagen.

APA, Harvard, Vancouver, ISO, and other styles
6

Horkley, Benjamin William. "Optical communications with a Geiger mode APD array." Thesis, Massachusetts Institute of Technology, 2016. http://hdl.handle.net/1721.1/106009.

Full text
Abstract:
Thesis: M. Eng., Massachusetts Institute of Technology, Department of Electrical Engineering and Computer Science, 2016.
This electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.
Cataloged from student-submitted PDF version of thesis.
Includes bibliographical references (pages 47-48).
In this thesis, I evaluated the theoretical and practical performance of a Geiger mode avalanche photodiode (GM-APD, or Geiger mode APD) array for use in optical communications systems. I designed and implemented a test pattern generator, capable of producing waveforms with OOK and PPM modulations at a variety of symbol rates and duty cycles. Using this pattern generator, I tested the receiver properties over a wide range of data rates and illumination levels, and was able to demonstrate the capability for error-free communications in both modulation formats, up to 78.8 Mbps at a sensitivity of 1.8 photons per bit for OOK, and 34.9 Mbps at 2 photons per bit for PPM.
by Benjamin William Horkley.
M. Eng.
APA, Harvard, Vancouver, ISO, and other styles
7

Kale, Zuhal. "Low Temperature Operation Of Apd For Quantum Cryptographic Applications." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606113/index.pdf.

Full text
Abstract:
This thesis explains low temperature operation of an InGaAs Avalanche Photo Diode (APD) cooled using thermoelectric coolers in order to utilize in the quantum cryptographic applications. A theoretical background for the equipment used in the experiment was provided. Circuitry and mechanics used for the low temperature operation were designed. Performance measures for APD were explained and experiment results were presented.
APA, Harvard, Vancouver, ISO, and other styles
8

Abautret, Johan. "Conception, fabrication et caractérisation de photodiodes à avalanche InSb." Thesis, Montpellier 2, 2014. http://www.theses.fr/2014MON20232.

Full text
Abstract:
Cette thèse, réalisée à l'IES en partenariat avec la société SOFRADIR et le CEA-LETI, avait pour objectif d'évaluer les potentialités du matériau InSb pour la réalisation de photodiodes à avalanche (APD) moyen infrarouge (MWIR). Par l'étude du design (simulations TCAD), de la fabrication technologique en configuration MESA (voie humide, voie sèche, passivation), puis par la caractérisation électrique des dispositifs, ce travail de thèse s'est attaché à explorer l'ensemble des éléments nécessaires au développement de cette filière de photodétecteurs. Les photodiodes InSb fabriquées par épitaxie par jets moléculaires (EJM) ont présenté des densités de courant d'obscurité sur des monoléments de 10 à 30nA/cm² à -50mV et à 77K. Ces performances positionnent ces photodiodes à l'état de l'art pour la filière épi-InSb et souligne ainsi l'excellente qualité cristalline des couches épitaxiées. Les premières APDs InSb ont ensuite été épitaxiées et caractérisées. Avec une pure injection d'électrons nous avons observé une augmentation exponentielle du gain dans l'InSb, signature d'une multiplication initiée exclusivement par les électrons. Un premier gain de 3 à -4V a été mesuré. Cette asymétrie du processus d'ionisation par impact indiquerait la possibilité d'obtenir du gain sans excès de bruit, propriété indispensable pour les applications d'imagerie faible flux visée. A ce stade de l'étude, les performances des APDs InSb sont limitées par un dopage résiduel trop élevé dans les zones de multiplications réalisées, entrainant une forte contribution du courant tunnel bande à bande. Néanmoins, ces travaux fournissent tous les éléments d'orientations nécessaires au développement des APDs InSb dont le point clé est définitivement l'obtention d'un faible dopage résiduel dans la zone de multiplication
This thesis realized at the IES, with the collaboration of SOFRADIR and the CEA-LETI, had for objective the potential evaluation of the InSb material for the realization of midwave infrared (MWIR) avalanche photodiodes (APD). Studying the design (TCAD modeling), the MESA technological fabrication (wet etching, dry etching, passivation) and analyzing the electrical characterizations of devices fabricated, this work has investigated all the scientific elements necessary for the development of this photodetector technology. The MBE (Molecular Beam Epitaxy) grow InSb photodiodes have shown monopixel dark current density from 10 to 30nA/cm² at -50mV and 77K. These performances are at the state of the art for InSb epi-diodes and highlight the excellent crystal quality of the epitaxial layers. The first InSb APDs were grown and characterized. With a pure electron injection, we have observed an exponential increase of the gain, signature of a single carrier multiplication exclusively initiated by the electrons. A gain value of 3 was measured at -4V. This asymmetrical aspect of the impact ionization process would indicate the possibility to obtain a gain without excess noise. This is fundamental for the intended imaging applications. At this stage, InSb APD performances are limited by a too high residual doping level, resulting in a strong band to band tunneling current. Nevertheless, this work provides all the milestones needed for the InSb APD development where the key point is undoubtedly the getting of low residual doping level in the multiplication layer
APA, Harvard, Vancouver, ISO, and other styles
9

Ahlander, Alfred, and Pontus Ekroth. "Kommunikationsmodell för APD-plan vid användning av materialrutor och gångstråk." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik och belysningsvetenskap, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-36816.

Full text
Abstract:
Syfte: Platsbyggd byggnadsproduktion är en komplicerad process. En tillfällig fabrik, med nya materialupplag och nytt arbetsplatsområde upprättas vid varje enskilt projekt, vilket komplicerar processen ytterligare. Materialhanteringen utgör en stor besparingsmöjlighet i byggnadsprojekt och 40 % av tiden som förloras på en byggarbetsplats kan tillskrivas materialhantering. För att få bukt med slöseri kopplat till materialhantering krävs en väl bearbetad logistikplanering, fungerande kommunikation samt kunskapsbeaktning från tidigare genomförda projekt. Studiens mål är därför att identifiera förbättringsåtgärder gällande användning av materialrutor och gångstråk, samt skapa en kommunikationsmodell för arbetsplatsdispositionsplanen (APD-planen) som stödjer erfarenhetsåterföring. Metod: Studien har utfört fallstudier på två projekt inom NCC:s organisation. Kvalitativ datainsamling i form av litteraturstudie, intervjuer, dokumentanalys och observation har använts. Semistrukturerade intervjuer har utförts och innefattar sju respondenter med olika befattningar inom byggbranschen. Resultat: Studien har tagit fram faktorer som bör beaktas vid planeringen av materialrutor och gångstråk. Vidare visar resultatet att det krävs resurser och strukturerade processer för att erfarenhetsåterföring i byggnadsprojekt skall fungera. För att lyckas med användningen av materialrutor och gångstråk krävs god kommunikation av APD-planen. I studien har även en kommunikationsmodell av APDplanen som stödjer erfarenhetsåterföring tagits fram. Konsekvenser: Det är under inköps- och leveransplaneringen som förutsättningarna för materialrutor och gångstråk sätts, därför bör APD-planen vara mer i fokus under detta skede. En förutsättning för att användningen av materialrutor och gångstråk skall fungera är att det finns resurser som stödjer platsledningen vid planering och utförandet. Genom att använda sig av logistikresurser inom organisationen underlättas planering och hantering av material på byggarbetsplatsen och insamlade erfarenheter kan förmedlas mellan projekt. Ute i produktionen bör det finnas en ansvarig godsmottagare som är extra insatt i APD-planen och materialrutor, genom kontinuerlig kommunikation med platsledning och logistikresurs. Begränsningar: Eftersom arbetet endast omfattar studie av två byggnadsprojekt finns det en begränsning i vilka faktorer och resonemang som lyfts fram. Även om resultatet grundas från två byggnadsprojekt är de grundläggande processerna och händelseförloppen vid uppförande av byggnader likartade och resultatet kan därför tillämpas på liknande byggnadsprojekt.
Purpose: On-site construction is a complicated process. A temporary factory, with new zones for materials and workplace area must be established for each new project, which complicates the process further. Material management stands for a big saving opportunity in building projects and 40 % of the time lost on a construction site can be attributed to material management.  To overcome this waste connected to material management a well-processed logistics planning, god communication as well as experience feedback from previous projects is required. The aim for this thesis is therefore to identify improvement measure regarding the use of material-dedicated buffer zones and walking paths, and as well as create a model of communication that supports experience feedback. Method The thesis is a case study on two projects within the organization of NCC.  A qualitative data collection with literature review, interviews, document analysis and observation has been conducted. Semi-structured interviews have been conducted and includes seven respondents with different position within the construction industry. Findings: The thesis has produced factors that should be taken into consideration when material zones and walking paths are planned. The result shows that resources and structured processes are required if experience feedback should work during the construction project. To succeed with the use of material-dedicated buffer zones and walking paths, good communication of the construction site plan is needed. Furthermore, the thesis has resulted in a model of communication that supports experience feedback.   Implications: It’s during the purchase and delivery planning that the conditions for the material-dedicated buffer zones and walking paths are set, therefore the construction site planning should be involved more in this phase. A prerequisite for using dedicated material zones and walking paths are resources which supports the construction management with planning and performance. By using logistic resources within the organization facilitates planning and management of material at the construction site, enables that collected experience can be conveyed between projects. In the production there should be a responsible receiver of material deliveries, who is extra briefed in the constructions site plan and the material-dedicated buffer zones through continuous communication with the construction management and logistic resource. Limitations: Since the thesis only includes two building projects, there is a limitation of the factors and arguments that are treated. Although the result is based on two building projects the fundamental processes and course of events are similar and can therefore be applied on other building projects.
APA, Harvard, Vancouver, ISO, and other styles
10

Persson, Anton, and Anton Thunholm. "Designing the construction site - A study of the construction site layout plan with focus on positioning and synergy." Thesis, Linköpings universitet, Medie- och Informationsteknik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-95243.

Full text
Abstract:
Svenska städer har det senaste århundradet växt sig täta vilket medfört utmaningar både konstruktions-, planerings- och logistikmässigt. Slöseri på byggarbetsplatser är väsentligt högre än på andra arbetsplatser och undersökningen Slöseri i byggprojekt visar att det uppgår i så mycket som 30-35% av projektets produktionskostnad. Produktionsprocessen är det som tillför värde till objektet och enligt rapporten Planering i svensk byggproduktion påverkas produktionen till stor del av planering och styrning. Med hjälp av en arbetsplatsdispositionsplan (APD-plan) och ett genomtänkt system för leveranser och godsmottagning kan detta behjälpas. Syftet med denna rapport var att identifiera styrande faktorer som påverkar upprättandet av APD-planer. Detta mynnade ut i ett antal råd som ska vara till hjälp och bidra till ett kostnadseffektivt och produktivt utförande. Arbetet inleddes med litteraturstudie som följdes av intervjuundersökning. Målgruppen för intervjuerna var en konsult inom bygglogistik och yrkeserfarna från byggbranschen. En fallstudie genomfördes för att undersöka data från teori och intervjuer. Att ha en bra APD-plan genererar en rad fördelar. Den främsta av dessa är att den säkerställer att flödet på arbetsplatsen fungerar på ett tillfredställande sätt. Undersökningen visar att byggbranschens aktörer är medvetna om APD-planens roll i byggprocessen men har olika uppfattning om dess betydelse, hur den bör användas samt hur och när den tas fram. Genom att i ett tidigt skede analysera samverkan mellan arbetsplatsinrättningar med avseende på både generaliserbara och projektspecifika faktorer kan en väl fungerande arbetsplats etableras.
APA, Harvard, Vancouver, ISO, and other styles
11

Thomasson, Linn, and Martin Guldbrand. "Använda dynamisk APD-plan i 4D som ett planeringsverktyg vid industriellt bostadsbyggande." Thesis, Malmö universitet, Fakulteten för teknik och samhälle (TS), 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-20647.

Full text
APA, Harvard, Vancouver, ISO, and other styles
12

Nascimento, Diana Raquel Leonardo do. "A cooperação para o desenvolvimento : deve Portugal continuar a contribuir para APD." Master's thesis, Faculdade de Ciências Sociais e Humanas, Universidade Nova de Lisboa, 2012. http://hdl.handle.net/10362/8311.

Full text
Abstract:
Dissertação apresentada para cumprimento dos requisitos necessários à obtenção do grau de Mestre em Ciência Política e Relações Internacionais
Esta Dissertação aborda a temática da Cooperação para o Desenvolvimento, enquanto vertente das Relações Internacionais. É compreendido e justificado o fenómeno da Cooperação entre os países à luz das Teorias de Relações Internacionais, afigurando-se a Teoria Liberal como a que melhor permite compreender o fenómeno em si mesmo. Entende-se a temática da Ajuda Pública ao Desenvolvimento, na sua forma e essência, atores envolvidos, assim como os principais argumentos a favor e contra que surgem no debate internacional em torno desta questão. Do ambiente teórico partir-se-á para a análise do caso Português, caraterizando-se a Cooperação Portuguesa em termos da sua política, principais destinatários e a forma que assume. No final, responde-se à questão de partida: Deve Portugal continuar a contribuir para a APD? Da análise feita, abre-se espaço para uma sugestão de mudança de políticas públicas em torno da Cooperação para o Desenvolvimento em Portugal.
APA, Harvard, Vancouver, ISO, and other styles
13

Baker, Kenneth R. "Importance sampling simulation of free-space optical APD pulse position modulation receivers." Diss., This resource online, 1993. http://scholar.lib.vt.edu/theses/available/etd-06062008-172207/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
14

Pérez, Rodenas Ezequiel. "QAM and PSK Modulation Schemes under Impulsive Noise." Thesis, Högskolan i Gävle, Avdelningen för elektronik, matematik och naturvetenskap, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-11943.

Full text
Abstract:
Nowadays most of the communications systems are designed considering only to work under AWGN (Additive White Gaussian Noise). But the implementation of wireless systems in industrial facilities brings different kind of interference from machines or any other kind of electronic devices. Some of them are sources of randomly and high power noise, which commonly is known as impulsive noise. The objective in this thesis is to study the impact of the impulsive noise on a communication using QAM (Quadrature Amplitude Modulation) and PSK (Phase-Shift Keying) schemes, by observing the BER (Bit Error Rate) and the APD (Amplitude Probability Distribution). For that, it is developed a measurement method that will be used in a real industrial environment in future work.      The content of this thesis is divided in two parts. In the first part is made a program in MATLAB to simulate the communication through a noisy channel. Then is developed a measurement method which is tested in three different ways corresponding to 3 different outputs of an spectrum analyzer, namely, 20,4 MHz IF output, video output and IQ data output.      The relation of impulsive noise is presented in the second part with different statistical properties in the BER and the APD, in the setup with the best performance. At the end of the thesis a concluding section summarizes the results obtained during the work and some lines of future work in a real industrial environment with the developed method.
APA, Harvard, Vancouver, ISO, and other styles
15

Jalal, Pasheu, and Mohamad Majed. "A research about logistical problems and solutions in the construction industry." Thesis, Linköpings universitet, Medie- och Informationsteknik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-103828.

Full text
Abstract:
Byggbranschen har på senare tid kännetecknats av höga kostnader och ineffektivitet. Byggtiderna blir allt längre och produktivitetsutvecklingen har länge haft en låg utveckling jämfört med andra branscher. Denna studie syftar till att sammanställa studier inom bygglogistik som gjorts de senaste 10 åren. Studien riktar sig till examensarbeten som handlar om bygglogistik och att sammanställa dessa efter problem och lösningar inom byggbranschen. Studien är uppdelad i två delar, en bred och en djup undersökning. I den breda undersökningen gallras, kategoriseras och klassificeras examensarbetet. Denna del utgör sedan en grund till urvalet av examensarbeten i den djupa undersökningen. I den djupa undersökningen analyseras de specifikt utvalda examensarbetena och sammanställs i tabell efter problem och lösningar. Resultatet av denna studie visar vilka problem och lösningar som är vanligast förekommande inom byggbranschen. Det visar även vilka lösningar som är vanligast till ett specifikt problem som fastställts med hjälp av de sammanställda rapporterna.
APA, Harvard, Vancouver, ISO, and other styles
16

Shahin, Fredrik, and Haya Al-Samarrai. "EFFEKTIVISERING AV LOGISTIKFLÖDET." Thesis, KTH, Byggteknik och design, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-223379.

Full text
Abstract:
Idag är ett av de mer komplicerade byggprojekten i Sverige i full gång, nämligen ombyggnationen av Slussen i Stockholm. Orsakerna till detta är bland annat att den tidigare Slussen var i så pass dåligt skick och att Mälarens reglering behöver förändras för att möjliggöra en ökad avtappning av vatten. Beläget mitt i stan och med cirka 450 000 människor som passerar denna mötesplats dagligen så får de parter som är med och bidrar till ombyggnationen begränsade förutsättningar.Skanska är ett av de många företag som är med och möjliggör ombyggnationen av den Nya Slussen och syftet med detta arbete är att undersöka hur man kan effektivisera logistikflödet på en av Skanskas entreprenader, SN 81 Konstbyggnad Land. Målet med studien har varit att lokalisera de olika parametrar som påverkar logistikflödet negativt. Det primära målet har sedan varit att presentera åtgärdsförslag som skall öka den värdeskapande tiden på arbetsplatsen och minska/eliminera slöseriposter kopplade till bygget.Metoden som valts för detta arbete har varit en kombination av litteraturstudier, enkätundersökning och intervjuer. Enkätundersökningen delades enbart ut till yrkesarbetarna på projektet och intervjuerna har endast utförts för tjänstemän på projektet som valts ut efter erfarenhet och befattning för att få en nyanserad bild av ämnet.Efter arbetets gång har de kritiska parametrar som påverkar logistikflödet negativt lokaliserats, Ytor, kommunikation och struktur. Rekommendationer har sedan arbetas fram som skall öka den värdeskapande tiden samt eliminera slöseriposterna. Åtgärdsförslagen som jobbades fram blev en uppdaterad APD-plan med upplagsytor tilldelade, extern upplagsyta, bättre kommunikation, förenklad protokollföring och avslutningsvis en strukturerad arbetsplats.
Today, one of the more complicated construction projects in Sweden is in full swing, namely the rebuilding of Slussen in Stockholm. The reasons for this are, among other things, that the former Slussen is in such a bad condition, and that the Mälaren regulation needs to be changed to allow for increased drawing of water. Located in the middle of the city and with about 450,000 people passing this meeting place daily, the parties involved to the reconstruction have limited conditions.Skanska is one of the many companies involved in enabling the rebuilding of Nya Slussen and the purpose of this work is to investigate how to streamline the logistics flow on one of Skanska's construction projects, SN 81 Art Construction Land. The aim of the study has been to locate the different parameters that adversely affect the logistics flow. The primary objective has since been to present action proposals that will increase value creation at the workplace and reduce / eliminate the waste items associated with the building.The method chosen for this study has been a combination of literature studies, survey and interviews. The survey was only shared with the construction workers on the project and the interviews have only been carried out for officials on the project selected according to experience and position to get a nuanced image of the subject.After this study, the critical parameters that affect the logistics flow negatively have been located. Space, communication and structure. Recommendations have then been worked out to increase value creation time and eliminate / reduce wasting items. The action proposals that were developed became an updated APD plan with storage areas given, external storage space, improved communication, simplified protocol management and, finally a structured worksite.
APA, Harvard, Vancouver, ISO, and other styles
17

Crespo, Paulo. "Optimization of In-Beam Positron Emission Tomography for Monitoring Heavy Ion Tumor Therapy." Forschungszentrum Dresden, 2010. http://nbn-resolving.de/urn:nbn:de:bsz:d120-qucosa-28512.

Full text
Abstract:
In-beam positron emission tomography (in-beam PET) is currently the only method for an in-situ monitoring of highly tumor-conformed charged hadron therapy. In such therapy, the clinical effect of deviations from treatment planning is highly minimized by implementing safety margins around the tumor and selecting proper beam portals. Nevertheless, in-beam PET is able to detect eventual, undesirable range deviations and anatomical modifications during fractionated irradiation, to verify the accuracy of the beam portal delivered and to provide the radiotherapist with an estimation of the difference in dosage if the treatment delivered differs from the planned one. In a first study within this work, a set of simulation and fully-3D reconstruction routines shows that minimizing the opening angle of a cylindrical camera is determinant for an optimum quality of the in-beam PET images. The study yields two favorite detector geometries: a closed ring or a dual-head tomograph with narrow gaps. The implementation of either detector geometry onto an isocentric, ion beam delivery (gantry) is feasible by mounting the PET scanner at the beam nozzle. The implementation of an in-beam PET scanner with the mentioned detector geometries at therapeutic sites with a fixed, horizontal beam line is also feasible. Nevertheless, knowing that previous in-beam PET research in Berkeley was abandoned due to detector activation (Bismuth Germanate, BGO), arising most probably from passive beam shaping contaminations, the proposed detector configurations had to be tested in-beam. For that, BGO was substituted with a state-of-the-art scintillator (lutetium oxyorthosilicate, LSO) and two position sensitive detectors were built. Each detector contains 32 pixels, consisting of LSO finger-like crystals coupled to avalanche photodiode arrays (APDA). In order to readout the two detectors operated in coincidence, either in standalone mode or at the GSI medical beam line, a multi-channel, zero-suppressing free, list mode data acquisition system was built.The APDA were chosen for scintillation detection instead of photomultiplier tubes (PMT) due to their higher compactness and magnetic field resistance. A magnetic field resistant detector is necessary if the in-beam PET scanner is operated close to the last beam bending magnet, due to its fringe magnetic field. This is the case at the isocentric, ion beam delivery planned for the dedicated, heavy ion hospital facility under construction in Heidelberg, Germany. In-beam imaging with the LSO/APDA detectors positioned at small target angles, both upbeam and downbeam from the target, was successful. This proves that the detectors provide a solution for the proposed next-generation, improved in-beam PET scanners. Further confirming this result are germanium-detector-based, spectroscopic gamma-ray measurements: no scintillator activation is observed in patient irradiation conditions. Although a closed ring or a dual-head tomograph with narrow gaps is expected to provide improved in-beam PET images, low count rates in in-beam PET represent a second problem to image quality. More importantly, new accelerator developments will further enhance this problem to the point of making impossible in-beam PET data taking if the present acquisition system is used. For these reasons, two random-suppression methods allowing to collect in-beam PET events even during particle extraction were tested. Image counts raised almost twofold. This proves that the methods and associated data acquisition technique provide a solution for next-generation, in-beam positron emission tomographs installed at synchrotron or cyclotron radiotherapy facilities.
APA, Harvard, Vancouver, ISO, and other styles
18

Sjögren, Lucas, and Alex Sunesson. "Hantering av logistik på svåråtkomliga platser : En studie om materialhantering och informationsflöde vid byggprojekt i innerstadsmiljö." Thesis, Högskolan i Halmstad, Akademin för ekonomi, teknik och naturvetenskap, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-32085.

Full text
Abstract:
One of the essential factors for a functional and hassle free construction project is well planned and organized logistics. At urban construction sites that are characterized by limited space and constant challenges given by the conditions of the location, it becomes even more relevant to plan meticulously. It is a fact that the construction business has its flaws when it comes to manage the different types of wastes that are within, and constantly working with logistics is the only way to effectively use the resources, both economically and in terms of time. This paper will from this background enlighten the logistical problems that emerge because of the conditions in the city, identify the most critical, and observe how they are taken care of. From our observations we noticed that lack of space and a poor communication between operators in and around the project, often is the common denominator when problems surface and are especially important to manage in inner-city projects. The issues seem to be connected to a very complex logistic network, where it’s hard to coordinate the operators further down in line. This also differs a lot depending on the size of the project, and the smaller sites often have less logistic awareness.
APA, Harvard, Vancouver, ISO, and other styles
19

Crespo, Paulo. "Optimization of In-Beam Positron Emission Tomography for Monitoring Heavy Ion Tumor Therapy." Forschungszentrum Rossendorf, 2006. https://hzdr.qucosa.de/id/qucosa%3A21679.

Full text
Abstract:
In-beam positron emission tomography (in-beam PET) is currently the only method for an in-situ monitoring of highly tumor-conformed charged hadron therapy. In such therapy, the clinical effect of deviations from treatment planning is highly minimized by implementing safety margins around the tumor and selecting proper beam portals. Nevertheless, in-beam PET is able to detect eventual, undesirable range deviations and anatomical modifications during fractionated irradiation, to verify the accuracy of the beam portal delivered and to provide the radiotherapist with an estimation of the difference in dosage if the treatment delivered differs from the planned one. In a first study within this work, a set of simulation and fully-3D reconstruction routines shows that minimizing the opening angle of a cylindrical camera is determinant for an optimum quality of the in-beam PET images. The study yields two favorite detector geometries: a closed ring or a dual-head tomograph with narrow gaps. The implementation of either detector geometry onto an isocentric, ion beam delivery (gantry) is feasible by mounting the PET scanner at the beam nozzle. The implementation of an in-beam PET scanner with the mentioned detector geometries at therapeutic sites with a fixed, horizontal beam line is also feasible. Nevertheless, knowing that previous in-beam PET research in Berkeley was abandoned due to detector activation (Bismuth Germanate, BGO), arising most probably from passive beam shaping contaminations, the proposed detector configurations had to be tested in-beam. For that, BGO was substituted with a state-of-the-art scintillator (lutetium oxyorthosilicate, LSO) and two position sensitive detectors were built. Each detector contains 32 pixels, consisting of LSO finger-like crystals coupled to avalanche photodiode arrays (APDA). In order to readout the two detectors operated in coincidence, either in standalone mode or at the GSI medical beam line, a multi-channel, zero-suppressing free, list mode data acquisition system was built.The APDA were chosen for scintillation detection instead of photomultiplier tubes (PMT) due to their higher compactness and magnetic field resistance. A magnetic field resistant detector is necessary if the in-beam PET scanner is operated close to the last beam bending magnet, due to its fringe magnetic field. This is the case at the isocentric, ion beam delivery planned for the dedicated, heavy ion hospital facility under construction in Heidelberg, Germany. In-beam imaging with the LSO/APDA detectors positioned at small target angles, both upbeam and downbeam from the target, was successful. This proves that the detectors provide a solution for the proposed next-generation, improved in-beam PET scanners. Further confirming this result are germanium-detector-based, spectroscopic gamma-ray measurements: no scintillator activation is observed in patient irradiation conditions. Although a closed ring or a dual-head tomograph with narrow gaps is expected to provide improved in-beam PET images, low count rates in in-beam PET represent a second problem to image quality. More importantly, new accelerator developments will further enhance this problem to the point of making impossible in-beam PET data taking if the present acquisition system is used. For these reasons, two random-suppression methods allowing to collect in-beam PET events even during particle extraction were tested. Image counts raised almost twofold. This proves that the methods and associated data acquisition technique provide a solution for next-generation, in-beam positron emission tomographs installed at synchrotron or cyclotron radiotherapy facilities.
APA, Harvard, Vancouver, ISO, and other styles
20

Mitra, Ankush. "Development of an APD amplifier for the runtime alignment of the ATLAS inner detector and SUSY studies." Thesis, University of Oxford, 2002. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.249503.

Full text
APA, Harvard, Vancouver, ISO, and other styles
21

Magampa, Philemon Podile. "Electrochemical studies of the ligand 1-hydroxyl-3-aminopropilydenediphoshonic acid (APD) towards bone cancer therapy." Pretoria : [s.n.], 2006. http://upetd.up.ac.za/thesis/available/etd-08222007-162845.

Full text
APA, Harvard, Vancouver, ISO, and other styles
22

Magampa, Philemon Podile. "Electrochemical studies of the ligand 1-hydroxyl-3-aminopropilydenephosphonic acid (APD) towards bone cancer therapy." Diss., University of Pretoria, 2006. http://hdl.handle.net/2263/27457.

Full text
Abstract:
The stability constants for the ligand 1-hydroxyl-3-aminopropilydene diphosphonic acid (APD) or Pamidronate with metal ions CdII, PbII and ZnII were established in this work by sampled direct current polarography (DCTAST). Due to precipitation of the metal-ligand complexes in the pH range about 4.0 to 5.0 at typical glass electrode potentiometric conditions, these systems could not be studied by glass electrode potentiometry (GEP). The concept of Virtual Potentiometry (VP) was used in the modelling of the metal-ligand system and refinement of stability constants to evaluate further the metal-ligand models derived from DCTAST. Virtual potentiometry uses virtual potentials to refine polarographic data by employing dedicated potentiometric software, ESTA. The structure of the metal complexes determined in this work is also proposed and compared to the reported crystal structures of the metal complexes of the ligand APD. The Linear Free Energy Relationship, LFER (log KML′ vs. log KM(OH) ) for the ligand APD is derived here for the first time using the log KML′ values from literature as well as the values for CdII, PbII and ZnII determined in this work. The log KML′ values of 153SmIII–APD and 166HoIII–APD, which cannot be determined by these two techniques (GEP and DCTAST), were predicted in this work using the LFER methodology.
Dissertation (MSc (Chemistry))--University of Pretoria, 2006.
Chemistry
MSc
Unrestricted
APA, Harvard, Vancouver, ISO, and other styles
23

Eklöf, Fredrik, and Daniel Eriksson. "Bygglogistik : en undersökning av bygglogistiken kring Hulta Torg." Thesis, Högskolan i Borås, Akademin för textil, teknik och ekonomi, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-21201.

Full text
Abstract:
Arbetsplatslogistiken inom byggbranschen har under många år undersökts och det finns stora möjligheter till förbättring. Det har kunnat konstateras att genom en förbättrad logistik går det att öka lönsamheten. Under senare år har en ny gren inom logistiken växt fram, tredjepartslogistik. Arbetet undersöker om tredjepartslogistik med inbärning till monteringsplatsen är ett lönsamt alternativ för Hulta Torg, samt att upprätta en inre arbetsplatsdispositionsplan (APD-plan) och lägga fram ett förslag.   Undersökningen har genomförts genom litteraturstudier och intervjuer. Litteraturstudien har fokuserats på bygglogistik och tredjepartslogistik och intervjuerna har förts med olika yrkesroller inom byggbranschen.  Resultatet visar att det finns brister i kommunikationen generellt inom byggbranschen och att det inom branschen finns utrymme till förbättring. Det är framförallt dialogen mellan huvudentreprenören och underentreprenören samt telefonaviseringen mellan leverantören och entreprenören det brister. Nyttjandet av en tredjepartslogistiker för att sköta inbärningen av material ställer sig branschen positiv till och det har kunnat konstaterats att det med största sannolikhet kommer att öka i framtiden. I resultatet presenteras en inre APD-plan som beskriver var material ska placeras för att få en så effektiv inre logistik som möjligt.   För att förbättra kommunikationen föreslås att varje morgon ha ett möte mellan huvudentreprenören och underentreprenören där dagens aktiviteter diskuteras. En tavla med leveransplaner som alla kan ta del av och uppdatera rekommenderas också. Entreprenören måste ställa högre krav på leverantören och ha det skriftligt i avtalen, efterföljs inte detta tas inte leveranserna emot. Kostnaden av en tredjepartslogistiker är dyrare än om entreprenören gjort det själv men de vinner produktionstimmar och att en kritisk del som hissen nyttjas även utanför ordinarie arbetstid. På den inre APD-planen placeras materialet nära där det ska monteras och gipsen ställs i mitten av rummen där ingen innervägg kommer att stå.
Workplace logistics in the construction industry has been investigated for many years and there are great opportunities for improvement. It has been found that through improved logistics, profits can be increased. In recent years, a new branch of logistics has emerged, third-party logistics. The exam is investigating whether third party logistics with carrying support to the installation site is a profitable alternative for Hulta Torg, as well as establishing an internal workplace deployment plan and presenting a proposal that will benefit production.  The essay has been conducted through literature studies and interviews. The literature study has focused on building logistics and third-party logistics and the interviews have been conducted with different occupational roles in the construction industry.  The results show that there are shortcomings in communication generally in the construction industry and that there is room for improvement in the industry. It is primarily the dialogue between the main contractor and the subcontractor, as well as the notification between the supplier and the contractor, is lacking. The use of a third-party logistics to handle the delivery of materials benefits the industry and it has been found that it is most likely to increase in the future. The result presents an internal workplace deployment plan that describes where materials should be placed to get as efficient internal logistics as possible.  In order to improve communication, it is proposed that each morning have a meeting between the main contractor and the subcontractor where the activities of the day are discussed. A schedule of delivery plans that anyone can access and update is also recommended. The contractor must make higher demands on the supplier and have it in the agreement. If not followed, this will not be accepted. The cost of a third-party logistics is more expensive than if the contractor did it himself but they gain production hours and that a critical part like the lift is used for a larger part of the day. On the inner workplace deployment plan, the material is placed near where it should be mounted and the gypsum is placed in the middle of the rooms where no inner wall will stand.
APA, Harvard, Vancouver, ISO, and other styles
24

LORAUX, JEAN-CHRISTOPHE. "Hypercalcemie apres transplantation renale : a propos d'un cas d'hyperparathyroidisme traite par le pamidronate de sodium (apd)." Besançon, 1991. http://www.theses.fr/1991BESA3087.

Full text
APA, Harvard, Vancouver, ISO, and other styles
25

Lundblad, Roth Rebecka, and Carlstedt Ludwig Jerräng. "Brandskydd under byggtid med BIM : Förbättringsmöjligheter för brandskyddet under byggtid i skedesstyrda APD-planer med BIM." Thesis, Luleå tekniska universitet, Byggkonstruktion och brand, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-70059.

Full text
Abstract:
Vid en brand på byggarbetsplatsen finns det risk för personskador, skador på egendom och att byggproduktionen hamnar i ett driftstopp som kan bli kostsamt. Det finns brister vid planeringen av brandskyddet under byggtid (BUB) och vid olika arbetsmoment på byggarbetsplatsen. Planeringen av BUB behöver förbättras utefter hur en byggarbetsplats, och således brandrisker, förändras under byggproduktionen. Ett förslag på hur detta skulle kunna förbättras är att BUB är med i produktionsplaneringen och redovisas på arbetsplatsdispositionsplaner (APD-planer). Arbetsmoment som kan vara en brandrisk borde också planeras tillsammans med BUB för en brandsäkrare byggarbetsplats. Brandskyddsprojektering är idag till stor del inte inkluderat i det digitala arbetssättet som Building Information Modeling (BIM) innebär. Att brandkonsulten inte är med och arbetar i BIM leder till att de fördelar som finns med samverkan mellan olika discipliner inte kan utnyttjas. Den forskning som finns rörande brandskydd i BIM idag fokuserar på projektering av den färdiga byggnaden och hur brandskydd ska kunna inkluderas i BIM. Det finns idag ingen forskning som berör både brandskydd på byggarbetsplatsen och BIM-projektering av byggarbetsplatsen. Detta leder till ett kunskapsglapp mellan BIM som arbetssätt på byggarbetsplatsen och planering av BUB. På grund av de påträffade problemområdena syftade studien till att undersöka förbättringsmöjligheter för brandskyddet under byggtid. Detta genom att kartlägga förutsättningar och tillämpbara områden där BUB kan inkluderas i arbetet med APD-planer och tidsberoende BIM-modeller. Målet med studien var att framta ett underlag till framtida arbetsmetoder där BUB, APD-planer och BIM på byggarbetsplatser används tillsammans. För att uppfylla syftet utfördes en litteraturstudie och en intervjustudie. Litteraturstudien gjordes för att granska publicerat material rörande BUB, byggarbetsplatsplanering med APD-planer samt BIM på byggarbetsplatsen och BIM med hänsyn till brandskydd. Intervjustudien gjordes för att få en inblick i hur personer använder sig av BUB, APD-planer och BIM på byggarbetsplatser (i praktiken). Den information som framkom från teoretisk kunskap och praktiska erfarenheter analyserades för att kartlägga förutsättningar och tillämpbara områden där BUB kan inkluderas i arbetet med APD-planer och tidsberoende BIM-modeller. Detta för att kunna överbrygga gapet som finns mellan BUB, APD-planer och användandet av BIM på byggarbetsplatser. De identifierade områden som framtagits är planering, kommunikation samt kontroll och uppföljning. För att kunna arbeta med BUB och skedesstyrda APD-planer i BIM inom de identifierade områdena finns det krav på vissa grundläggande förutsättningar. För att kunna ta fram APD-planer och göra dessa skedesstyrda i BIM-modellen krävs det utbildning för att få nödvändig kunskap och kompetens hos både projekteringen och produktionen. Det kommer också krävas ett tidigt samarbete mellan produktionen och projekteringen för att täcka alla kompetensområden som behövs vid planering av produktionen av en byggnad med BIM. För att kunna projektera APD-planer i BIM är det även en förutsättning att alla discipliner arbetar i BIM-modellen. Saknas det information, exempelvis landskap, går det inte att göra fullständiga APD-planer över byggområdet i BIM. Att ta fram skedesstyrda APD-planer där BUB inkluderas i en BIM-modell har i denna studie visat sig vara fördelaktigt inom flera områden. Att planera BUB tillsammans med APD-planer ivgör att brandskyddet på byggarbetsplatsen kan planeras med hänsyn till produktionen och att kraven går att genomföra utan att produktionen blir lidande. Med skedesstyrda APD-planer i en BIM-modell blir det möjligt att visualisera förändringarna på byggarbetsplatsen och på så vis även förutspå vilka brandrisker som uppkommer under olika skeden i byggnationen. BUB inkluderat i en BIM-modell kan vara ett verktyg för att förbättra kommunikationen på byggarbetsplatsen. Detta genom att informationen som läggs in blir mer projektspecifik vilket leder till att BUB blir lättare att förmedla, tydligare att följa och mer förståelig. Med bättre information och ökad kunskap om BUB kan kontroll och uppföljning utföras effektivare och därmed förbättra brandskyddet genom att kontrollerna utförs med en högre kvalité. Detta ger förhoppningen om att brandskydd under byggtid blir en större del av planering och projektering av byggarbetsplatsen samt leder till en säkrare byggarbetsplats.
In case of a fire at a construction site there is a risk of personal injury, property damage and stop in the building production that may be costly. There are shortcomings in the planning of fire safety at the construction site and at different construction methods. The planning of fire safety at construction sites are also in need of improvements according to how a construction site, and thus risks of fire, change during construction production. This by planning the fire safety along with the production of the building and that the fire safety is presented on workplace disposition plans. Fire protection design is mostly not included in the digital work method that Building Information Modeling (BIM) implies. The fact that the fire consultant is not involved with and works in BIM means that the benefits of collaboration between different disciplines cannot be utilized. The research on fire protection in BIM today focuses on the design of the completed building and how fire protection can be included in BIM. There is currently no research regarding both fire safety at the construction site and BIM modelling of the construction site. This leads to a gap between BIM as a working method at the construction site and the planning of fire safety. Because of mentioned problem areas, the study’s purpose was to investigate improvements for fire safety on construction sites. This by mapping out conditions and applicable areas where fire safety can be included in the planning of workplace disposition plans in time-dependent BIM models. The aim of the study was to provide a basis for future work methods in which fire safety, workplace disposition plans and BIM at construction sites are used together. To fulfill the purpose, a literature study and an interview study were conducted. The literature study was conducted to review published material regarding fire safety, construction site planning with workplace disposition plans, BIM at the construction site and BIM with fire safety design. Interviews were conducted to gain an insight into how people use fire safety documents, workplace disposition plans and BIM on construction sites (in practice). The information derived from theoretical knowledge and practical experience was analyzed to map the conditions and applicable areas where fire safety can be included in the planning of workplace disposition plans and time-dependent BIM models. This to bridge the gap between fire safety, workplace disposition plans and the use of BIM on construction sites. The identified areas that have been established are planning, communication and control and follow-up. To be able to work with fire safety and workplace disposition plans in time-dependent BIM model within the identified areas, there are some basic conditions that needs to be fulfilled. To be able to develop workplace disposition plans and make these time-dependent in the BIM model, education is needed to get the necessary knowledge and skills in both the design and production. There also needs to be an early collaboration between production and design to cover all areas of expertise needed in planning the production of a building with BIM. To be able to design workplace disposition plans in BIM, it is also a prerequisite that all disciplines work in the BIM model. If there is no information, such as information of the landscape, it is not possible to complete workplace disposition plans over the whole construction site in BIM. To develop time-dependent workplace disposition plans where fire safety are included in a BIM model, this study has proven to be beneficial in several areas. Planning the fire safety together with workplace disposition plans allows the fire protection at the construction site to be planned viregarding production and that the fire safety requirements can be implemented without the production being compromised. Time-dependent workplace disposition plans in a BIM model make it possible to visualize the changes at the construction site, thus predicting fire risks during different stages of the construction. Fire safety included in a BIM model can be a tool for improving communication at the construction site. This is because the information about the fire safety on construction sites inserted becomes more project-specific, which means that the information about the fire safety requirements can be easier to convey, clearer to follow and more understandable. With better information and increased knowledge about fire safety on construction sites, control and follow-up can be performed more effectively and therefore improving the fire safety by performing the controls with a higher quality. This gives the hope that fire protection during construction will be a major part of planning and designing the construction site and that this will lead to a safer construction site.
APA, Harvard, Vancouver, ISO, and other styles
26

Muniz, Bárbara Nicola Barbosa. "Is the 0.7% goal of ODA/GNI still adequate?" Master's thesis, Instituto Superior de Economia e Gestão, 2020. http://hdl.handle.net/10400.5/20925.

Full text
Abstract:
Mestrado em Desenvolvimento e Cooperação Internacional
Esta dissertação tem como objetivo verificar se a meta da ajuda internacional de 0,7% da renda nacional dos países ricos a ser destinada à ajuda ao desenvolvimento ainda é adequada às condições mundiais atuais. Para tal, a dissertação investiga as origens da meta e as principais teorias econômicas e o contexto político que a fundamentaram. A revisão teórica mostrou que as teorias e modelos econômicos que embasaram a meta e sua lógica de assistência internacional são, em geral, considerados desatualizados no meio acadêmico. A análise empírica utilizou como metodologia o Two-Gap Model - com as mesmas premissas feitas para criar a meta na década de 1960, mas utilizando dados atuais - para estimar os valores da meta para os anos 2014-2019. Os resultados mostraram que, para quase todas as hipóteses, o montante da ajuda necessária para o desenvolvimento dos países pobres seria menor do que a meta sugere. Além disso, ao analisar diferentes regiões, foram encontrados números distintos para a meta, o que revela que a meta de 0,7% generalizou erroneamente as necessidades dos países em desenvolvimento.
This dissertation aims to verify whether the international aid target of 0.7% of the rich countries' national income to be destined to development aid is still adequate to the world current conditions. In order to do so, it investigates the origins of the target and the main economic theories and political context that underpinned it. The theoretical review showed that the economic theories and models that supported the target and its aid rationale are in general considered outdated in the academic field. The empirical analysis used the Two-Gap Model methodology - with the same assumptions made to create the target in the 1960s but using current data - to estimate the target's values for the years 2014-2019. The results showed that, for almost all assumptions, the amount of aid needed for the development of poor countries would be less than the target suggests. Furthermore, when analyzing different regions, distinct figures were found for the target, which reveals that the 0.7% target has wrongly generalized the developing countries' needs.
info:eu-repo/semantics/publishedVersion
APA, Harvard, Vancouver, ISO, and other styles
27

Fang, Xiaochao. "Design and integration of a low-noise readout chain in CMOS technology for APD-based sall-animal PET imaging." Strasbourg, 2011. http://www.theses.fr/2011STRA6021.

Full text
Abstract:
Cette thèse présente mon travail de recherche sur la conception d'une chaîne de lecture dédiée à la TEP (Tomographie à Emission de Positons) fondée sur l'APD (Avalanche Photo Diode) pour les petits animaux. Le laboratoire IPHC (Institut Pluridisciplinaire Hubert Curien, UMR 7178) est en train de développer un système d'imagerie multimodale dénommé AMISSA (A Multimodality Imaging System for Small Animal) dédié au petit animal. L'AMISSA est composé par un micro imageur TDMX (micro TomoDensitoMétrie X), un micro imageur TEMP (Tomographie d'Emission Mono Photonique) et un micro imageur TEP. Le TDMX et le TEMP ont été réalisés. L'imagerie TEP permettra d'ajouter la modalité manquante au banc d'imagerie. Deux prototypes ont été développés afin de réaliser la chaîne de lecture complète dédiée à l'APD. Le premier prototype APD Chip est un circuit bas bruit de dix voies. Chaque voie est constituée d'un CSA (Charge Sensitive Amplifier), d'un CR-(RC)2 « shaper » et d'un « buffer » analogique. Le test montre que l'ENC (Equivalent Noise Charge) à l'entrée est égal à 275 ± 2 e- + 10 e-/pF pour un « shaping time » de 136 ns. Le deuxième prototype PETROC est un microcircuit mixte qui comprend un PDH (Peak Detect and Hold) d'huit voies et un TDC (Time-to-Digital Converter) de cinq voies. L'erreur sur le pic détecté est inférieure à 0. 7%. Une interpolation multi-niveaux est incluse dan la conception du TDC afin d'obtenir une plage de mesure de 10 µs et un pas de 20 ps. Dans ce texte, des analyses théoriques et des prototypes sont présentés, ainsi que la conception des circuits. Les résultats des tests du premier prototype sont également exposés
This thesis presents my research work on the conception of a readout chain dedicated to the APD (Avalanche Photo Diodes)-based PET (Positron Emission Tomography) imaging for small animal. The PET imaging allows the conjunction of its modality with the micro CT (X-ray Computerized Tomography) and micro SPECT (Single Photon Emission Computed Tomography) imaging which have been developed at IPHC (Institut Pluridisciplinaire Hubert Curien, UMR 7178). These three imaging compose a multi-modality imaging system for small animal (AMISSA). Two prototypes have been designed in order to finally realize the complete readout chain. The first one (called APD Chip) is a ten-channel low noise front-end circuit. Every channel consists of a Charge Sensible Amplifier (CSA), a CR-(RC)2 shaper, and an analogue buffer. The Equivalent Noise Charge (ENC) in input from test is equal to 275 ± 2 e- + 10 e- /pF for a shaping time of 136 ns. The second prototype PETROC is a mixed circuit. It comprises an eight-channel Peak Detect and Hold (PDH) circuit and a five-channel Time-to-Digital Converter (TDC). The simulation shows that the error is less than 0. 7% over the whole dynamic range. A multi-level interpolation was implemented in the TDC design to obtain a measurement range up to 10 µs and a bin size of 20 ps. In this thesis, the prototypes are presented for both their theoretical analyses and their circuit designs. The test results of the first prototype are also presented
APA, Harvard, Vancouver, ISO, and other styles
28

Diallo, Amadou. "Investir en afrique : le point de vue des entreprises chinoises : le cas du Mali." Thesis, Pau, 2012. http://www.theses.fr/2012PAUU2004/document.

Full text
Abstract:
Cette recherche vise à améliorer notre compréhension sur les stratégies de pénétration des entreprises chinoises en Afrique du point de vue des entreprises chinoises. La littérature en stratégie internationale souligne la nécessité de choix d’un contexte précis de l’étude de celle-ci. Cependant, la perception des entrepreneurs chinois au regard des investissements qu’ils effectuent en Afrique est quasiment inexistante dans la littérature. Notre thèse tente d’éclairer les différentes stratégies d’implantation des entreprises chinoises dans le contexte africain. L’implantation de ces entreprises sur le continent s’avère-t-elle judicieuse pour leur croissance ? Comment parviennent-elles à s’adapter à l’élargissement de leur périmètre géographique et à gérer la distance physique, culturelle, institutionnelle et psychologique qui les sépare de leurs partenaires potentiels ? Pour ce faire, nous avons conduit une démarche de recherche en trois étapes :Une première phase consacrée à la recherche documentaire et à l’exploration des entreprises chinoises au Mali. Cela pour constituer la littérature de notre recherche. Une deuxième phase empirique a été conduite sur la base de questionnaire auprès de 18 entreprises chinoises sans distinction. Une phase descriptive/prescriptive a permis de prolonger la réponse apportée à notre problématique de recherche en proposant une analyse transversale des différents cas étudiés. Cette recherche démontre l’importance de la perception des entrepreneurs chinois pour une meilleure compréhension du processus d’implantation des entreprises chinoises en Afrique et en particulier au Mali
This research aims to improve our understanding of the entry strategies of Chinese enterprises in Africa from the perspective of Chinese enterprises. Literature in international strategy emphasizes the need for choosing a specific context of the study thereof. However, the perception of Chinese entrepreneurs in terms of when investing in Africa is virtually nonexistent in the literature. This thesis attempts to illuminate the different implementation strategies of Chinese enterprises in the African context. The implementation of these companies on the continent is she smart for their growth? How do they adapt to expanding their geographic scope and manage the physical distance, cultural, institutional and psychological that separates them from their potential partners? To do this, we conducted a research approach in three steps : The first phase devoted to information retrieval and exploration of Chinese enterprises in Mali. This to be the literature of our research. A second empirical phase was conducted on the basis of a questionnaire with 18 Chinese companies alike. A phase descriptive / prescriptive has extended the response to our research problem by proposing a cross-sectional analysis of the different cases studied. This research demonstrates the importance of the perception of Chinese entrepreneurs to better understand the implementation process of Chinese enterprises in Africa and especially in Mali
APA, Harvard, Vancouver, ISO, and other styles
29

Bodnarik, Julia G., Dave Hamara, Michael Groza, Ashley C. Stowe, Arnold Burger, Keivan G. Stassun, Liviu Matei, Joanna C. Egner, Walter M. Harris, and Vladimir Buliga. "Neutron detector development for microsatellites." SPIE-INT SOC OPTICAL ENGINEERING, 2017. http://hdl.handle.net/10150/627176.

Full text
Abstract:
We present a preliminary design for a novel neutron detection system that is compact, lightweight, and low power consuming, utilizing the CubeSat platform making it suitable for space-based applications. This is made possible using the scintillating crystal lithium indium diselenide ((LiInSe2)-Li-6), the first crystal to include Li-6 in the crystalline structure, and a silicon avalanche photodiode (Si-APD). The schematics of this instrument are presented as well as the response of the instrument to initial testing under alpha, gamma and neutron radiation. A principal aim of this work is to demonstrate the feasibility of such a neutron detection system within a CubeSat platform. The entire end-to-end system presented here is 10 cm x 10 cm x 15 cm, weighs 670 grams and requires 5 V direct current at 3 Watts.
APA, Harvard, Vancouver, ISO, and other styles
30

Duncan, Julianne Christine. "A Prototypical Analysis of Antisocial Personality Disorder: Important Considerations for the DSM-IV." Thesis, University of North Texas, 1993. https://digital.library.unt.edu/ark:/67531/metadc500744/.

Full text
Abstract:
Antisocial Personality Disorder (APD) represents a controversial diagnoses which has gone through many revisions over the past 25 years and is scheduled to be revised again for the DSM IV. A comprehensive survey was composed of APD criteria from the DSM II, DSM III, DSM III-R, PCL-R, Psychopathic Personality Disorder, and Dyssocial Personality Disorder. The survey was completed by 321 forensic psychiatrists based on which criteria they believed to be the most prototypical of antisocial personality. The results identified four factors: irresponsibility, unstable self image, and unstable relationships; manipulation and lack of guilt; aggressive behavior; and nonviolent juvenile delinquency. A diagnostic set composed of the most prototypical criteria was proposed for the DSM IV diagnosis of APD.
APA, Harvard, Vancouver, ISO, and other styles
31

Riggins, Benjamin Kirby. "Development of a Multi-Disciplinary Design Optimization Framework for a Strut-Braced Wing Transport Aircraft in PACELAB APD 3.1." Thesis, Virginia Tech, 2015. http://hdl.handle.net/10919/52912.

Full text
Abstract:
The purpose of this study was to extend the analysis methods in PACELAB APD 3.1, a recent commercially available aircraft preliminary design tool with potential for MDO applications, for higher fidelity with physics-based instead of empirical methods and to enable the analysis of nonconventional aircraft configurations. The implementation of these methods was first validated against both existing models and wind tunnel data. Then, the original and extended PACELAB APD versions were used to perform minimum-fuel optimizations for both a traditional cantilever and strut-braced wing aircraft for a medium-range regional transport mission similar to that of a 737-type aircraft, with a minimum range of 3,115 nm and a cruise Mach number of 0.78. The aerodynamics, engine size / weight estimation and structural modules were heavily modified and extended to accomplish this. Comparisons to results for the same mission generated with FLOPS and VT MDO are also discussed. For the strut-braced configuration, large fuel savings on the order of 37% over the baseline 737-800 aircraft are predicted, while for the cantilever aircraft savings of 10-30% are predicted depending on whether the default or VT methods are utilized in the PACELAB analysis. This demonstrates the potential of the strut-braced configuration for reducing fuel costs, as well as the benefit of MDO in the aircraft conceptual design process. For the cantilever aircraft, FLOPS and VT MDO predict fuel savings of 8% and 23%, respectively. VT MDO predicts a fuel savings of 28% for the strut-braced aircraft over the baseline.
Master of Science
APA, Harvard, Vancouver, ISO, and other styles
32

Urban, Martin [Verfasser]. "Design eines neuen Lichtpulsersystems sowie Aufbau und Inbetriebnahme der neuen APD Auslese für das Crystal-Barrel-Kalorimeter / Martin Urban." Bonn : Universitäts- und Landesbibliothek Bonn, 2018. http://d-nb.info/1154485900/34.

Full text
APA, Harvard, Vancouver, ISO, and other styles
33

Bleiweiss, Michelle L. "The Relationship Between Self-Perceived Benefit as Measured by the APHAB, COSI and CPHI and the Presence of APD in an Elderly Population." Scholar Commons, 2001. https://scholarcommons.usf.edu/etd/1514.

Full text
Abstract:
The self-perceived hearing aid benefit of 38 participants was examined. Of the 38 subjects, 8 were found to have an auditory processing disorder as measured by the Dichotic Sentence Identification (DSI). When compared to the non-APD subjects, there were essentially no significant differences on the APHAB or COSI outcome measures. However, two of the 5 scales of the CHPI did show significant differences. In conclusion, these results do not support the notion of APD having a negative effect on hearing aid benefit. No finding in this study was robust and although there were several trends supporting that APD may impede an individual from receiving their full potential of benefit, this finding is not necessarily so.
APA, Harvard, Vancouver, ISO, and other styles
34

Rhee, Han-Bum [Verfasser], Thorsten [Akademischer Betreuer] Kröll, and Joachim [Akademischer Betreuer] Enders. "Investigation of the response of a CALIFA demonstrator and development of an APD test stand / Han-Bum Rhee ; Thorsten Kröll, Joachim Enders." Darmstadt : Universitäts- und Landesbibliothek Darmstadt, 2018. http://d-nb.info/1187444383/34.

Full text
APA, Harvard, Vancouver, ISO, and other styles
35

Jradi, Khalil. "Etude et Réalisation de photodétecteurs de type APD Geiger pixellisés à très haute sensibilité pour l'astronomie gamma Très Haute Energie." Phd thesis, Université Paul Sabatier - Toulouse III, 2010. http://tel.archives-ouvertes.fr/tel-00547478.

Full text
Abstract:
L'astronomie gamma des Très Hautes Energies utilise jusqu'à aujourd'hui exclusivement comme détecteurs le Photomultiplicateur à Tube (PMT) pour capter les faibles flux lumineux des gerbes atmosphériques. Mais une alternative commence à apparaitre : les photodiodes à avalanche polarisées en mode Geiger appelées APD Geiger. Le PMT est un détecteur conçu dans les années 70 qui présente certes de nombreux avantages mais qui souffre également d'inconvénients comme la taille, le coût, le poids ou encore la sensibilité aux champs magnétiques et surtout la difficulté à réaliser une pixellisation en matrice. Les APD-Geiger, sont des dispositifs à semi-conducteur composés d'une jonction PN intégrée dans une technologie spéciale pour la détection de très faible flux lumineux grâce à leur polarisation au delà de la tension d'avalanche. Les APD-Geiger présentent un gain de photoélectrons très élevé (~106), bien que dépendant fortement de la tension de polarisation au delà de l'avalanche. Ces photodiodes présentent de nombreux avantages par rapport aux photomultiplicateurs, notamment du point de vue de leur miniaturisation pour des applications basées sur l'imagerie, comme la détection de flashs Tcherenkov en astronomie gamma. Dans cette thèse, nous présentons l'étude, la conception et la réalisation de cette structure technologique basée sur du Silicium. Cette structure a montré sa fiabilité pour la détection de faibles flux lumineux avec une tension de claquage de 12V et un courant de fuite ne dépassant pas 10pA au claquage. Nous avons également mis au point, différents modèles physiques et électriques indispensables aux démarches d'optimisation technologiques ainsi qu'au développement des circuits de commande et de lecture, i.e. la base de toute technologie d'imagerie. Le travail présenté ici consiste en l'étude, la conception et la réalisation d'une matrice de pixels à haute sensibilité. Un projet de télescope Cerenkov basé sur cette technologie innovante est finalement présenté
APA, Harvard, Vancouver, ISO, and other styles
36

Jradi, Khalil. "Étude et réalisation de photodétecteurs de type APD Geiger pixellisés à très haute sensibilité pour l'astronomie gamma très haute énergie." Toulouse 3, 2010. http://thesesups.ups-tlse.fr/984/.

Full text
Abstract:
L'astronomie gamma des Très Hautes Energies utilise jusqu'à aujourd'hui exclusivement comme détecteurs le Photomultiplicateur à Tube (PMT) pour capter les faibles flux lumineux des gerbes atmosphériques. Mais une alternative commence à apparaitre : les photodiodes à avalanche polarisées en mode Geiger appelées APD-Geiger. Le PMT est un détecteur conçu dans les années 70 qui présente certes de nombreux avantages mais qui souffre également d'inconvénients comme la taille, le coût, le poids ou encore la sensibilité aux champs magnétiques et surtout la difficulté à réaliser une pixellisation en matrice. Les APD-Geiger, sont des dispositifs à semi-conducteur composés d'une jonction PN intégrée dans une technologie spéciale pour la détection de très faible flux lumineux grâce à leur polarisation au delà de la tension d'avalanche. Les APD-Geiger présentent un gain de photoélectrons très élevé (~106), bien que dépendant fortement de la tension de polarisation au delà de l'avalanche. Ces photodiodes présentent de nombreux avantages par rapport aux photomultiplicateurs, notamment du point de vue de leur miniaturisation pour des applications basées sur l'imagerie, comme la détection de flashs Tcherenkov en astronomie gamma. Dans cette thèse, nous présentons l'étude, la conception et la réalisation de cette structure technologique basée sur du Silicium. Cette structure a montré sa fiabilité pour la détection de faibles flux lumineux avec une tension de claquage de 12V et un courant de fuite ne dépassant pas 10pA au claquage. Nous avons également mis au point, différents modèles physiques et électriques indispensables aux démarches d'optimisation technologiques ainsi qu'au développement des circuits de commande et de lecture, i. E. La base de toute technologie d'imagerie. Le travail présenté ici consiste en l'étude, la conception et la réalisation d'une matrice de pixels à haute sensibilité. Un projet de télescope Cerenkov basé sur cette technologie innovante est finalement présenté
Very High Energy gamma ray astronomy uses till now exclusively as detector the Photomultiplier Tube (PMT) to collect weak light flux of atmospheric showers. But an alternative is now emerging: Avalanche Photodiodes polarized in Geiger mode called "Geiger-APD". The PMT is a detector designed in the 70's which presents many advantages but also suffers from several drawbacks: size, weight, cost, sensitivity to magnetic field but especially difficulty to realize its pixilation in matrix. Geiger-APDs are semi-conductor devices made of PN junction integrated in a special technology to detect very low light flux, thanks to the polarization beyond the avalanche voltage. Geiger-APD presents very high photoelectron gain (˜106) strongly dependant on the polarization voltage beyond avalanche. These photodiodes present many advantages with respect to PMT, mainly as concerns miniaturization for applications based on imaging, such as the detection of Cerenkov flashes in gamma ray astronomy. In this thesis, we present the study, the design and the realization of a technological structure, based on Silicon. This structure has shown reliability to detect weak luminous flux with breakdown voltage at 12V and dark current below 10pA at breakdown. We also developed several models, physical and electrical, necessary to the technological optimization, as well to the development of control and readout circuits, i. E. The basis of any imaging technology. The work presented here consists in the study, the design and the realization of a matrix of high sensitivity pixels. A project of a Cerenkov telescope based on this innovative technology is also presented
APA, Harvard, Vancouver, ISO, and other styles
37

Dula, Erin, Brady Workman, Saravanan Elangovan, and Jacek Smurzynski. "Investigation of Auditory Processing Deficits in Patients with Diabetes Mellitus." Digital Commons @ East Tennessee State University, 2015. https://dc.etsu.edu/etsu-works/1580.

Full text
Abstract:
The incidence of Diabetes Mellitus (DM) is about 9.6% in the US, and its prevalence is increasing rapidly and globally (NIDDKD, 2007). A common, but under-recognized, complication of DM is hearing difficulties. Although epidemiological studies (Bainbridge, et al., 2008) suggests that individuals with diabetes are twice as likely to have hearing loss as non-diabetic individuals, research on DM-related auditory deficits is relatively sparse and have been inconclusive and/or ambiguous regarding the nature of the hearing loss. We tested the hypothesis that the DM-related listening difficulties are manifestations of subclinical deficit(s) in higher-order auditory processing. Following a routine audiological evaluation, we examined a group of adult DM (Type II) patients with tests that assessed peripheral (high-frequencyaudiometry) and central processing (spatial listening, listening in competing noise, temporal processing and contralateral-suppression of OAEs) abilities. Our results indicate elevated high frequency pure-tone (>4 kHz) thresholds, increased difficulty listening in competing noise, poorer spatial listening skills, and poorer temporal processing abilities in the group of DM patients when compared to controls. These results suggest that central auditory processing deficits in patients with DM are more striking than commonly investigated peripheral deficits and thus contribute, and probably exacerbate, the functional listening difficulties experienced by these patients.
APA, Harvard, Vancouver, ISO, and other styles
38

Workman, Brady, Virginia Ingram, Saravanan Elangovan, Jacek Smurzynski, and Marc Fagelson. "Diabetes Mellitus and the Effects on Auditory Processing." Digital Commons @ East Tennessee State University, 2017. https://dc.etsu.edu/etsu-works/1572.

Full text
Abstract:
Diabetes mellitus (DM) is a systemic disease that affects a number of sensory systems and is a major public health concern. A common, but under-recognized complication of DM is hearing difficulty. However, research on DM-related auditory deficits is relatively sparse. Recent data shows over a two-fold higher prevalence of hearing impairment in diabetic patients compared to non-diabetic individuals, further solidifying this strong association between diabetes and hearing loss. However, the nature of these hearing difficulties has not been clearly elucidated. In the present study, the auditory processing abilities of a group of adults (N = 9; mean age = 53.3) with type 2 DM was compared to an age matched control group (N = 9; mean age= 47.6). In addition, visual processing abilities of the participants were examined to determine if the hearing difficulties associated with DM were a function of a more global sensory deficit. The selection criteria for the DM group included age, duration of diabetes (> 5 years), and recent measures of diabetic control (hemoglobin A1C and blood sugar). Further, all participants in the test and control groups had a comprehensive hearing evaluation and had hearing (measured with pure tones 250-4000 Hz) within normal limits bilaterally. The following test measures were recorded. The Michigan Neuropathy Screening Instrument (MNSI) was administered to screen each subject for peripheral neuropathy symptoms. The Speech, Spatial & Qualities (SSQ12) questionnaire was administered to attain a measure of each individuals subjective hearing complaints. Subtle deficits in the peripheral auditory system were examined using (a) Extended high frequency audiometry, that assessed ultra high frequencies from 9000-16000 Hz bilaterally, (b) The Threshold Equalizing Noise (TEN) test, to assess for potential dead regions within the cochlea, and (c) Distortion product otoacoustic emissions (DPOAE) were collected bilaterally to assess frequency specific cochlear outer hair cell function. Higher-order auditory processing was examined with the Quick Speech in Noise Test (QuickSIN), the Listening in Spatial Noise test-Sentences (LiSN-S) and the Random gap detection, to measure temporal processing abilities. Further, the Text Reception Threshold Test (TRT) was employed to examine visual processing abilities. The results revealed that individuals with DM had significantly (a) Elevated high frequency (> 4 kHz) pure tone thresholds; (b) Increased self-reported hearing difficulties based on SSQ12 scores (c) Poorer spatial listening in noise skills based on LiSN results, (d) Lower DPOAE amplitudes for higher frequencies, and (e) Poorer temporal processing skills based on the average gap detection thresholds, when compared to the age-matched controls. These findings not only support the strong association between diabetes and hearing loss, they suggest that that even individuals with controlled diabetes potentially suffer with subclinical auditory processing deficits that may affect their quality of life. These findings have implications in the management of DM in the future. Further research is needed in order to determine clinically feasible means of evaluating DM subjects.
APA, Harvard, Vancouver, ISO, and other styles
39

Munter, John, and Erik Pålsson. "Materialhandling, A study on common problems at the construction site." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-142885.

Full text
Abstract:
Kostnaderna för byggnadsprojekt ökar varje år, detta beror på ett flertal faktorer såsom nya standarder, synen på att bygga miljövänligt samt hårdare krav från byggherrar som vill få projekten klara på kortare tid. För att kunna möta kraven måste byggföretagen hitta nya sätt för att bygga mer effektivt och lönsamt. Ett område med potential för utveckling är logistiken runt om och på arbetsplatsen. Arbetet utgår från bygglogistik, mer specifikt materialhantering samt lossning på arbetsplatsen. Studien har utförts på två olika byggarbetsplatser i Linköping för att kunna analysera likheter och skillnader mellan arbetsplatserna då de har olika förutsättningar. Studien undersöker och belyser de mest kritiska momenten på arbetsplatserna, identifierar hur problemen uppstår och möjliga lösningar till dessa. Data som studien bygger på har samlats in genom intervjuer och observationer. Studien visar på att en stor del utav de problemen som observerades hade kopplingar till planeringen i form utav APD-planer, bristfällig kommunikation samt platsbrist på bygget.
APA, Harvard, Vancouver, ISO, and other styles
40

Elangovan, Saravanan. "Auditory Processing Disorders in Children." Digital Commons @ East Tennessee State University, 2013. https://dc.etsu.edu/etsu-works/1577.

Full text
APA, Harvard, Vancouver, ISO, and other styles
41

Pellion, Denis. "Modélisation, fabrication et évaluation des photodiodes à avalanche polarisées en mode Geiger pour la détection du photon unique dans les applications Astrophysiques." Phd thesis, Université Paul Sabatier - Toulouse III, 2008. http://tel.archives-ouvertes.fr/tel-00358847.

Full text
Abstract:
La genèse des travaux présentés dans ce mémoire se situe dans le domaine de l'astrophysique des très hautes énergies. Il y a un siècle les scientifiques de la planète ont identifié un nouveau type de messagers venant de l'espace : les rayons cosmiques. Ce rayonnement est constitué de particules (photons et autres) de très haute énergie qui bombardent la terre en permanence. Le passage de rayonnements cosmiques dans l'atmosphère terrestre se traduit par la génération de brefs éclairs lumineux (5ns) d'une intensité très faible (1pW) : le flash Tcherenkov, devenant alors visible du sol.

Dans l'état de l'art le meilleur détecteur de lumière est aujourd'hui le Photomultiplicateur (PMT), grâce à ses caractéristiques de sensibilité et de vitesse. Mais il présente quelques inconvénients : faible efficacité quantique, coût, poids etc. Nous présentons dans cette thèse une nouvelle technologie alternative : les compteurs de photons sur semi-conducteur, constitués de photodiodes polarisées en mode Geiger.
Ce mode de fonctionnement permet d'obtenir un effet de multiplication au moins identique à celui des PMT. Un modèle physique et électrique a été développé pour reproduire le comportement de ce détecteur.
Nous présentons ensuite dans ce travail de thèse un procédé technologique original permettant la réalisation de ces dispositifs dans la centrale de technologie du LAAS-CNRS, avec la simulation de chaque opération du processus.
Nous avons mis au point une fiche pour la caractérisation électrique des dispositifs, du mode statique au mode dynamique, et vérifié la conformité aux simulations SILVACO, et au modèle initial. Les résultats obtenus sont déjà excellents, compte tenu qu'il s'agit d'une première étape de prototypage, et comparables avec les résultats publiés dans la littérature.
Ces composants sur silicium peuvent intervenir dans toutes les applications où il y a un photomultiplicateur, et le remplacer. Les applications sont donc très vastes et la croissance du marché très rapide. Nous présentons une première expérience d'astrophysique installée au Pic du Midi qui a détecté des flashs Tcherenkov de rayons cosmiques avec cette nouvelle technologie à semi-conducteur.
APA, Harvard, Vancouver, ISO, and other styles
42

Lahbabi, M'hammed. "Evaluation analytique des performances du photodétecteur à absorption et multiplication séparées (SAM-APD) - 2,55 "mu"m p+ - n GaAlSb/n-GaInAsSb." Montpellier 2, 1990. http://www.theses.fr/1990MON20126.

Full text
Abstract:
Ce travail a consiste a mettre en place les outils de calcul necessaires pour evaluer les performances d'un photodetecteur a avalanche a absorption et multiplication separees (sam-apd) permettant la photodetection dans la gamme de longueurs d'onde autour de 2,5 um. On precise les parametres technologiques necessaires ainsi que les performances du photodetecteur realisable actuellement. L'influence des principaux parametres est mise en evidence
APA, Harvard, Vancouver, ISO, and other styles
43

Elangovan, Saravanan. "(Central) Auditory Processing Disorders: A Hearing Loss of the Brain." Digital Commons @ East Tennessee State University, 2016. https://dc.etsu.edu/etsu-works/1574.

Full text
APA, Harvard, Vancouver, ISO, and other styles
44

Yasin, Bilal, and Ramaputa Berhane. "FÖRBÄTTRING OCH RATIONALISERING AV LOGISTIK OCH MATERIELLEVERANS : RÖRANDE OMBYGGNATION OCH NYBYGGNATION." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-44922.

Full text
Abstract:
Logistics and material delivery are important aspects in a building project where it has direct impact on the workflow and production schedule. Research on this subject has studied where one sees great opportunities for improvement. The research says that the delivery precision, construction site lay out plan and the productivity can be managed more efficiently and as a result canreduce construction costs up to 25-30%. This degree project examines and compares two building projects in Eskilstuna, one conversion (Högvakten 1) and a new construction (Kv. näven). The basis for the improvement work is of Toyota's production philosophy that has been studied and also known asLean production where great importance is put on streamlining production by removing unnecessary work that does not increase added value of the end product. Examination of the construction site plan for each project and interviews was carried out by internal/external staff to be able to create a better understanding of the different workplaces. To study productivity at the workplaces fieldstudies were done through taking time of different work tasks that were divided into different categories. This was done on two separate days for each workplace. The first occasion was when a material delivery occurred, and the second day was a day without material delivery.  Finally, a questionnaire was designed with different solutions that were developed with the help of theliterature study, the interviews and sitevisits. The survey shows what the different construction sites think about the solutions where the result is described with percentage and opinones.
APA, Harvard, Vancouver, ISO, and other styles
45

Ballukja, Erjon. "Power Quality Analysis in DC/DC Converters under Steady State and Transient Conditions." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2020.

Find full text
Abstract:
The modern electric power systems are going through significant changes because of continuous increasing demand of electric power. Further, a growing number of renewable energy systems that directly deliver DC power jointly considered with the advance in DC technology allows a more efficient and affordable use of energy. Furthermore, a rising use of DC systems and microgrids in a wide number of applications has motivated the study of Power Quality (PQ). The concept of power quality in DC systems and microgrids brings many challenges and the aim of this thesis is to understand the delivered power quality in DC microgrid systems. In this thesis, the effects of low frequency range (0-2 kHz) conducted emissions on power quality from a microgrid based DC/DC converter under steady state and transient loading conditions represent the main purpose of this work. Indeed, for a DC distribution network there is a lack of standards and guidelines concerning power quality issues and acceptable levels of conducted disturbances in the aforementioned frequency range. Consequently, the objective of this thesis is to quantify adequate power quality indices for DC systems or networks with connected loads such as Low Frequency Sinusoidal Disturbance (% LFSD) and Amplitude Probability Distribution (APD) indices.
APA, Harvard, Vancouver, ISO, and other styles
46

Saleh, Yassin Salahuddin [Verfasser]. "Einblick in die Arbeit des ambulanten Palliativdienstes (APD) des Palliativzentrums am Malteser Krankenhaus Bonn/Rhein- Sieg in Bonn und Umgebung / Salahuddin Saleh Yassin." Bonn : Universitäts- und Landesbibliothek Bonn, 2016. http://d-nb.info/1107542502/34.

Full text
APA, Harvard, Vancouver, ISO, and other styles
47

Holmström, Rasmus, and Anders Pettersson. "Hur planeras byggarbetsmiljö i produktion? : En kvalitativ studie i hur byggarbetsmiljön kan stärkas med hjälp av BIM i 4D och bättre APD-planer." Thesis, KTH, Byggteknik och design, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-231780.

Full text
Abstract:
Byggarbetsmiljön i Sverige blir allt viktigare. I takt med högre tempo, större konkurrens och komplexaprojekt måste arbetsmiljön prioriteras för att skydda de arbetare som finns ute i landet. Trotsnutidens digitala teknik används ofta traditionella verktyg som papper och penna för att planeraarbetsmiljön och som ett resultat av detta har olika konsekvenser skett i modern tid. Dessakonsekvenser har b.la. varit personskador men även skyddsstopp som påverkar hela företagetekonomiskt. I detta examensarbete har en kvalitativ undersökning genomförts där flera olika projekt harstuderats. Undersökningen har kartlagt vilka metoder som används för att planera arbetsmiljön påprojekt som använder sig utav både traditionella metoder och projekt som använder sig utav nyareverktyg. Vidare tar arbetet upp vilka effekter olika planeringsmetoder har på arbetsmiljön och vilkamöjligheter som finns i dagsläget när det kommer till att använda sig utav planeringsverktyg i form avprogramvara. Slutligen ges rekommendationer kring hur arbetsmiljön troligtvis kan stärkas med hjälpav moderna verktyg i dagsläget. Om branschen tillämpat bättre och nyare programvara vid planering i större projekt skullearbetsmiljön enklare kunna stärkas och de risker som tidigare varit problematiska undvikas. För attkunna få ett hållbart byggande i Sverige är detta en nyckel då en byggarbetsplats aldrig kan varahållbar utan att vara säker.
APA, Harvard, Vancouver, ISO, and other styles
48

Eriksson, Victoria, and Fanny Unnerfelt. "En hållbar logistiklösning för Järntorgets projekt Klarbäret." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-158205.

Full text
Abstract:
Stockholmsregionen växer sig allt större och efterfrågan på bostäder är hög. Järntorget är ett företag vars kärnverksamhet består av bostadsutveckling, speciellt i attraktiva storstadslägen. Att Järntorget väljer att bygga i attraktiva storstadslägen leder till att många av byggprojekten är lokaliserade i områden med redan tät bebyggelse. Den täta bebyggelsen leder till logistiska problem i form av begränsade utrymmen att leverera och lagra material på. Logistik handlar om att få rätt material på rätt plats, i rätt tid och till rätt kostnad. I den här studien studeras projektet Klarbäret. Klarbäret består av 131 studentlägenheter som ska byggas i centrala Stockholm. Detta leder till att utrymmet är begränsat och det kommer att ställas höga krav på logistiken. Syftet med studien var att identifiera en lämplig logistiklösning för att minska kostnaderna, underlätta byggprocessen och öka effektiviteten vid byggprocessen. Studiens resultat pekade på att Järntorget borde anlita en logistikansvarig som kan vara med under hela processen och ansvara för logistiken. Det rekommenderas att logistikansvarig använder sig av det framtagna logistikdokumentet. Ytterligare ett förslag om att Järntorget ska använda sig av ett bokningssystem för sina transporter. Bokningssystemet skulle göra det lättare för alla berörda på arbetsplatsen att se när under dagen leveranser är beräknade till platsen och för att få leveranserna bättre sprida över dagen. Gällande transporter till bygget kommer materialet för bland annat stommen att behöva omlastas för att få in mindre lastbilar till byggarbetsplatsen på grund av den rådande BK2 klassningen i Stockholms innerstad. För att kunna genomföra detta rekommenderas att ta in ett TPL företag för att kunna minska transporterna genom samlastning. Eftersom det inte finns lagringsmöjligheter på byggarbetsplatsen behöver så mycket material som möjligt lyftas in i själva huskroppen när stommen för det våningsplanet är färdigställt. Det rekommenderas även att anlita ett TPL företag som kan bära in inredningsmaterial utanför arbetstid för att minska kostnader och öka effektiviteten. Vissa saker kommer inte att kunna lagras och behöver därför levereras när det ska användas. Bland annat betongelementen. Detta leder till att det utmynnar i en typ av JIT-lösning men då enbart för stommaterialet.
APA, Harvard, Vancouver, ISO, and other styles
49

Chyad, Yousif, and Khadija Ali. "Logistik vid begränsat utrymme : Jämförelsestudie mellan fyra byggarbetsplatser." Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-260421.

Full text
Abstract:
Planning of material handling in limited spaces has become more relevant in the construction industry and since material cannot always be delivered at the right time in the right place, a delay in the flow chain is created. Each construction site has unique conditions and thus different solutions.In this thesis, four workplaces at Peab have been visited and inspected. The purpose of the thesis was to explore the problems that arise with the logistics in a limited space and find solutions that can be implemented on future construction projects.The aim of the study was to find the common factors that exist for the workplaces within a small area and find ways of working that can change the planning and execution of logistics.Surveys to professional workers and interviews with site managers and supervisors contributed with information to the report.After compiling the thesis work, the result shows that there are opportunities to change the working method of the work management to increase efficiency and productivity.In the study, it appears that there is a lack of communication in the workplaces as a large number of workers do not know when the next delivery of material takes place. In addition, the professional workers admit that they did not have a great influence over the business. Recommended solutions that were developed in the study were experience feedback and further development of the APD plan.
APA, Harvard, Vancouver, ISO, and other styles
50

LU, Zhibo. "Blockade of Slow Component of the Delayed Rectifier K^+ Current (I_) Prolonged Action Potential Duration (APD) without Increasing Dispersion between Ventricles(RIEM Conference II, 2002)." Research Institute of Environmental Medicine, Nagoya University, 2002. http://hdl.handle.net/2237/2807.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography